What this opportunity is

The Department of Homeland Security is soliciting proposals for the renovation of the galley at USCG Station Lake Tahoe, with a total small business set-aside under NAICS 238220 for Plumbing, Heating, and Air-Conditioning Contractors. The project is estimated to cost between $25,000 and $100,000, requiring contractors to begin work within 15 days and complete it within 60 days of the notice to proceed. Interested small businesses should note that this is a solicitation notice, indicating the need to track the opportunity rather than submit a bid immediately.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

This solicitation is being issued by the US Coast Guard Regional Support Team – Southwest (RST-SW) as a request for proposal. The solicitation number is 30670PR260000032. The Project title is Renovate Galley at Station Lake Tahoe. This is a total (100%) small business set aside. The NAICS for this action is 238220 Plumbing, Heating, and Air-Conditioning Contractors. The size standard is $19 million. Payment Protection is required no later than 15 calendar days after award. As required by FAR 36.204, the estimated magnitude of this project is between $25,000 and $100,000. The contractor shall begin performance within 15 calendar days and complete it within 60 calendar days after receiving a notice to proceed award. The performance period is mandatory. Offers submitted must be valid for a minimum of 30 calendar days. Offerors interested in a site visit prior to solicitation closing must notify the contracting officer and contract specialist immediately to facilitate access to the worksite. Attendance at a site visit is not mandatory and will not influence the outcome of this procurement. Offerors must be registered at SAM.gov at the time of offer submittal. TABLE OF CONTENTS: 1. Listing of Incorporated Purchase Requisitions 2. Section B – Supplies or Services and Prices/Costs 3. Section C – Descriptions/Specifications/Work Statement 4. Section D – Packaging and Marking 5. Section E – Inspection and Acceptance Terms 6. Section F – Delivery or Performance 7. Section G – Contract Administration Data 8. Section H – Special Contract Requirements 9. Section I – Contract Clauses 10. Section J – List of Documents, Exhibits, and Other Attachments 11. Section K – Representations, Certifications, and Other Statements of Offerors 12. Section L – Instructions, Conditions, and Notices to Offerors 13. Section M – Evaluation Factors for Award -- 1 of 32 -- 1. Listing of Incorporated Purchase Requisitions Incorporated Purchase Requisition Numbers: 30670PR260000032 2. Section B – Supplies or Services and Prices/Costs Item Number Base Item Number Supplies/Services Quantity Unit 0001 Renovate Galley at Station Lake Tahoe 1 Job Contract Type: Firm Fixed Price Unit Price Extended Price Description: The contractor shall perform the required specified tasks and all implied tasks required by the Statement of Work. Purchase Requisitions 30670PR260000032 IDC Type: Not Applicable FSC Codes: Z1AZ, Maintenance of Other Administrative Facilities and Service Buildings NAICS Code: 238220 Plumbing, Heating, and Air-Conditioning Contractors -- 2 of 32 -- 3. Section C – Description/Specifications/Work Statement Statement of Work (SOW) for Station Lake Tahoe Galley Renovation 1.0 GENERAL 1.1 Background The current galley facility requires modernization to enhance functionality and replace aging components. The existing layout, cabinetry, countertops, and specific appliances are outdated and do not meet the current operational needs of the crew. 1.2 Scope The contractor shall provide all personnel, equipment, and materials to perform the galley renovations as specified herein. The scope of work is categorized by the following actions: 1.2.1 To Remain in Place:  The existing refrigerator unit shall be protected and integrated into the new layout. 1.2.2 To Be Removed and Replaced:  The existing cabinetry, countertops, and sink/faucet assembly.  The existing combination griddle/burner unit.  The existing commercial freezer unit. 1.2.3 To Be Furnished and Installed:  New commercial-grade base, tall, and wall cabinetry.  New durable stainless-steel countertops.  New commercial-grade sink and faucet assembly.  New combination griddle/burner unit.  New commercial-grade freezer unit. 1.3 Objective To deliver a fully functional, safe, and modernized galley that meets all applicable commercial food service and facility standards. This includes the installation of new cabinetry, durable stainless-steel countertops, a new commercial sink/faucet assembly, a new combination griddle/burner unit, and a new commercial-grade freezer unit, while successfully protecting and integrating the preserved refrigerator unit. 2.0 SPECIFIC REQUIREMENTS/TASKS 2.1 Site Dimensions & Itemized List of Work The contractor shall address the galley space, with an approximate total area of 210 sq. ft. The contractor must verify all dimensions on-site prior to ordering materials. -- 3 of 32 -- Space / Element Dimensions / Area Notes Total Galley Space 210 sq. ft. Verify all dimensions on-site Area 1 ~7 ft. W × 4.5 ft. H Existing Cabinet/Counter Area Area 2 ~3 ft. W × 2.5 ft. H Existing Cabinet/Counter Area Area 3 ~13.75 ft. W × 2.08 ft. H Existing Cabinet/Counter Area Execution Items: Work shall be executed according to the following itemized list: Item Scope of Work / Description Item 1: Demolition & Removal Safely disconnect plumbing, gas, and electrical from fixtures designated for removal. Demolish and remove all existing cabinetry, countertops, the old sink, the old griddle, and the existing freezer unit. CRITICAL SAFETY NOTE: White paint on drywall in the southeast corner of the galley has been confirmed to contain lead (72.0 mg/kg). All demolition, sanding, scraping, or disturbance of this painted drywall must comply with the OSHA Lead in Construction Standard (29 CFR 1926.62), including exposure assessments and appropriate worker protections. REFRIGERANT RECLAMATION NOTE: The contractor must legally reclaim and document the removal of all refrigerants from the existing freezer unit prior to disposal, in compliance with EPA Section 608 regulations. Item 2: Cabinetry Installation Furnish and install new commercial-grade base, tall, and wall cabinets as per the approved layout. Item 3: Countertop & Sink Furnish and install new, durable stainless-steel countertops. Install a new commercial-grade sink and faucet assembly, including all necessary plumbing connections. Item 4: Appliance Installation Furnish and install a new,

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238220)