Skip to content

Open for responses

Hoods & Ducts - Buckley SFB

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
HoodsDucts12NOV26
NAICS
561790
PSC
S216
Set-aside
Small Business Set Aside - Total
Posted
November 12, 2026
Response due
November 20, 2026
Place of performance
Aurora, CO

What this opportunity is

The Department of Defense is seeking a contractor to provide commercial hood and duct cleaning services at Buckley Space Force Base in Colorado, under NAICS 561790. This opportunity is set aside for small businesses and involves ensuring the safe operation of grease-laden vapor exhaust systems to prevent fire hazards, with a contract duration of one base year and four option years. As this is a Sources Sought notice, interested businesses should track the opportunity for potential bidding rather than submitting proposals at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 PERFORMANCE WORK STATEMENT (PWS) FOR CLEANING OF GREASE LADEN VAPOR EXHAUST SYSTEMS (HOOD AND DUCTS) BUCKLEY SPACE FORCE BASE, COLORADO 19 March 2026 DRAFT -- 1 of 19 -- 2 TABLE OF CONTENTS PARA DESCRIPTION PAGE 1. Description of Service 3 1.1. Basic Services 3 2 Service Summary 6 3 Government Furnished Property and Services 9 3.1.3 Contractor Furnished Items and Services 9 Table Method of Government Surveillance 7 4.2 Hours of Operation 9 4.4 Performance During Crisis 10 Appendix A Workload Data 15 Appendix B Facility /TypeCleaning/Frequency 16 DRAFT -- 2 of 19 -- 3 PERFORMACE WORK STATEMENT FOR CLEANING OF GREASE LADEN VAPOR EXHAUST SYSTEMS 1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment and labor necessary to ensure that commercial hood and duct cleaning services are performed at Buckley Space Force Base, Colorado, in a manner that will ensure continuous and safe operation of such systems and prevent any potential grease fire from spreading past the cook-line into the hood and ductwork. All cleaning shall be in accordance with the most current version of the National Fire Protection Association (NFPA) 96, (Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations), Air Force Instruction (AFI) 91-203, para 44.3.6.5, and all other local, state, and federal rules and procedures. This will be an agreement tentatively for a base year plus four option years. This does not obligate the Government to exercise additional options. The scope of this contract is limited to cleaning and inspection. The contractor shall report any deficiencies requiring repair (e.g., worn bearings, system leaks, motor failures) to the COR, but is not authorized to perform repairs under this PWS. 1.1. BASIC SERVICES. 1.1.1. CLEANING SCHEDULE. All systems shall be cleaned and serviced according to the schedule in Appendix A. The contractor shall be responsible for coordinating and completing all work identified within the month specified. 1.1.2. SCHEDULING WORK . The contractor shall notify the Contracting Officer Representative within 5 business days at (720) 847-6283, unless electrical outages are necessary, in which case 10 work days prior notice shall be provided by the contractor. If scheduled cleanings are missed for any reason, the contractor shall notify the COR of the new scheduled cleaning date and time. Contractor shall coordinate with the COR to obtain access to roof of building for cleaning of exhaust fans. A roof hatch key is required for access to most roofs. This key is available from the COR. CLEANING FREQUENCIES AND SCHEDULING. The contractor shall follow the cleaning frequency schedules below unless otherwise preapproved in writing from the COR. The contractor shall coordinate with the using activity, (i.e., facility managers), for an acceptable date/time to clean all kitchen exhaust systems identified in Appendix A. This coordination will minimize disruption to service provided by that facility. The contractor shall provide a minimum of twenty-four (24) hours’ notice to the COR and Fire Prevention Office of any schedule changes. The contractor shall also provide the COR and the Fire Prevention Office/Fire Inspector a copy of all cleaning schedules via email no later than three (5) days prior to the scheduled cleaning. 1.1.3. ANNUAL CLEANINGS. Systems in Appendix A identified as annual cleanings shall be serviced no later than 365 days and no earlier than 330 days from the previous cleaning service. 1.1.4. QUARTERLY CLEANINGS. Systems in Appendix A identified as quarterly cleanings DRAFT -- 3 of 19 -- 4 shall be serviced no later than 90 days and no earlier than 75 days from the previous cleaning service. DRAFT -- 4 of 19 -- 5 1.1.5 Reserved 1.1.6. REFUSE DISPOSAL. The contractor shall gather and remove at the end of each work period all grease, lint, dirt, dust, rags and other refuse or debris generated in the performance of this contract. The contractor shall haul all refuse off Buckley Space Force Base for disposal in accordance with federal, state and local laws. 1.1.7. OUTAGES. The contractor shall notify the COR, of any proposed electrical outage necessitated by work under this contract. The contractor shall notify the COR 10 work days prior to the outage and shall stipulate the specific utility system(s) and circuits to be affected, the location, time and duration of the outage. The contractor shall keep both outages and duration to a minimum. 1.1.8. FANS. If it is necessary to remove fans to facilitate the cleaning of the fans or ductwork , the contractor shall be responsible for this work and shall ensure that removal and reinstallation is accomplished by an individual with expertise in this type of work. It shall be the responsibility of the contractor to report to the COR defective conditions of any fan which he may discover, (e.g. worn bearings, broken belts, burned out motor, insufficient pull and broken wires). If electrical work is required in removal/reinstallation of fans, the contractor shall be responsible for this work and shall ensure that fans are properly re-connected electrically. 1.1.9. All electrical equipment used by the contractor shall meet all safety requirements of this contract and shall be Under Writer Laboratories (UL) approved. This equipment must operate using existing building circuits. It shall be the responsibility of the contractor to prevent the operation or attempted operation of electrical equipment. The contractor shall, at the start of the cleaning process, lock out any electrical switches that could be activated accidentally during the cleaning process. At the close of cleaning operations, exhaust blowers shall be restarted. All access doors utilized during cleaning shall be refastened. Dampers positioned for proper exhaust airflow and electrical switches and system components returned to operable state. When cleaning procedures are complet…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 561790