Open for responses
CGC OAK DOCKSIDE REPAIRS
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
70ZU0227QIBCT0004
NAICS
336611
PSC
J998
Set-aside
Small Business Set Aside - Total
Posted
November 17, 2026
Response due
December 10, 2026
Description
USCGC OAK (WLB 211)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2026
Developed By: Bryan G Wright
(Rev-0, 28 August 2026)
-- 1 of 181 --
USCGC OAK (WLB-225B) DOCKSIDE AVAILABILITY FY2026
ii (Draft-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii
Consolidated List of References ...................................................................................................................iv
Consolidated List of Government-furnished Property .................................................................................ix
Consolidated List of Critical Inspection Items ........................................................................................... xii
Principal Characteristics ............................................................................................................................ xiii
General Requirements ................................................................................................................................... 1
WORK ITEM 1: Fire Prevention Requirements «Dockside» ..................................................................... 14
WORK ITEM 2: Tanks, MP Fuel Service, Clean and Inspect .................................................................... 18
WORK ITEM 3: Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect ...................................... 22
WORK ITEM 4: Tanks, Potable Water, Clean and Inspect ........................................................................ 26
WORK ITEM 5: Hydraulically Operated Cargo Hatch, Inspect and Service ............................................. 30
WORK ITEM 6: Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean .................................... 34
WORK ITEM 7: Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean .................. 37
WORK ITEM 8: Vent Ducts, Engine And Motor Room, All, Commercial Cleaning ................................ 41
WORK ITEM 9: Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning ................................. 44
WORK ITEM 10: Vent Ducts, Laundry Exhaust, Commercial Cleaning .................................................. 47
WORK ITEM 11: Vent Ducts, All Other, Commercial Cleaning ............................................................... 50
WORK ITEM 12: Potable Water Pneumatic Tanks, Clean and Inspect ..................................................... 53
WORK ITEM 13: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift ... 56
WORK ITEM 14: Hydraulic Chain Stoppers, Inspect and Service ............................................................ 62
WORK ITEM 15: Crossdeck Winches, Inspect and Service ...................................................................... 66
WORK ITEM 16: Hydraulic Inhaul Winch, Inspect And Service .............................................................. 72
WORK ITEM 17: Mechanical Chain Stoppers, Inspect and Service .......................................................... 82
WORK ITEM 18: Warping Capstan, Inspect and Service .......................................................................... 85
WORK ITEM 19: Single Point Davit, Inspect and Service ........................................................................ 88
WORK ITEM 20: Welin Lambie Dual Point Davit TWPIV 5.0B, Inspect, Test, and Overhaul ................ 92
WORK ITEM 21: Commissary Hoist, Inspect and Service ...................................................................... 104
WORK ITEM 22: Buoy Crane, Appleton EB600-60-40, Inspect and Service ......................................... 108
WORK ITEM 23: Grey Water Piping, Clean and Flush ........................................................................... 114
WORK ITEM 24: Sewage Piping, Clean and Flush ................................................................................. 118
WORK ITEM 25: Non-Buoy Weather Deck LED Flood Lights, Replace ............................................... 122
WORK ITEM 26: Weathertight Door and Quick Acting Watertight Hatch, Renew ................................ 127
WORK ITEM 27: Galley Supply Fan and Pre-Heater, Renew ................................................................. 132
WORK ITEM 28: Weather Deck Kickpipes, Renew ................................................................................ 135
WORK ITEM 29: Compartment Decks, Preserve .................................................................................... 148
WORK ITEM 30: Deck Covering (Interior Wet), Renew ........................................................................ 151
WORK ITEM 31: Main Mast and Jackstaff Guardline Staples, Renew ................................................... 155
WORK ITEM 32: Deck Covering (Carpeting), Renew ............................................................................ 158
WORK ITEM 33: Deck Covering (Wet/Dry), Seal .................................................................................. 162
WORK ITEM 34: Gooseneck Ventilation, Renew ................................................................................... 164
WORK ITEM 35: Temporary Services, Provide - Cutter ......................................................................... 167
-- 2 of 181 --
USCGC OAK (WLB-225B) DOCKSIDE AVAILABILITY FY2026
iii (Draft-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0)
package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the
current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous
revision. This revised specification is self-contained wit…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 336611
43--SEAL ASSEMBLY,SHAFT,SP
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 30, 2026
USCGC SPAR PERKO 19” Optical Drum Complete Assembly
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due November 24, 2026
USCGC HICKORY (WLB-212) DRYDOCK REPAIR FY27
HOMELAND SECURITY, DEPARTMENT OF · Sources Sought · due December 7, 2026
Original Equipment Manufacturer (OEM) annual operational grooming of the EMS Marcon cargo console
DEPT OF DEFENSE · Solicitation · due November 19, 2026
43--SEAL ASSEMBLY,SHAFT
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 30, 2026
USS MILIUS (DDG 69) 6J1 SIA Bundle# 1, Yokosuka Japan
DEPT OF DEFENSE · Solicitation · due December 17, 2026