Skip to content

Closed — responses were due November 16, 2026

This solicitation is no longer accepting responses. It is kept here as a record. Related open opportunities are listed below.

Environmental Control System

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Notice type
Combined Synopsis/Solicitation
Solicitation #
80KSC026Q0013
NAICS
333413
PSC
4310
Set-aside
No Set aside used
Posted
November 13, 2026
Response due
November 16, 2026
Place of performance
Orlando, FL

What this opportunity is

NASA is seeking quotations for a fully fabricated compressed-air system to provide clean, dry air at Kennedy Space Center, FL, as outlined in solicitation number 80KSC026Q0013. This opportunity is open to all responsible sources, with no set-aside for small businesses, making it suitable for both large and small firms. Interested vendors should note that the evaluation will be based on the "Lowest Price Technically Acceptable" criteria, and offers are due by 10 am EST on November 16, 2026.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Environmental control System, SM COMPRESSED AIR INJECTION LC-39B Statement of Work ITAR Category IV(i) - International Traffic in Arms Regulations (ITAR) Notice - This document contains information which falls under the purview of the U.S. Munitions List (USML) as defined in the International Traffic in Arms Regulations (ITAR), 22 CFR 120-130, and is export controlled.It shall not be transferred to foreign nationals in the U.S. or abroad without specific approval of a knowledgeable NASA export control official, and/or unless an export license or license exemption is obtained/available from the United States Department of State. Violations of these regulations are punishable by fine, imprisonment, or both. COMET Export Control Office at KSC September 16, 2026 ENGINEERING DIRECTORATE Environmental control System, SM COMPRESSED AIR INJECTION LC-39B procurement specification REVISIONS REVLTR DESCRIPTION DATE Basic Issue. 09/16/2026 A Revised section 3.2.1 to clarify flow measurement location. Revised section 3.2.4 from “ISO 8573-1:2021 [3:3:0]” to “ISO 8573-1:2021 [3:3:1]”. 10/20/2026 Contents 1. Scope 7 2. Applicable documents 7 3. Requirements 7 3.1 GENERAL 7 3.2 PROCESS FLUID 8 3.2.1 Flow Rate 8 3.2.2 Pressure 8 3.2.3 Temperature 8 3.2.4 Purity Classification 8 3.3 HARDWARE 9 3.3.1 Redundancy 9 3.3.2 Worst Case Usage 9 3.3.3 Remote Control 9 3.3.4 Carbon Monoxide Monitoring 9 3.3.5 Enclosure 10 3.3.6 Air Receivers 13 3.4 ENVIRONMENTAL 14 3.4.1 Ambient Air Temperature 14 3.4.2 Wind Loading 14 3.4.3 Launch Induced 14 3.5 DESIGN AND CONSTRUCTION 15 3.5.1 Compressed-Air Systems 15 3.5.2 Stationary Pressure Vessels 15 3.5.3 Pressure Relief Devices 15 3.5.4 Electrical Systems 15 3.6 TRANSPORTATION 15 3.6.1 Shipping 15 3.7 ON-SITE ACTIVATION 16 4. Documentation 16 5. Interfaces Required from the Government 16 6. Training 17 7. Warranty 17 Figures Figure 3‑1 Simplified Process Schematic 8 tables abbreviations, acronyms, and symbols Units of measure and some terms commonly understood within the subject disciplines have been abbreviated in the body of this document without callout but are included among the following. abbreviation definition Scope This specification defines the process fluid, hardware, environmental, transportation, design and construction requirements for procurement of turn‑key, weather‑rated air compressor enclosure systems to supply clean Compressed Air to the Environmental Control System at LC-39B, Kennedy Space Center. Applicable documents The following documents form a part of this document to the extent specified herein. ASCE‑7 Minimum Design Loads and Associated Criteria for Buildings and Other Structures ASME B31.1 Power Piping ASME B31.3 Process Piping ASME BPVC‑VIII Rules for the Construction of Pressure Vessels CGA S‑1.3 Pressure Relief Device Standards, Part 3 – Stationary Storage Containers for Compressed Gases ISO 8573-1 Compressed air — Part 1: Contaminants and purity classes KSC‑STD‑Z‑0005 Pneumatic Ground Systems Development Standard NASA‑STD‑5008 Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities and Ground Support Equipment NFPA 70 National Electrical Code (NEC) NFPA 70E Standard for Electrical Safety in the Workplace NFPA 496 Standard for Purged and Pressurized Enclosures for Electrical Equipment NPR 2810.1 Security of Information and Information Systems NPR 7150.2 NASA Software Engineering Requirement 79K07491 Installation Purge Hardware Requirements GENERAL The vendor shall deliver and activate a fully fabricated, ready-to-connect compressed-air system to generate clean, dry air for use at LC-39B, Kennedy Space Center, FL. This equipment shall survive a launch induced environment but is not expected to operate during the launch. If not explicitly stated below, the vendor’s standard offerings to provide a complete operational system for this location are considered acceptable. Desired delivery date of completed system is February 28, 2027, however extended periods of performance will be considered. Vendor shall make every effort to deliver as early as possible. Figure 3-1 shows a simplified process schematic. The green boxes represent the scope of this specification. Figure ‑ Simplified Process Schematic PROCESS FLUID Flow Rate The operating hardware shall provide a continuous supply of no less than 55 lbm/min of compressed air at the exit of the enclosure at ambient temperatures in 3.4.1. Pressure The operating hardware shall provide a minimum pressure of 70 psig at maximum flow at the exit of the air compressors. Temperature The operating hardware shall provide compressed air no warmer than 15°F above ambient air temperature at the exit of the enclosure. Purity Classification The operating hardware shall deliver compressed air meeting ISO 8573-1:2010 [3:3:1]. HARDWARE Redundancy The vendor shall supply N+1 redundant hardware for all critical process equipment. N is defined as the minimum hardware needed to deliver the process air requirements defined in 3.2, e.g. if two compressors are needed to provide the flow rate, then three compressors satisfy N+1. Critical Hardware is defined as any active hardware which would prevent delivery of the process air per the requirements defined in 3.2. At minimum, the Government considers the air compressors, desiccant dryers, filter stacks, control systems, and power transformers critical equipment…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Get alerts when NATIONAL AERONAUTICS AND SPACE ADMINISTRATION posts the next one

Mindy watches SAM.gov every day and emails you new notices that match what you sell — like NAICS 333413. Daily alerts come with Mindy Pro, which starts with a 14-day free trial.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 333413