What this opportunity is
The Defense Logistics Agency is soliciting a Total Small Business Set-Aside contract for the five-year inspection, testing, and maintenance (ITM) of facility fire suppression systems at the Defense Supply Center of Richmond, excluding buildings 31 and 47. This project requires the contractor to perform various tasks, including inspections, hydrostatic testing, and replacements, in accordance with UFC 3-601-02 and applicable federal, state, and local codes. The contract is suitable for small businesses with experience in construction services, specifically in the NAICS code 238210. Bidders should track the solicitation, as it is a formal solicitation notice.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Defense Logistics Agency
DLA Installation Management Richmond
DM-FRIE
Installation Fire Suppression Systems- UFC 3-601-02 Five-Year
ITM Compliance Project
P.2026.00330
STATEMENT OF WORK (SOW)
-- 1 of 49 --
Page 2 of 49
1. OBJECTIVE
The objective of this project is to perform the required five-year inspection, testing, and
maintenance (ITM) of all facility fire suppression systems at the Defense Supply Center of
Richmond, excluding building 31 & 47. This inspection shall be in accordance with UFC 3-601-02
and applicable federal, state, and local codes to ensure systems remain fully operational, code
compliant, and capable of protecting personnel, property, and mission readiness.
2. BACKGROUND
Defense Supply Center Richmond (DSCR) facilities are equipped with fire suppression systems
designed to protect personnel, government property, and mission-critical operation from fire
hazard. Multiple fire suppression systems throughout DSCR facilities have reached the required
five-year service interval and must be evaluated to ensure continued operational readiness and code
compliance. Failure to conduct these mandated inspections and maintenance actions may result in
system degradation, increased life safety risks, potential mission disruption, and regulatory non-
compliance. This project supports the sustainment of DSCR life safety infrastructure by ensuring all
fire suppression systems remain reliable, fully functional, and compliant with governing standards.
3. SPECIFIC REQUIREMENTS
o The contractor shall:
3.1 SYSTEMS INSPECTION
o Perform all five-year required ITM tasks.
o The Contractor shall verify actual quantities and field conditions as necessary to perform
the required services.
o Internal inspection of sprinkler piping and branch lines.
o Obstruction investigation.
o The contractor shall replace all gauges on all fire suppression systems.
o Hydrostatic testing of FDC piping to a minimum of 150 PSI for two hours.
o Standpipe hydrostatic test.
o Inspect and test all backflow preventers associated with fire suppression systems.
o Perform an internal check on check valves on all backflow preventors.
o Ensure all backflows that are in confined spaces are inspected and tested.
o Ensure check valves and relief valves operate properly.
o Fire pump internal inspection.
o An internal Fire Department Connection (FDC) piping inspection.
o Ensure proper inspection tags and stickers are installed noting when the five year and other
functions are performed.
o Perform a three-year air test on all dry systems.
o Clean and inspect all check valves and strainers on air lines for dry systems.
o Clean and inspect all check valves and strainers on alarm lines to include the water motor
gongs on wet systems.
o Provide detailed pictures with building numbers and location of the inside of the piping and
tags hung where internal inspections were performed.
o Perform inspection and maintenance on all nitrogen generators.
-- 2 of 49 --
Page 3 of 49
o Perform inspection and maintenance on all dry chemical and clean agent fire suppression
systems.
o The Contractor shall furnish all permits, safety equipment, atmospheric monitoring, and
rescue/ retrieval equipment necessary to conduct compliant confined space entries and
perform all required inspection, testing, and maintenance.
3.2 COORDINATION AND SCHEDULING
o Coordinate all work with DSCR Project Manager.
o Submit a detailed work schedule prior to commencement.
o Follow approved impairment procedures for any system shutdown.
o Provide temporary fire watch when required.
o Minimize disruption to DSCR operations and mission activities.
3.3 DOCUMENTATION
o Record and submit the following documentation:
o Pre-work and inspection plan and schedule.
o NFPA 2001 Reports.
o Deficiency reports with corrective action recommendations.
o Update inspection tags.
o Final comprehensive certification report verifying completion of five-year ITM tasks and
system operational status.
3.4 SYSTEM RESTORATION
o Ensure all systems are fully restored to normal operational status upon completion of testing.
o Verify alarms and supervisory signals are functional.
o Notify DSCR representatives upon system restoration and completion of work.
LOCATION OF WORK
The work described in this Statement of Work shall be performed at the facilities located at 6090
Strathmore Road Richmond Virginia 23237, included is the building number and approximate
count on fire suppression systems. This count is an approximation, and it is up to the contractor to
verify all fire suppression systems located at the Defense Supply Center of Richmond.
o B210 – (1) wet and (1) dry system.
o B430 – (2) wet systems.
o B66 – (5) wet and (4) dry systems.
o B65 – (8) wet and (8) dry systems.
o B98 – (2) wet systems.
o B60 – (9) wet systems.
o B59 – (4) wet and (4) dry systems.
o B80 – (4) wet systems.
-- 3 of 49 --
Page 4 of 49
o B91,92,93,94 (1) wet system.
o B56 – (2) wet systems and (2) electric driven fire pumps, 12x8 MAA FP-C090807-02.
o B54 – (8) wet systems.
o B15 – (2) wet and (22) dry systems.
o B14 – (22) dry systems.
o B13 – (19) wet, (2) dry systems and a nitrogen generator, South Tek FPS-00500.
o B12 – (10) wet and (3) dry systems and a nitrogen generator, South Tek FPS-00500.
o B9 – (10) wet and (3) dry systems and a nitrogen generator, South Tek FPS-00900.
o B8 – (11) wet systems.
o B44 – (2) wet systems.
o B201 – (1) wet system.
o B3 – (2) dry systems and a dry chemical suppression system for a paint booth.
o B4 – (1) wet and (15) dry systems and a nitrogen generator, South Tek FPS-16500.
o B24 – (1) wet system.
o B100 – (2) wet systems and a dry chemical suppression hood system.
o B46 – (13) wet systems, (3) dry chemical hood systems, and a clean agent fire suppression
system, Monarch PCI-35.
o B32 – (2) wet systems, (11) dry systems and two nitrogen generators, South Tek FPS-
00500.
o B456 – (1) wet system.
o B42 – (1) wet, (1) dry sy…