Skip to content

Open for responses

Ergonomic Workstations JTF WHEM

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W91QEX27QA001
NAICS
337214
PSC
7110
Set-aside
Small Business Set Aside - Total
Posted
October 23, 2026
Response due
November 23, 2026
Place of performance
Doral, FL

What this opportunity is

The Department of Defense is seeking a contractor to provide ergonomic workspace furniture modernization for the Joint Task Force–Western Hemisphere, including design, procurement, installation, and training services. This opportunity is set aside for small businesses, making it suitable for companies specializing in modular and durable furniture solutions. Interested vendors should note that this is a solicitation notice, indicating they should track the opportunity closely and prepare to submit bids in response to the requirements outlined.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 STATEMENT OF WORK Joint Task Force–Western Hemisphere Workspace Furniture Modernization Headquarters, U.S. Southern Command (HQ USSOUTHCOM) Joint Task Force–Western Hemisphere (JTF-WHEM) 14 October 2026 PART 1 GENERAL 1. Description of Requirement/ Introduction. The Contractor shall provide all personnel, supervision, design services, furniture, materials, equipment, transportation, delivery, staging, assembly, installation, testing, training, warranty support, cleanup, documentation, storage, tools, supplies, facilities, and other non-personal services necessary to provide a complete ergonomic workspace furniture modernization solution for Room 1- JPG, Room 2- POD, and Room 3- JOC, except for those items specifically identified as Government-furnished property (GFP) or Government-furnished services (GFS). 1.1.1 The contractor shall provide modular, durable, ergonomic, commercially manufactured furniture suitable for continuous or extended-duration mission operations. All furniture shall be new unless specifically identified by the Government as Government-furnished property for reuse, relocation, or integration. Unless expressly included by contract line item, the contractor shall not furnish, configure, program, integrate, test, accredit, or maintain audiovisual (AV), information technology (IT), video teleconferencing (VTC), network, secure KVM, display-processing, audio, or control- system equipment. 1.1.2 The contractor shall coordinate with the Government and Government-designated AV/IT integrator to ensure that workstation locations, furniture layout, monitor mounts, cable-management systems, access panels, equipment clearances, and power/data assumptions support the approved AV/IT architecture. 1.1.3 The contractor shall plan and perform all work in Government-approved phases to preserve safety, emergency egress, facility access, mission continuity, information protection, and operational requirements. 1.2 Background. Joint Task Force–Western Hemisphere requires modernization of designated workspace areas to provide durable, ergonomic, operationally suitable furniture configurations that support continuous or extended-duration mission operations. The requirement includes furniture design, space planning, procurement, storage, delivery, removal of Government-authorized existing furniture, disposition support, assembly, installation, testing, documentation, training, warranty support, protection of Government property, and coordination with Government-managed Directorate of Public Works (DPW) power work and Government-designated AV/IT integration activities. 1.3 Objectives. The objective of this requirement is to provide complete, safe, durable, ergonomic, mission-suitable workspace furniture solutions for Room 1 (JPG), Room 2 (POD), and Room 3 (JOC). The contractor shall: 1. Prior to delivering any new furniture, the contractor shall systematically dismantle, load, and transport all current room furniture off-site. 2. Coordinate design, delivery, staging, installation, and storage activities with the Government. 3. Deliver furniture configurations that meet approved functional, ergonomic, operational, safety, and layout requirements. 4. Minimize disruption to Government operations. 5. Protect Government property, facilities, access routes, staging areas, and workspaces. 6. Coordinate furniture interfaces with Government-managed DPW power work and Government-designated AV/IT integration. -- 1 of 36 -- 2 7. Complete required testing, training, documentation, warranty support, punch-list correction, and final acceptance actions. 1.4 Scope. The contractor shall provide all non-personal services, labor, materials, equipment, transportation, storage, supervision, and incidental items necessary to design, deliver, remove existing furniture, install, inspect, test, train, document, and provide warranty support for ergonomic workspace furniture in Rooms (JPG), Room 2 (POD), and Room 3 (JOC). The furniture scope includes approved workstations, task seating, conference tables, monitor-mount systems, cable-management systems, storage components, supporting furniture, and associated accessories. The contractor shall coordinate furniture interfaces with Government-managed power work and the Government designated AV/IT integrator. AV/IT, network, electrical, structural, VTC, and system integration work are excluded unless specifically identified in a contract line item. 1.4.1 The contractor shall furnish and install approved workstations, chairs, monitor-mount systems, cable-management systems, storage components, supporting furniture, and related accessories for Room 1 (JPG), Room 2 (POD), and Room 3 (JOC). 1.4.2 The contractor shall coordinate furniture placement, monitor arms, cable-management systems, access panels, equipment clearances, and power/data assumptions with the Government and Government-designated AV/IT integrator. 1.4.3 The contractor shall not perform electrical, network, structural, AV/IT, VTC, or other work outside the furniture installation scope. 1.5 Phased Room Turnover Schedule. Each of the three rooms will be completed in three phases. The first phase for each room shall consist of all break-down and dispositions of current furniture. The second and third phase for each room shall consist of delivery, installation, calibration, and post-installation cleanup. The contractor shall correct deficiencies that prevent safe use, mission use, security compliance, or completion of Government furnished power AV/IT work within two (2) business days of notification, unless otherwise approved in writing by the KO. All other punch-list items shall be corrected with five (5) business days of notification. The desired schedule is set forth in Table 1. Completion of each room milestone requires joint inspection and written concurrence by the Government Representative (GR). Table 1: Master Milestone Schedule Phase Location Pre-Requisite Dependency Required Completion Window Performa…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 337214