Y1AA--656-12-223, Replace Windows Bldg 3 & Corridors

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
36C26326B0034
NAICS
238150
PSC
Y1AA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
July 22, 2026
Response due
August 26, 2026
Place of performance
Saint Cloud, MN

What this opportunity is

The Department of Veterans Affairs is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) to replace windows in Building 3 and corridors at the VA Medical Center in Saint Cloud, Minnesota. The project involves various aspects of construction, including demolition, asbestos abatement, and painting, as outlined in the project manual. This is a design-build project, as indicated by the project schedule, and the government will award a 100% Construction Contract. Bidders should track the solicitation, as it is not a pre-solicited opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

PROJECT MANUAL VA Medical Center REPLACE WINDOWS BUILDING 3 & CORRIDORS Saint Cloud, Minnesota Project Number 656-12-223 SCIP Project Number: JLG 11050I Date: July 14, 2017 100% CD’s: For Construction -- 1 of 273 -- -- 2 of 273 -- 12-11 00 01 10-1 DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS Replace Windows, Building 3 & Corridors 656-12-223 SCIP TABLE OF CONTENTS Section 00 01 10 DIVISION 00 – SPECIAL SECTION 00 01 15 List of Drawings DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 General Requirements 11-25 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-10 01 33 23 Shop Drawings, Product Data, and Samples 11-08 01 42 19 Reference Standards 09-11 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-10 DIVISION 02 – EXISTING CONDITIONS 02 41 00 Demolition 06-10 02 82 11 Traditional Asbestos Abatement 07-11 02 83 33.13 Lead-Based Paint Removal and Disposal 08-11 attachment Hazardous Materials Report, Bldg 3: dated 03.30.2012 attachment Hazardous Materials Report, Corridors: dated 04.17.2012 attachment Hazardous Materials Report, Corridors Revised: dated 04.20.2012 DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 92 00 Joint Sealants 12-11 DIVISION 08 - OPENINGS 08 51 13 Aluminum Windows 03-10 08 80 00 Glazing 12-10 DIVISION 09 – FINISHES 09 10 00 Cutting and Patching 09 23 00 Gypsum Plastering 10-11 09 51 00 Acoustical Ceilings 12-13 09 91 00 Painting 04-09 -- 3 of 273 -- -- 4 of 273 -- 00 01 15-1 DEPARTMENT OF VETERANS AFFAIRS LIST OF DRAWING SHEETS Section 00 01 15 The drawings listed below accompanying this specification form a part of the contract. General: GI1 Cover Sheet Architectural: AS1 AS2 AS3 AS4 AS5 AS6 AS7 AS8 AS9 Photo Elevations Building 3 Photo Elevations Corridors Window Types Building 3 Window Types Corridors Scheduling Coordination Building 3 Scheduling Coordination Corridors Window Details Window Details Installation Sequence - - - END - - - -- 5 of 273 -- -- 6 of 273 -- 11/06/25 i SECTION 01 00 00 GENERAL REQUIREMENTS TABLE OF CONTENTS 1.1 SAFETY REQUIREMENTS........................................ 1 1.2 GENERAL INTENTION ...................................................................................................... 1 1.3 STATEMENT OF BID ITEM(S) ..................................................................................... 4 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR .......................................... 5 1.5 CONSTRUCTION SECURITY REQUIREMENTS ............................................................. 5 1.6 OPERATIONS AND STORAGE AREAS ............................................................................ 9 1.7 ALTERATIONS................................................................................................................... 18 1.8 DISPOSAL AND RETENTION ........................................................................................ 20 1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS ............................................................................. 21 1.10 RESTORATION ................................................................................................................ 23 1.11 PHYSICAL DATA ........................................................................................................... 24 1.12 PROFESSIONAL SURVEYING SERVICES ................................................................ 24 1.13 LAYOUT OF WORK ......................................................................................................... 24 1.14 AS-BUILT DRAWINGS .................................................................................................. 24 1.15 USE OF ROADWAYS....................................................................................................... 24 1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT .............. 25 1.17 TEMPORARY USE OF EXISTING ELEVATORS....................................................... 26 1.21 AVAILABILITY AND USE OF UTILITY SERVICES........................................... 27 1.23 TESTS............................................................................................................................... 40 1.24 INSTRUCTIONS .............................................................................................................. 42 1.33 REBATE DOCUMENTATION........................................................................................... 53 1.34 SITE INSPECTIONS .................................................................................................. 58 1.35 Project/Phase Occupancy ....................................................................................... 1.36 Contracting Officer Representative Coordination........................ -- 7 of 273 -- 11/06/25 ii -- 8 of 273 -- 11/06/25 01 00 00 -1 SECTION 01 00 00 GENERAL REQUIREMENTS 1.1 SAFETY REQUIREMENTS Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements. Throughout the campus there is existing hazardous material (lead paint, asbestos, etc); not all areas are shown on the drawings. Contractor shall maintain awareness, have safety plans, PPE and comply with OSHA, EPA and other related regulations when working near assemblies. In addition to the requirements of the safety section, the contractor shall submit Safety Data Sheets per OSHA, for all products, chemicals, etc to be used on site within 15 calendar days of contract award. Any changes to the material, products, chemicals planned for use during the project shall be submitted and approved 15 calendar days prior to bringing the material onsite. 1.2 GENERAL INTENTION The successful contractor shall furnish all labor, materials, tools and equipment required to repair, remove, replace and completely install all of the new windows in Building 3 and corridors. The contractor shall remove the existing internal and external wind

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238150)