Skip to content

Open for responses

Facility 30011 - Facility Signage Update

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA860127Q0018
NAICS
339950
PSC
9905
Set-aside
Small Business Set Aside - Total
Posted
November 2, 2026
Response due
November 25, 2026
Place of performance
Wright Patterson AFB, OH

What this opportunity is

The Department of Defense is seeking quotes for the Facility 30011 - Facility Signage Update, a project set aside for small businesses under NAICS code 339950. This solicitation is a request for quotes (RFQ) and requires bidders to demonstrate technical acceptability while offering the lowest price. Interested small businesses should prepare to submit a pricing schedule and comply with the Statement of Work, as the government intends to award a firm-fixed-price purchase order based on the lowest-price technically acceptable basis.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

01-SOW Statement of Work -Furniture/Signage Package Wright Patterson AFB, OH DAF version 28JULY2026 Signage Statement of Work Date: 10/5/2026 Facility# 30011 (F/30011) Area A 5151 Wright Ave Wright-Patterson Air Force Base, OH 45433 F30011 Building Signage 2026TP036 ID Project #: 2026TP-036 Tina Penick Interior Design Specialist Wright Patterson AFB CEG-Interior Design Specialist 5151 Wright Ave, Building 11 WPAFB, OH 45433-5339 937-656-3452 -- 1 of 16 -- 01-SOW Statement of Work -Furniture/Signage Package Wright Patterson AFB, OH DAF version 28JULY2026 Revision History Author Name Date Reason For Changes Version -- 2 of 16 -- 01-SOW Statement of Work -Furniture/Signage Package Wright Patterson AFB, OH DAF version 28JULY2026 1.0 Scope This Signage Package is for FACILITY# 30011, WPAFB, Ohio, Signage to be remove existing signage, patch/painted if necessary to match existing walls, ordered, delivered and installed per UFC and NFPA101 Code. This project will be awarded on a competitive basis using total project cost. ALL PROJECTS:  The Contractor shall provide ALL supervision, labor, materials, equipment, including transportation to accomplish this project in accordance with this Statement of Work (SOW), project drawings.  The Contractor shall provide 30 days storage, and the requirements contained in the soliciting documents.  The Contractor shall include an itemized quote that includes labor to receive, inspect, deliver to project job site, and install product per approved final design layout.  The Contractor shall provide 3D Renderings of each typical.  The Contractor may include AutoCAD design hours for all phases of design (initial, revisions and final). o No CAD files will be provided unless the vendor is NIST SP800-171 Certified Level 1 (until 9-NOV-2026 or after Level 2). Once awarded and after completion of construction if applicable, contractor is responsible for field verifying space.  The Contractor may include design hours for in person meetings to review all phases of design (initial, revisions and final), finish selections, site visits (field measurement), and any other means and methods for the contractor to execute the project.  For this project repair/replace flooring and ceiling, where applicable if damaged upon installation of project. All patch and repair should be consistent finish level of the existing wall with no paint lines visible from patch.  The Contractor shall provide products from a single manufacturer to achieve uniformity in finish and appearance within office/space. Reference basis of design per product for suggestion or if equal manufacturer is proposed, follow the same on following products of same basis of design finish.  The Contractor shall provide final installation autocad dwg file and invoice emailed to CE Interior Designer before CE will do any acceptance in WAWF. FOR THIS PROJECT:  The Contractor shall provide removal of existing signage as stated in detail in Section 7.2 Removal of Existing Signage. Site Visit Scheduled: Will be scheduled, if requested, within 1 week of solicitation posting. For this project we require the following product types: Product Types in Project Minimum Technical Requirements PRODUCT –Basis of Design- Basis of Design: 2/90 Signage (Slide) -- 3 of 16 -- 01-SOW Statement of Work -Furniture/Signage Package Wright Patterson AFB, OH DAF version 28JULY2026 CLIN# TAG/TYPICAL DESCRIPTION QTY 01 01.B 01.B - ROOM ID, PAPER INSERT, 9"wx9"h, 3"x9" insert changeable tile with tactile/braille 1-1/2" text, top left justified; 6"x9" clear acrylic window for 4"x8.5" paper insert 3/4" printed text (3 lines of text option), center justified 44 02 01.B2 01.B2 - ROOM ID, PAPER INSERT, 9"wx9"h, 3"x9" insert changeable tile with tactile/braille 1-1/2" text, top left justified; 3"x9" clear acrylic window for 3"x8.5" paper insert 3/4" printed text (3 lines of text option), 3"x9" whiteboard, center justified 17 03 01.D 01.D - CONFERENCE ROOM, 9"wx9"h, 3"x9" insert changeable tile with tactile/braille with direct print 1-1/2" text, top left justified; 4"x9" insert changeable tile with direct print 3/4" text (3 lines of text), left center justified; 1"x9" insert changeable tile slider with 1/5" text, center justified; 1"x9" insert changeable tile slider with 1/5" text, center justified 6 04 01.E 01.E - RESTROOM, 9"wx11"h, 8"x9" insert changeable tile with 6" pictogram image, center justified; 3"x9" insert changeable with tactile/braille with direct print 1" text, center justified 8 05 01.F 01.F - STAIRCASE ID, 9"wx13"h, 3"x9" insert changeable tile tactile/braille with 1-1/2" font, center justified; 8"x9" tinsert 10 BASIS OF DESIGN - 2/90 SIGN SYSTEM (SLIDE) or Equal ; COMPONENTS, flat panel rail modular system, base plate (structural rail) that holds side-loading tiles, removable copy tiles (copy inserts), and side slim (end) caps in accent color. All signs to include integral tactile characters raised .8mm with Grade 2 Braille photopolymer. Font to comply with UFC 3-120-01, Helvetica Neue 55 Roman. All interior signage must comply with color contrast as specified in ABAAS (GSA's standard for Architectural Barriers Act). Finish is to be painted acrylic with beveled edge tiles. Aluminum accent with clear acrylic lens window for paper insert. Provide sign templates per sign type specified in SOW. Typical installation mounting method for all wall signs are screw mounting of frameless baseplate, unless otherwise noted. Follow ICC/ANSI A117.1 (International Code Council/American National Standards Institute) and ADA (American Disablity Act) Chapter 7 for typical mounting heights. Installation to include removal of existing signage, patch, prep, and paint any damage from removal. All standard product lines to have a Minimum of 2 year Warranty and any custom signage to have a minimum of 1 year warranty for workmanship and material. -- 4 of 16 -- 01-SOW Statement of Work -Furniture/Signage Package Wrig…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 339950