What this opportunity is
The Department of Defense is seeking a contractor to provide testing services for hot sticks and gloves at Travis Air Force Base, California, under a Firm Fixed Price contract set aside for small businesses. The contract requires testing of 127 pairs of gloves and 2 blankets biannually, along with annual testing of 3 hot sticks, adhering to ASTM/ANSI/OSHA standards. Interested small businesses should note that this is a Combined Synopsis/Solicitation notice, indicating they need to prepare a complete proposal with required documentation to be considered for award.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
STATEMENT OF WORK
FOR ELECTRICAL HOT STICKS AND
GLOVES
TRAVIS AIR FORCE BASE, CALIFORNIA
04-AUGUST-26
-- 1 of 5 --
2
1. DESCRIPTION OF SERVICES (NON-PERSONAL): The contractor shall provide all personnel,
equipment, supplies, facilities, transportation, tools, materials, supervision, and labor to test, inspect,
service necessary to test high/low voltage rubber protective gear in accordance with the following
ASTM/ANSI/OSHA of Electrical Hot Line Tools located at Travis Air Force Base (AFB), California.
The contractor shall be fully accredited by the National Association of Independent Laboratories for
testing low/high voltage rubber protective goods, to the following ASTM/ANSI/OSHA standards, local,
state and federal laws. The government shall not exercise any supervision or control over any sub-contract
service providers performing the services herein. Such contract service providers shall be accountable
solely to the contractor who, in turn, is responsible to the government.
1.1. Preparation, Packaging, and Shipping. The Government shall conduct and document an initial
inventory of all gloves, hot sticks, and blankets prior to releasing them to the Contractor. The Contractor
shall physically handle all preparation, packaging, and securing of these items at Travis AFB (TAFB)
prior to transit, and shall provide all packaging materials, postage, shipping labels, and transportation
logistics required to ship the items to and from the Contractor's testing facility at no additional cost to the
Government. Within one (1) week of receiving the items at the testing facility, the Contractor shall
conduct a receiving inventory to verify the exact quantity and description of items received against the
Government’s initial inventory documentation. The Contractor shall submit a written inventory
verification report to the Government Contracting Officer's Representative (COR) within this timeframe.
The Contractor shall ensure a maximum turnaround time of 30 calendar days (1 month) from the date of
shipment receipt to the return of the tested items to the Government.
1.2. Testing Procedures. During testing the contractor shall use a solvent cleaner that shall be
environmentally acceptable. Detergent washing shall use mild detergent. Dielectric testing procedure
shall be done in accordance with ASTM standards; rubber goods will be rejected during this step for
electrical breakdown and leakage current exceeding maximum limits set forth in ASTM standards. Drying
shall be done by circulating warm air. Rubber goods shall be carefully visually inspected inside and out
for age cracking, imperfections in the rubber, minor tears, chemical attack and corona cutting. Stamping
of the rubber goods shall be stamped in ink, and the boxes are labeled in accordance with ASTM. Packing
of the rubber goods shall be packed in cartons. Rejected gloves shall be marked and returned.
Documentation shall be written and written certification of results shall be furnished for all tested
materials. All testing shall be done at the contractor’s facilities. The government may ask for any SDS(s)
on the above items.
1.3. Inspections and cleaning. The contractor shall perform an assessment of all Electrical Hot Line
Tools and determine the condition of the equipment. Any defective component will be reported to the
government. Cleaning, inspecting and waxing shall be in accordance to the care and maintenance guide
of the Electrical Hot Line Tools.
1.4. Maintenance Service. The contractor shall service the equipment in accordance with the highest
standards of workmanship. The contractor shall test up to 127 pairs of gloves every 6 months to total up
to 254 pairs in a year. The contractor shall test up to 2 (two) blankets every 6 (six) months to total up to
4 (four) blankets in a year. The contractor shall only test hot sticks once every year NOT every six
months to include 1 (one) shotgun hot stick, 1 (one) standard straight hot stick and 1 (one) 6
section/telescopic hot sticks. Partial payments are authorized upon completion of required services and
acceptance by the Government. All services shall be completed within 30 calendar days (1 month) from
the date the contractor initially receives the gear that shall be certified safety
tested/stamped/tagged/labeled.
-- 2 of 5 --
3
1.5. Materials. The government will not provide any parts, materials, or supplies.
2. Quality Control. The contractor is required to control the quality-of-service delivery and offer to
the government for acceptance only services which conform to contract requirements. The overall control
of quality must meet the specified performance thresholds.
2.1. Records of work completed shall be kept and made available to the government throughout the
contract performance period and for the period after contract completion until final settlement of any
claims under this contract.
2.1.1. The COR is the authorized government representative who will perform assessments of the
Contractor’s performance. Subsequent to contract award, the identity of the COR(s), with a letter defining
their duties and authority will be furnished to the successful bidder/offeror.
2.1.2. The COR(s) or alternate(s) will inform the contract manager when discrepancies
occur and will request corrective action. The COR(s) or alternate(s) will make a notation of the
discrepancy on their surveillance checklist with the date and time the discrepancy was noted.
2.1.3. The services to be performed by the contractor during the period of this contract shall at
all times and places be subject to review by the CO/COR or authorized representative(s). The CE
Electrical Shop shall perform all inspections of the returned items and report to the CO/COR with any
issues.
2.2. Performance Assessment. All work will be performed using properly trained technicians and
appropriate tools and equipment specific to the task to accomplish the work in a manner that is considered
acceptable industry wide. At any time COR(s) o…
Source: SAM.gov, as posted. Verify the current solicitation before responding.