Skip to content

Open for responses

Forest Service - Solar Batteries Frenchman Work Center

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
127EAW27Q0002
NAICS
238210
PSC
N061
Set-aside
Small Business Set Aside - Total
Posted
November 17, 2026
Response due
November 28, 2026
Place of performance
CA

Description

1 US Department of Agriculture (USDA) Statement of Work Solar Batteries Frenchman Work Center Plumas National Forest Revised Via Amendment A00002 -- 1 of 5 -- 2 Contents Project ..................................................................................................................................................................................... 3 General Information ............................................................................................................................................................... 3 1.0 Scope of Work ............................................................................................................................................................... 3 2.0 Background .................................................................................................................................................................... 3 3.0 Location ......................................................................................................................................................................... 3 4.0 Estimated Start Date / Period of Performance ............................................................................................................. 3 5.0 Drawings and Specifications .......................................................................................................................................... 3 6.0 Restrictions on Work ..................................................................................................................................................... 3 7.0 Camping and Housing .................................................................................................................................................... 3 8.0 Required Submittals ...................................................................................................................................................... 3 Contractor Requirements ....................................................................................................................................................... 4 9.0 Technical Requirements / Tasks .................................................................................................................................... 4 10.0 Government Furnished ............................................................................................................................................... 5 11.0 Deliverables / Schedule ............................................................................................................................................... 5 12.0 Travel ........................................................................................................................................................................... 5 13.0 Contractor’s Key Personnel ......................................................................................................................................... 5 14.0 Security Requirements ................................................................................................................................................ 5 15.0 Data Rights .................................................................................................................................................................. 5 -- 2 of 5 -- 3 Project Solar Batteries Frenchman Work Center General Information 1.0 Scope of Work The goal of this project is to replace the existing batteries in the Frenchman Work Center Solar System and recycle the old batteries. 2.0 Background The Frenchman Work Center is a remote work center located in Plumas County. It consists of an Engine Bay building with offices and a barracks with a capacity to sleep 10. It supports a total of 6-15 fire personnel at any given time. Because it is a remote work center, it has no access to grid-tied electricity. Therefore, the work center solely functions off of a solar system with a back-up generator. The solar system has (14) lithium-ion batteries that have failed and no longer function thus the entire system cannot operate. The generator is a stand-by generator meant for short spans of use, not continuous duty. Therefore, immediate replacement of the batteries is needed. 3.0 Location • 605 Frenchman Blvd, Chilcoot, CA 96105 • Lat/Long: 39.889927, -120.195959 • Elevation: ~5,650ft • Note: This location does receive snow during the winter. Due to the instability of weather, coordination with COR required for delivery and installation to ensure site is properly accessible. 4.0 Estimated Start Date / Period of Performance The period of performance is 30 calendar days following issuance of the Notice to Proceed. Start is expected immediately after contract award. 5.0 Drawings and Specifications Reference Solicitation Attachments • PNF Frenchman WC Solar Photos 6.0 Restrictions on Work • Work hours are limited to non-holiday weekdays, Monday – Friday, 0600 – 1900, unless requested in writing and approved in advance by the COR at no additional cost to the Government. • Contractor is responsible for the security of their tools and equipment at all times • All trash and loose materials shall be secured by the contractor daily • All construction debris remains the property of the Contractor and shall be properly disposed of off National Forest Land 7.0 Camping and Housing Camping within the construction limits may be permitted only with COR and District Ranger approval. Please provide request for camping in project bid proposal. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit. 8.0 Required Submittals The following submittals are required: • Single-line wiring diagram of batteries to existing equipment • Battery product data • Battery Operation & Maintenance Manual and Warranty Documents • Schedule -- 3 of 5 -- 4 Contractor Requirements 9.0 Technical Requirements…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 238210