What this opportunity is
The Department of Defense is soliciting a Total Small Business Set-Aside contract for drayage services under NAICS 484210, with a place of performance in Hawaii. The contract requires disassembling, storing, and reassembling government office furniture at Fort Shafter, and the successful bidder will need to track the solicitation. The Performance Work Statement outlines specific requirements, including transportation, inventory management, and compliance with local, state, and federal regulations.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Performance Work Statement (PWS)
Government Property Furniture Handling:
Disassembly, Storage at Shafter Flats B1535 (150
Takata Road) and Reassembly for Building 200,
(471 Funstone Road) United States Army
Garrison, Island of Oahu, Hawaii
05/01/2026
-- 1 of 21 --
Performance Work Statement (PWS)
This Performance Work Statement (PWS) defines the requirements for disassembling
office furniture in Building 200, 471 Funston Road, Fort Shafter, transporting it to a
Government-owned warehouse at 150 Takata Road, Building 1535,Shafter Flats, and
returning it to Building 200, 471 Funstone Road for reassembly upon a minimum
two-week notice from the Government. This work supports United States Army Garrison
Hawaii on the Island of Oahu.
Vision Statement
Provide services to support the mission and operations of United States Army Garrison
Hawaii, ensuring a seamless transition, maintaining operational efficiency, fostering a
reliable Hawaii military community, and enhancing Warfighter readiness and well-being.
1 Scope
The scope of this Performance Work Statement (PWS) encompasses all labor,
equipment, materials, and transportation necessary to safely disassemble, relocate,
store, return, and reassemble government office furniture. The contractor shall
disassemble designated office furniture (as listed in TE#1 and TE#2 Layout of Cubicles)
located in Building 200 at Fort Shafter, transport all items to a designated warehouse
facility Building 1535 at Shafter Flats for temporary storage, and subsequently return the
furniture to Building 200 for full reassembly.
All work shall be performed in a manner that ensures the protection, accountability, and
serviceability of government property. The contractor is responsible for coordinating
access, maintaining an organized inventory of all furniture components, and ensuring
that all items are reassembled to their original configuration or as otherwise directed by
the Government. The Contractor shall comply with all applicable local, state, and federal
regulations, including safety standards, to fulfill this requirement.
2 General Requirements
This section describes the general requirements for this effort. The following sub-
sections provide details of various considerations on this effort.
2.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method
by which the contractor performs the required tasks. Under no circumstances shall the
Government assign tasks to or prepare work schedules for individual contractor
employees. It shall be the responsibility of the contractor to manage its employees and
to guard against any actions that are of the nature of personal services or give the
perception of personal services. If the contractor believes that any actions constitute, or
are perceived to constitute personal services, it shall be the contractor's responsibility to
notify the Contracting Officer (KO) immediately.
2.2 Business Relations
The Contractor will successfully integrate and coordinate all activities needed to execute
the requirement. The Contractor shall manage the timeline, completeness, and quality
-- 2 of 21 --
of problem identification. The Contractor shall seek to ensure customer satisfaction and
maintain the professional and ethical behavior of all contractor personnel.
2.3 Contract Administration and Management
The Contractor must maintain communication between the support operations at the
Directorate of Public Works (DPW) Service Contract Branch, DPW Point of Contact and
the Post Office Point of Contact. The Contractor shall respond to the Government's
request for this contractual action promptly.
2.4 Subcontract Management
The Prime Contractors shall notify the Contracting Officer Representative (COR) if the
Prime Contractor add any subcontractors necessary to integrate this work. The Prime
Contractor shall be responsible for any Subcontract management and work performed
on this requirement and shall be responsible and accountable for Subcontractor
performance on this requirement. The prime Contractor will manage work distribution to
ensure there are no Organizational Conflict of Interest (OCI) considerations. Cross
teaming may or may not be permitted.
2.5 Contractor Personnel, Disciplines, and Specialties
The Contractor will accomplish the assigned work by employing and utilizing qualified
personnel with appropriate combinations of education, training, and experience. The
Contractor will provide the necessary resources and infrastructure to manage, perform,
and administer the contract.
2.6 Location and Hours of Work
The work for this requirement is located at Fort Shafter, Building 200 and warehouse
Shafter Flats, Island of Oahu, Hawaii. This contract shall be performed during
Government’s normal working hours, 7:30 a.m. – 4:00 p.m., Monday through Friday,
excluding Federal Holidays. In no event shall the Contractor perform work outside the
normal working hours without obtaining written approval from the Contracting Officer
(KO).
2.7 Federal holidays
The Contractor’s performance shall not be required on the Federal public holidays listed
below. Holidays occurring on weekends will be observed as directed by the Federal
calendar (5 U.S.C. 6103).
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
Juneteenth National Independence Day
-- 3 of 21 --
3.0 Performance Requirements
The Contractor shall provide all labor, materials, equipment, and supervision required to
relocate office furniture and related items from FS Building 200, 471 Funstone Road, to
FSF Building 1535, 150 Takata Road, Oahu, Hawaii, and upon completion of
renovations return all relocated items from FSF Building 1535 back to FS Building 200.
The work shall include the safe transport of all items identified in Technical Exhibit (TE)
1, the disassembly and reassembly of cubicles in accordance with layout provided…
Source: SAM.gov, as posted. Verify the current solicitation before responding.