Greenhouse Repairs, CRL, Ft. Collins, Colorado
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1232SA26Q1004
NAICS
238990
PSC
Z2JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 27, 2026
Response due
July 31, 2026
Place of performance
Fort Collins, CO
Description
1
US Department of Agriculture (USDA)
Statement of Work
1167371-966-USDA/ARS/CARR/CRL
Greenhouse Repairs
1701 Centre Ave
Fort Collins, CO 80526
-- 1 of 4 --
2
Contents
1. 1.0 Scope of Work ....................................................................................................................................... 3
2. 2.0 Background ........................................................................................................................................... 3
3. 3.0 Contractor Requirements ........................................................................................................................ 3
4. 4.0 Technical Requirements / Tasks............................................................................................................... 3
5. 5.0 Government-Furnished Items .................................................................................................................. 3
6. 6.0 Period of Performance ............................................................................................................................ 3
7. 7.0 Quality Assurance / Quality Control (QA/QC) ............................................................................................. 3
8. 8.0 Safety Requirements .............................................................................................................................. 3
-- 2 of 4 --
3
1. 1.0 Scope of Work
The Contractor shall provide all labor, materials, tools, equipment, and supervision necessary to complete greenhouse
repairs across CRL Greenhouses A1, A2, A3, B1, B2, B3, B4, C1, C2, D1, D2, D3, D4, D5, D6, Corridor AB, and CD.
Work includes correction of mechanical, structural, ventilation, and shading deficiencies identified during the site visit.
Repairs include but are not limited to:
• Repair of damaged sash hardware
• Replacement of bent gear bars
• Realignment and lubrication of sashes
• Replacement of worn sash gaskets
• Cleaning and replacement of screens
• Lubrication and replacement of roof vent gears
• Replacement of bow bars
• Repair of shade guide wires and shade drive cables
• Repair or replacement of damaged roof panels
2. 2.0 Background
The CRL Greenhouses support ongoing USDA-ARS research requiring precise environmental and structural integrity. Due
to age, weather exposure, and continuous operational demand, several greenhouse systems have degraded. Repairs are
required to maintain safe, functional, and research-ready greenhouse environments.
3. 3.0 Contractor Requirements
All Contractors must attend the mandatory on-site pre-bid visit to verify scope, document additional deficiencies, and
confirm material and equipment requirements.
Contractors must:
• Produce a comprehensive punch list of completed repairs for Contracting Officer Representative (COR) approval.
• Coordinate work schedules with the COR to prevent disruption of active research.
• Follow all USDA facility access and safety requirements.
4. 4.0 Technical Requirements / Tasks
Contractor shall perform all repairs according to manufacturer specifications and USDA-ARS facility standards.
All repaired systems must undergo post-installation testing to verify proper function.
5. 5.0 Government-Furnished Items
None.
6. 6.0 Period of Performance
The total period of performance is 180 days from Notice to Proceed. Schedule adjustments require CO approval.
7. 7.0 Quality Assurance / Quality Control (QA/QC)
The Contractor shall implement a Quality Assurance / Quality Control (QA/QC) program to ensure all work meets
USDA-ARS standards and manufacturer specifications.
QA/QC requirements include:
• Inspecting all materials prior to installation to verify they meet required specifications.
• Verifying all greenhouse components are installed, aligned, and functioning properly.
• Ensuring all fasteners, seals, and moving parts are properly tightened, lubricated, and secured.
• Performing operational testing on repaired components including vents, shades, sashes, and mechanical linkages.
• Documenting deficiencies and corrective actions taken.
• Submitting a QA/QC completion report along with the final punch list for COR review and approval.
8. 8.0 Safety Requirements
-- 3 of 4 --
4
The Contractor is responsible for maintaining a safe work environment and complying with all OSHA, federal, state, and
USDA-ARS safety regulations.
Required safety practices:
• Use of appropriate Personal Protective Equipment (PPE) including gloves, eye protection, fall protection, and respiratory
protection when applicable.
• Lockout/Tagout procedures when working on powered systems.
• Ladder and lift safety compliance.
• Daily safety briefings for all on-site employees.
• Immediate reporting of all incidents, near-misses, or hazardous conditions to the COR.
• Maintaining controlled access to work zones to avoid interference with USDA personnel or research operations.
-- 4 of 4 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238990)
H312--FY27 SERVICE - Hood Fire Protection System Inspections - Bath VAMC (B+4)
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 29, 2026
5th Armored Brigade (5th AR BDE) Turf Replacement Fort Bliss, Texas.
DEPT OF DEFENSE · Solicitation · due August 21, 2026
Playground Installation, Edward MacDowell Lake, Peterborough, NH
DEPT OF DEFENSE · Solicitation · due August 4, 2026
Sector Field Office Fort Macon Fence Extension
HOMELAND SECURITY, DEPARTMENT OF · Solicitation · due August 14, 2026
Furnish and Install Storm Shelters on Capehart Housing, Vance AFB, OK
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due September 2, 2026