Skip to content

Open for responses

FCI MCKEAN CAMP ADMIN AIR HANDLING UNIT & INSTALLATION

JUSTICE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
15B20927Q00000002
NAICS
333415
PSC
4120
Set-aside
Small Business Set Aside - Total
Posted
November 17, 2026
Response due
November 30, 2026
Place of performance
PA

Description

U.S. Department of Justice Federal Bureau of Prisons Facilities Management Washington, DC 20534 August 26, 2026 MEMORANDUM FOR THOMAS REYNOLDS FACILITIES MANAGER, FCI MCKEAN FROM: Kimberly Hudson, Chief Construction and Environmental Review Section SUBJECT: Statement of Work Review for Project #26Z2BF5 Air Handling Unit Supply & Installation The Construction and Environmental Review Section, Facilities Management, has reviewed and approved the Statement of Work (SOW) to be used for solicitation services at FCI McKean for Project #26Z2BF5, Air Handling Unit Supply & Installation. Please see revisions made to the SOW below. 1. Under “9. Startup Services”, below statement is added. • Contractor shall provide training to BOP staff for operation, maintenance and trouble shooting of the new equipment. 2. Under “10. Warranty”, below statement is added. • All materials and labor provided shall have warranty of five (5) years from date of substantial completion. If you have any additional questions or concerns, please contact Henry Guo, Architect, at sguo@bop.gov. Copy: Regional Facility Manager - NER -- 1 of 5 -- Page 1 of 4 SUPPLY & INSTALL SPECIFICATIONS Air Handling Unit Supply and Installation Federal Correction Institute McKean I. SPECIFICATIONS A. Scope Of Work The Federal Bureau of Prisons (FBOP), Federal Correction Institute - McKean (FCI McKean) intends to award to a responsible entity for the provision of the procurement and delivery of one (1) air handling unit at FCI McKean’s Federal Prison Camp, located at 6975 Route 59, Lewis Run PA. B. Operation Specifications The Contractor shall provide a supply, delivery, and installation solution including all equipment, materials, labor, supervision, tools, and incidentals required to deliver one (1) fully functional air handline unit meeting the requirements of the specifications. C. FCI McKean Responsibilities FCI McKean shall provide a point of contact to liaise between the Contractor and personnel on site to coordinate the delivery of the air handling unit. D. Equipment Salient Characteristics All equipment specified in this statement must be brand name or an equal product. Should your firm choose to submit an equal product, you must submit all technical specifications of the equal product to be analyzed, and a technical determination issued with acceptance/non-acceptance. The government retains the right to determine technical acceptance for all submitted equal products. FCI McKean requires one (1) commercial air handling unit, brand name or equal to York XTI -39x66 Air Handling Unit. 1. Installation Environment • Unit is currently in a confined mechanical room with limited space to work as well as a drywall ceiling below. • All ductwork, heating lines, pumps, power wiring, and associated controls will be provided and installed by the contractor per manufacturer recommendation • Contractor should provide access to system and ductwork for maintenance purposes 2. Unit Construction • Panel Construction shall be, double wall with contained insulation, designed to prevent exterior sweating. Panels shall be sealed tight to provide vapor barrier protection for insulation. Housing assembly shall be designed so that there are no thermal short circuits that would result in condensation on outside metal surfaces. • Module joints shall be gasketed to provide seal against sound, air, and thermal leakage • Drain pans shall be insulated stainless steel • Provide marine grade light fixture with protective cover capable to avoid intrusion of water and vapor in each accessible compartment having access door, using externally mounted switch with wiring running in -- 2 of 5 -- Page 2 of 4 conduit external to the air handling unit. • Units shall be factory assembled, complete with all components indicated and all necessary accessories to result in a complete and operable air handling unit. All electrical components are to be prewired, and with a single terminal box to accept three phase power source. • Provide a double grounded convenience receptacle outlet on outside of housing. • Filters: Manufacturers’ standard frame with 30% efficient pre-filters and 85% efficient filter with minimum rating of MERV 13. • Provide anti-stratification unit to mix outdoor air and return air in quantities required, and result in a single point minimum coil face temperature of 40ºF • Air handling unit heating coil shall be sized to maintain 50 F in the space during smoke purge mode using 100% outdoor air for the General Housing Units and Special Housing Unit. • NEMA ICS 2, IGBT, PWM, VFC; listed and labeled as a complete unit and arranged to provide variable speed of an NEMA MG 1, Design B, 3-phase induction motor by adjusting output voltage and frequency. • Air handling units (AHU) for General Housing and Special Housing shall be three deck multi-zone. • Three deck multi-zone air handling units shall be equipped with separate damper actuators for hot and cold deck in each zone to permit dehumidification when supply air is above 60% RH. 3. Connections • All ductwork in accessible mechanical chases shall be of metal construction. Flexible ductwork shall not be permitted in these areas. All exposed ductwork shall be round double walled, pre-insulated type. Flexible ductwork shall not exceed 5' in length. • Where installing ducting adjacent to air handling units, allow space for service and maintenance. • All conductors smaller than 1/0 shall be copper. Conductors No. 1/0 and larger than can be either copper or aluminum. Aluminum conductors No. 1/0 AWG and larger shall be compact stranded AA-8000 series electrical grade aluminum alloy conductor material. All conductors, regardless of size, feeding low voltage circuits (600 volts or less), HVAC equipment, motors and pumps shall be copper. • Conductors for branch circuits shall be sized to prevent a voltage drop exceeding 3 percent at the farthest outlet of power, heating, and lighting loads, or combination …

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 333415