Department of Treasury 5th Floor Renovation
TREASURY, DEPARTMENT OF THE
Notice type
Solicitation
Solicitation #
2032H326Q00053
NAICS
236220
PSC
Z2AA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
July 24, 2026
Response due
August 13, 2026
Place of performance
Washington, DC
What this opportunity is
The Department of the Treasury is seeking a contractor for renovations on the 5th floor of a federal office building in Washington, DC, under NAICS code 236220. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, making it suitable for qualified small firms in this category. Interested contractors should note that this is a solicitation notice, indicating that they will need to prepare and submit a bid to compete for the contract.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
-- 1 of 43 --
-- 2 of 43 --
-- 3 of 43 --
-- 4 of 43 --
-- 5 of 43 --
-- 6 of 43 --
-- 7 of 43 --
-- 8 of 43 --
-- 9 of 43 --
-- 10 of 43 --
-- 11 of 43 --
-- 12 of 43 --
-- 13 of 43 --
-- 14 of 43 --
-- 15 of 43 --
-- 16 of 43 --
-- 17 of 43 --
-- 18 of 43 --
-- 19 of 43 --
-- 20 of 43 --
-- 21 of 43 --
-- 22 of 43 --
-- 23 of 43 --
-- 24 of 43 --
-- 25 of 43 --
-- 26 of 43 --
-- 27 of 43 --
-- 28 of 43 --
-- 29 of 43 --
-- 30 of 43 --
-- 31 of 43 --
-- 32 of 43 --
DOWN
DOWN
5404-A
UP
ELEV + 0'- 4.5"
ELEV + 0'- 4.5"
ELEV
+ 0'-0"
ELEV
+ 0'-0"
3/4:12
ELEV + 0'- 0"
VTC
CONFERENCE
ROOM 5428
OFFICE 5211-GG
OFFICES 5012-M
& 5012-J
SRBR No: 25132
100% SUBMISSION -FINAL 03-27-2026 OF
REVISION NOTES
GRAPHIC SCALE
MARK DATE DESCRIPTION
PTL
CERTIFICATIONS
SHEET SIZE:
SHEET
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DRAWING
PROJECT
BUILDING
SUB A/E
PRIME A/E
A/E CON. NO.
CONTRACTORS
FLOOR NO.
FACILITY CODE
PROJECT
A/E TASK NO.
24 x 36
DC-
1 2 3 4 5
A
B
C
D
WASHINGTON, DC
MERIDIEN GROUP / CITADEL DCA
KM
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285
www.meridiengroupllc.com
01/14/2026
5TH FLOOR ALTERATIONS
5TH FLOOR
0025-25
23 JANUARY 2026
100% SUBMISSION
FEDERAL OFFICE BUILDING
N
KEY PLAN
1 2 3 4 5
CAUTION: IF THIS DRAWING IS A REDUCTION THIS GRAPHIC SCALE MUST BE USED
NORTH
MEP: SRBR Engineers Inc.
TRES-2025-012
Phone: 410/869-7282 Web: www.SRBRengineers.com
757 Frederick Road Suite 300 - Catonsville, Maryland 21228
MEP Consulting Engineers since 1959
SRBR
WEST WING
M001
COVER SHEET MECHANICAL
MECHANICAL SPECIFICATIONS
1. Furnish and install a complete and operational system in accordance with drawings and
these specifications. Provide all materials whether specified or not for a complete and
operational system that complies with all required codes and standards. All materials and
equipment shall be installed in accordance with the manufacturer's instructions and all
applicable codes and standards. Equipment shall be installed complete including power,
controls, supports, etc.
2. The contractor shall be responsible for visiting the site prior to bid and becoming familiar
with all existing conditions that may affect his work. The contractor shall include in his bid
any required labor and materials necessary to modify, remove or relocate existing work to
allow for the new work to be installed. If the contactor believes the new work cannot be
installed as shown in the drawings, he shall inform the project construction manager
immediately. There shall be no additional compensation for failure to include coordination
with existing conditions in the scope and cost. Site visits shall require an escort provided
by the US Treasury and shall be scheduled a minimum of 48 hours in advance.
3. All work shall be done in accordance with applicable building, mechanical, plumbing,
electrical and energy codes and standards. These include, but are not limited to the 2021
International Building Code (IBC), International Mechanical Code (IMC), International
Plumbing Code (IPC), International Fuel Gas Code (IFGC), National Fire Protection
Association (NFPA), American Society of Refrigeration and Air Conditioning Engineers
(ASHRAE), Sheet Metal and Air Conditioning Contractors National Association (SMACNA),
National Electrical Code. If any existing code violations are found, the contractor shall
notify the project manager immediately. Construction shall also comply with all
requirements of ICD/ICS 705 Standards.
4. The contractor shall maintain a competent superintendent on site at all times who will
oversee all work and ensure the construction is done in a safe, clean and professional
manner. He shall ensure the work is done in accordance with the project specifications, all
layout is correct and accurate and the quality of the workmanship meets or exceed
industry standards. He shall also verify all manufacturer instructions are being followed for
installation and setup.
5. The contractor shall submit equipment shop drawings for all major equipment and
materials including, but not limited to, fans, ductwork, air devices, etc. Shop drawings shall
indicate materials, dimensions, weights, performance data and warranty information.
6. The contractor shall maintain a set of as-built documents on site at all times. The drawings
shall maintain red-line markup of all deviations from the deign documents and include
pertinent information such as critical dimensions and elevations.
7. All new equipment and materials shall be reviewed by the contractor before ordering to
ensure the equipment will fit in the given space, is suitable for the location, arrangement
of duct, piping, etc, and can be serviced once installed. All required service access space
shall be maintained and room shall be provided to remove filters. Verify equipment
electrical characteristics meet the existing available power.
8. Ductwork shall be constructed of galvanized sheet metal fabricated and installed in
accordance with the latest SMACNA standards. Ductwork shall be constructed to 2” wc
working pressure and shall have a minimum thickness of 26 gage. Duct transitions and
turns shall utilize fittings. Install flexible duct connectors at each connection to equipment
with moving parts (ie fan coil units and exhaust fans, etc). All supply and return ductwork
shall be insulated with 1.5” thick foil faced fiberglass duct-wrap with integral vapor barrier.
Flexible branch ducts shall be permitted provided they are UL sited for such duty, are
pre-insulated and carry a helical spring to retain its shape. Flexible branch ducts shall not
exceed 6 ft in length and shall not turn more than 270 degrees.
9. All new or modified air syste…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
Matsushima JASDF Base Storage Shelter
DEPT OF DEFENSE · Sources Sought · due August 7, 2026
Repair Concrete Base-wide, 126 ARW, Scott AFB
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 14, 2026
Z1DA--| SOL| NRM| 646-21-101 UD SPS AHU & RO Upgrade Construction (VA-26-00036217)
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 27, 2026
NAF Outdoor Recreation/Equipment Rental Center, Kadena Air Base, Okinawa, Japan
DEPT OF DEFENSE · Solicitation · due July 24, 2026
Z--Expansion of the PIFSC Glider Lab, JBPHH
COMMERCE, DEPARTMENT OF · Solicitation · due August 7, 2026