Skip to content

Open for responses

Door Repair IDPO; Defense Supply Center Richmond(DSCR)

DEPT OF DEFENSE

Notice type
Presolicitation
Solicitation #
SP470327Q0004
NAICS
238990
PSC
Z1PZ
Set-aside
Small Business Set Aside - Total
Posted
November 16, 2026
Response due
December 3, 2026
Place of performance
Richmond, VA

What this opportunity is

The Department of Defense is seeking door repair services at the Defense Supply Center Richmond, with the contract being an Indefinite Delivery Purchase Order (IDPO) set aside for small businesses. A presolicitation notice has been issued, and a site visit is scheduled for December 3, 2026, requiring interested parties to register through the Defense Biometric Identification System (DBIDS) at least five business days prior to the visit. This opportunity suits small businesses capable of providing repair services and emphasizes the importance of timely registration for access to the secure facility.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Defense Logistics Agency DLA Installation Management Richmond DM-FRIE DSCR IDPO Repair/Replace Doors P.2027.00047 STATEMENT OF WORK (SOW) -- 1 of 49 -- Page 2 of 49 1. SCOPE This scope outlines all services and items that the contractor shall provide upon notification from the government representative. The contractor is obligated to have trained personnel available to respond to Defense Supply Center Richmond two business days after being notified there is a door/frame that needs repair/ replacement to survey the work effort. 2. BACKGROUND Defense Supply Center Richmond facility maintenance branch does not have qualified/trained personnel and or equipment for the tasks outlined in this scope of work. 3. OBJECTIVES The objective of this project is to obtain an Indefinite Delivery Purchase Order (IDPO) to provide timely services, repairs, material, parts, labor, etc. to perform various door/frame repairs and/or replacement around the installation ensuring all doors worked on are inspected and fully functional as defined below. 4. SPECIFIC REQUIREMENTS The contractor is responsible for all materials, tools, labor, equipment etc. to repair/replace a door/frame or door parts when called upon. Any door/frame or parts that are replaced shall match the size, type, gauge, style, color etc. as existing unless otherwise directed. Any of the doors could have optical safety sensors, pressure sensors, panic hardware, glass, electronic strikes, IDS/access control devices such as balanced magnetic switches/door contacts, electronic door strikes/locks, or magnetic locks, handicapped operators and many other components typically found in a commercial setting that need repair or replacement. When the contractor makes any door/frame repair or replacement the door must be fully functional when work is completed. A door will be considered fully functional if ALL of the conditions below are met: - If there is both a fully functioning optical sensor and bottom sensing edge stops on each roll up door. Each sensor will be tested 2 times. Each test must pass 100% of the time. - If the door fully opens and closes when using the motor operator (if equipped). The door will be tested 2 times using the motor operator. Each test must pass 100% of the time. If the door also has chain hoists those will also be tested 2 times. Each test must pass 100% of the time. - If the door (without motor operator) fully opens and closes when using the chain hoist. The door will be tested 2 times using the chain hoist. Each test must pass 100% of the time. - If when fully opened manually or by motor operator, the door remains open for 5 minutes without closing on its own. The doors will be tested 1 time and must pass. -- 2 of 49 -- Page 3 of 49 - All personnel doors must meet ADA/ABA maximum door opening force of 5 pounds. The contractor shall demonstrate the door meets this requirement at the final inspection. - Any door with a handicapped operator must be fully functional. All handicapped operators and push plates will be tested two times. They must pass both tests 100% of the time. - Personnel doors must latch correctly without using any pressure to pull or push the door closed. - Any door with an electronic strike, balanced magnetic Switch or intrusion detection (IDS) sensors must be fully functional. - Any door with card reader access must be fully functional. - All doorknobs, handles, closures and all other hardware must be fully functional. - All roll up door colors shall match existing and be provided by the manufacturer already coated. - The contractor shall secure any openings to prevent unauthorized entry at the end of each day if needed. Typically, ¾” plywood is used to cover the entire opening. Repair any holes created by using fasteners. - All conduit and wiring can be reused. - The contractor shall disconnect card readers, alarms etc. and reinstall. - The contractor shall remove and replace any signage on doors. - The contractor shall replace all labeling on doors to match existing. - Replace all door hardwood to match existing. - Provide new door closures. - The contractor can use the restrooms at Parker Pond which is centrally located on DSCR. The contractor shall make a site visit before 9:00AM two business days after being notified there is a door/frame that needs repair/ replacement to survey the work effort. One business day and by 5pm after the site visit, the contractor shall provide the government POC a proposal that includes the material, labor and equipment needed to make repairs or replacement. The report shall include a price breakdown for each area. The contractor shall make repairs as soon as possible as parts become available. Any repair or replacement shall be made within one week of receiving materials. Parts shall be ordered within -- 3 of 49 -- Page 4 of 49 two business days after award. Provide the government POC the order number(s) for all parts on order. Provide an estimated delivery date for all parts to the government POC. Once the contractor confirms the door has been repaired/replaced and is fully functional a final inspection shall be scheduled with the government representative. The contractor shall provide 3 days’ notice to schedule this inspection. All contractor invoices shall include actual costs of materials, labor and equipment. Under this contract the contractor shall be able to perform the following tasks and have availability of qualified personnel/material/parts for the following: The contractor shall provide repairs and/or replacement to any door/frame, or any door component located on DSCR. The contractor shall properly dispose of any doors or door parts off DSCR. The contractor shall ensure any doors replaced have the same markings as the original door. E.g., The door number, if a door has yellow safety paint near the bottom, if there are signs of any kind posted anywhere on any door, frame etc. The contractor shall provide the following deliverables…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 238990