Greenhouse Ridge Vent Replacements
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1232SA26Q0946
NAICS
238150
PSC
Z2JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 14, 2026
Response due
August 17, 2026
Place of performance
Albany, CA
What this opportunity is
The Department of Agriculture is buying ridge vent replacements for greenhouses. This total small business set-aside opportunity suits small businesses classified under NAICS 238150. As a combined synopsis/solicitation, businesses should track the notice for bid details rather than submitting a bid immediately.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
United States Department of Agriculture
Agricultural Research Service
STATEMENT OF WORK
Title
USDA-WRRC Greenhouse Ridge Vents
USDA-ARS
Western Regional Research Center
800 Buchanan Street.
Albany, CA 94710
May 19, 2026
-- 1 of 12 --
STATEMENT OF WORK
1.0 CONTRACT PROJECT:
a. Project Number: TBD
b. Project Title: USDA WRRC Greenhouse Ridge Vent Replacement
c. Project Location:
USDA-ARS
Western Regional Research Service
800 Buchanan Street
Albany, CA 94710
2.0 PROJECT CONTACT PERSONS:
a. CONTRACTING OFFICER (CO):
TBD
b. RESEARCH PROGRAM REPRESENTATIVES (RPR):
Ron Haff
USDA-WRRC
Western Regional Research Service
800 Buchanan Street
Albany, CA 94710
Phone: (510)-559-5868
Email: ron.haff@usda.gov
c. ADMINISTRATIVE OFFICER (AO acting):
Chris Carter
USDA-ARS
Western Regional Research Service
800 Buchanan Street
Albany, CA 94710
Phone: (510)-559-6300
Email: Christopher.carter3@usda.gov
-- 2 of 12 --
d. LOCATION MONITOR:
Ron Haff
USDA-ARS
Western Regional Research Service
800 Buchanan Street
Albany, CA 94710
Phone: (510) 559-5868
Email: ron.haff@usda.gov
e. AREA SAFETY AND HEALTH MANAGER (ASHM)
Ken Cushman
USDA-ARS
Email: ken.cushman@usda.gov
f. REAL PROPERTY MANAGEMENT:
N/A
g. ENGINEERING PROJECT MANAGER (EPM)
Ron Haff
USDA-ARS
Western Regional Research Service
800 Buchanan Street
Albany, CA 94710
Phone: (510) 559-5868
Email: ron.haff@usda.gov
3.0 SCOPE OF SERVICES:
The Contractor shall provide all professional services necessary for the
accomplishment of the contract project and such required services shall be in
accordance with requirements as described herein.
a. The Contractor shall provide services for the following tasks marked by an
“X”:
[X] Provide a cost proposal to complete the project as per project
requirements.
[X] Provide and install all material to complete the project as per project
requirements.
-- 3 of 12 --
4.0 PROJECT REQUIREMENTS:
The contractor shall provide all management, supervision, labor, equipment, and
tools to replace roof and wall ridge vents in eight PGEC greenhouse rooms.
-- 4 of 12 --
-- 5 of 12 --
a. The Contractor will work with Location Monitor and other site personnel to
ensure minimum downtime as heating the and cooling of the building will
likely be affected.
b. The Contractor’s work shall adhere to the criteria stated within these
project requirements. All construction shall comply with applicable
federal, state, and local code requirements as well as current industry
standards, (ie: EPA, ASTM, GSA, AASHTO, etc.) and health and safety
codes, in effect at the time of contract award.
c. All work must meet all pertinent Unified Facilities Guide Specifications
(UFGS) and ARS 242.1M standards. UFGS available at
http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs.
-- 6 of 12 --
ARS 242.1M available at https://www.afm.ars.usda.gov/ppweb/pps-and-
manuals/.
d. This project falls under the DAVIS BACON Wage Act.
e. The Contractor is responsible for visiting the site prior to submitting a bid
to observe existing conditions. No compensation will be provided for
conditions that would be visible during an on-site visit for people
experienced in performing this type of work.
4.1 Background & Site Description:
The project site is the main building of the Western Regional Research Service
located at 800 Buchanan Street, Albany, CA, 94710. The contractor is responsible
for determining the scope of the inspections and tests to meet the code
requirements in 4.0 above.
4.2 Bid Schedule:
A quotation for the following items: Repair or replace as necessary for full
functionality ridge vents in eight PGEC greenhouse rooms.
4.3 Description of Work:
Provide all management, supervision, labor, equipment, and tools to replace rack and
pinion ridge vents (both roof and wall) in PGEC Greenhouse 1, rooms 1 to 6, and in PGEC
Greenhouse 2, rooms 1 and 2. All roof vent systems are dual (with vents opening on each
side of the top ridge).
The chart below details the number and length of units in each room. Pictures are
attached. Site visits are strongly encouraged and welcome to understand the full scope
of the required work.
• The contractor shall remove and dispose of existing systems.
• The contractor shall be responsible for the disconnection and reconnection of
electrical wiring for the demolished & newly installed system.
• There are existing mercury switches on many of the motors. The contractor shall
gather these mercury switches and provide them to the USDA, the USDA will be
responsible for the disposal of these mercury switches. The contractor is
responsible for the disposal of everything else.
• The contractor should use new steel rack and pinions (or an alternative similar
functioning system).
• The contractor shall replace all drive shafts.
• The contractor shall replace all screens, screen frames and brushes. Replacement
screen and frame shall be stainless steel or equivalent (more durable than the
existing nylon, aluminum, and steel screens).
-- 7 of 12 --
• Contractor shall provide schedule for work completion. Greenhouse availability
must be carefully coordinated with USDA personnel to minimize disruption to
ongoing research.
-- 8 of 12 --
4.4 Government Furnished Equipment\Services
a. none
5.0 GENERAL REQUIREMENTS:
5.1 Permits: Where governing regulations and imposed codes and standards require notices,
permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed
with the required work, the Contractor shall obtain items and take those actions in accordance
with the regulations of the governing authority. The costs of such permits, licenses, inspections,
etc., are the obligation of the Contractor.
5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to
accommodate the new installation. Contractor shall coordinate modification of existing
installations with Owner. All disturbances of existing systems shall be thoroughly coord…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238150)
Glazier Services BPA - Nationwide
HOMELAND SECURITY, DEPARTMENT OF · Solicitation · due August 19, 2026
Y1AA--656-12-223, Replace Windows Bldg 3 & Corridors
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 26, 2026
Remove & Replace Bullet Proof Glass Bldg. 906
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 29, 2026
656-12-222 Replace Windows Bldg 4, 8 & 9
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 17, 2026
The Federal Aviation Administration (FAA) intends to establish a Qualified Vendors List (QVL) for Cab Glass repair and/or replacement in various US locations.
TRANSPORTATION, DEPARTMENT OF · Solicitation · due July 29, 2026
J056--REPLACING BROKEN GLASS PANELS OF WINDOW
VETERANS AFFAIRS, DEPARTMENT OF · Sources Sought · due July 15, 2026