What this opportunity is
The Department of Agriculture is seeking small businesses to submit quotes for the Powell Duplex Improvements project located in the Nez Perce – Clearwater National Forest. This project involves the removal and replacement of roofs, water-damaged structural insulated panels, and some structural members of an existing duplex. As a total small business set-aside under NAICS code 236118, this opportunity is suitable for small construction firms, and interested vendors should note that this is a combined synopsis/solicitation, meaning they must track the solicitation closely for updates rather than waiting for a separate written solicitation.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PROJECT MANUAL FOR:
GAOA POWELL DUPLEX
IMPROVEMENTS
Volume 1of 1
Date: July 19, 2024
100% CD Specifications
ARCHITECT
MOSAIC ARCHITECTURE, P.C.
317 North Cruse Ave, Suite 201
Helena, Montana 59601
www.mosaicarch.com
-- 1 of 159 --
-- 2 of 159 --
28621 / USFS Powell Duplex
Improvements 00 0110 - 1 Table of Contents
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
SPECIFICATIONS
2.01 DIVISION 01 -- GENERAL REQUIREMENTS
A. 01 3000 - Administrative Requirements
B. 01 5000 - Temporary Facilities and Controls
C. 01 7000 - Execution and Closeout Requirements
D. 01 7419 - Construction Waste Management and Disposal
2.02 DIVISION 02 -- EXISTING CONDITIONS
A. 02 4100 - Demolition
B. 02 4113 Selective Site Demolition
2.03 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 1000 - Rough Carpentry
B. 06 1219 - Structural Insulated Panels
C. 06 2000 - Finish Carpentry
2.04 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 2100 - Thermal Insulation
B. 07 2500 - Weather Barriers
C. 07 4113 - Metal Roof Panels
D. 07 4623 - Wood Siding
E. 07 6200 - Sheet Metal Flashing and Trim
F. 07 9200 - Joint Sealants
2.05 DIVISION 08 -- OPENINGS
A. 08 1118 - Residential Steel Doors
B. 08 7100 - Door Hardware
2.06 DIVISION 09 -- FINISHES
A. 09 2116 - Gypsum Board Assemblies
B. 09 6516.23 - Resilient Flooring
C. 09 6816 - Sheet Carpeting
D. 09 9000 - Painting and Coating
2.07 DIVISION 10 -- SPECIALTIES
A. 10 3100 - Manufactured Fireplaces
2.08 DIVISION 22 -- PLUMBING
A. 22 0000 - General Requirements of Plumbing and HVAC
B. 22 0500 - General Provision of Plumbing and HVAC
C. 22 4100 - Plumbing Fixtures
2.09 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
A. 23 8231 Heaters
2.10 DIVISION 26 -- ELECTRICAL
A. 26 0010 - General Electrical Requirements
-- 3 of 159 --
28621 / USFS Powell Duplex
Improvements 00 0110 - 2 Table of Contents
B. 26 0505 - Selective Demolition for Electrical
C. 26 0519 - Low-Voltage Electrical Power Conductors and Cables
D. 26 0533 - Raceways and Boxes for Electrical Systems
E. 26 2726 - Wiring Devices
F. 26 5110 LED Lighting
-- 4 of 159 --
28621 / USFS Powell Duplex
Improvements 01 3000 - 1 Administrative Requirements
PART 1 GENERAL
1.01 SECTION INCLUDES
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
A. Electronic document submittals.
B. Preconstruction meeting.
C. Progress meetings.
D. Construction progress schedule.
E. Submittals for review, information, and project closeout.
F. Requests for Interpretation (RFI) procedures.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 ELECTRONIC DOCUMENT SUBMITTAL
A. All documents transmitted for purposes of administration of the contract are to be in electronic
(PDF) format.
1. Besides submittals for review, information, and closeout, this procedure applies to
requests for information (RFI's) progress documentation, contract modification documents
(e.g. supplementary instructions, change proposals, change orders), applications for
payment, field reports and meeting minutes, and any other document any participant
wishes to make part of the project record.
3.02 PRECONSTRUCTION MEETING
A. USFS Contracting Officer will schedule a meeting after Notice of Award.
B. Attendance Required:
1. USFS Contracting Officer
2. General Contractor.
3. All major sub-contractors.
C. Agenda:
1. Execution of USFS Contracting Officer-General Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of subcontractors, list of products, schedule of values, and progress
schedule.
5. Designation of personnel representing the parties to Contract and <1|A/E|>.
6. Procedures and processing of field decisions, submittals, substitutions, applications for
payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
D. Contractor will record minutes and distribute copies within seven days after meeting to
participates, with one copy to Owner, participants, and those affected by decisions made.
3.03 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly
intervals.
B. Attendance Required:
1. General Contractor.
2. USFS Contracting Officer.
3. General Contractor's superintendent.
4. Major subcontractors.
C. Agenda:
1. Review minutes of previous meetings.
-- 5 of 159 --
28621 / USFS Powell Duplex
Improvements 01 3000 - 2 Administrative Requirements
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Maintenance of progress schedule.
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
9. Maintenance of quality and work standards.
10. Effect of proposed changes on progress schedule and coordination.
11. Other business relating to work.
D. Record minutes and distribute copies within two days after meeting to participants, with two
copies to USFS Contracting Officer, participants, and those affected by decisions made.
3.04 CONSTRUCTION PROGRESS SCHEDULE - SEE SECTION 01 3216
A. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
B. Within 20 days after review of preliminary schedule, submit draft of proposed complete
schedule for review.
C. Within 10 days after joint review, submit complete schedule.
3.05 REQUESTS FOR INTERPRETATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract
Documents arising from inability to determine from them the exact material, process, or
system to be installed; or when the elements of construction are required to occupy the
same space (interference); or when an item of work is described differently at more than
one place in C…