What this opportunity is
The Department of Defense is seeking a contractor to provide rental construction equipment and related services for site development at Panama Pacifico International Airport. This opportunity is not set aside for small businesses, making it suitable for larger contractors. The solicitation is a combined synopsis/solicitation, meaning interested parties should track the notice closely and submit proposals as specified, rather than waiting for a separate solicitation document.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PERFORMANCE WORK STATEMENT (PWS)
Version 1
October 2026
Page 1 of 30
4PWS Ver 1 2025-12
[PPIA JSCG-P RLB Site Development– Equipment]
Part 1
General Information
1. GENERAL: This is a non-personal services contract under which the personnel rendering the services
are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and
control usually prevailing in relationships between the Government and its employees. The United States
(U.S.) Government shall not exercise any supervision or control over the Contractor’s employees
performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in
turn shall be responsible to the U.S. Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies,
facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary
to perform the delivery and maintenance of rental construction equipment at Panama Pacifico International
Airport (PPIA) as defined in this Performance Work Statement (PWS) except for those items specified as
government furnished property (GFP) and government furnished services (GFS). The contractor shall
perform to the standards in this contract.
1.2 Background: U.S. Army troops will conduct construction activities at one (1) designated work area
identified in Technical Exhibit 1. The delivery of leased construction equipment, refueling and
replenishing support will enable U.S. forces to conduct required construction tasks at Panama Pacifico
International Airport (PPIA).
1.3 Objectives: The objective of this requirement is to provide and deliver leased construction equipment
and refueling services in support of U.S. Army engineer operations at Panama Pacifico International
Airport (PPIA). The contractor shall provide equipment and services only; all construction tasks will be
performed by U.S. forces.
1.4 Scope: The Contractor shall provide all materials, labor, equipment, fuel, transportation, and
documentation required to deliver leased construction equipment, and refueling services in support of troop
construction operations at Panama Pacifico International Airport (PPIA). The project aims to ensure
compliance with all applicable Panama and local regulations while prioritizing safety and environmental
protection.
1.5 Period of Performance: The period of performance for this contract is from 30 November 2026 to 22
December 2026. If a Contractor’s or Subcontractor’s certification or permit expires, and this causes the
firm to not be allowed to perform any work until the certification or permit is reissued, then requests for
extension of time for any delay to the completion of the project due to an inactive certification or permit
will not be considered and liquidated damages will apply. Notify the Contracting Officer of any change in
Contractor certification or permit status.
1.6 General Information:
1.6.1 Quality Control Plan (QCP): RESERVED
1.6.2 Quality Assurance (QA): The government shall evaluate the contractor’s performance under this
contract in accordance with (IAW) the Quality Assurance Surveillance Plan. This plan is primarily focused
on what the Government must do to ensure that the contractor has performed IAW the performance
standards and contract quality requirements are met. Contract quality requirements mean the technical
requirements in the contract relating to the quality of the product or service and those contract clauses
prescribing inspection, and other quality controls incumbent on the contractor, to ensure the product or
service conforms to the contractual requirements. It defines how the performance standards will be
applied, the frequency of surveillance, the performance threshold, and deductions, if applicable.
-- 1 of 30 --
PERFORMANCE WORK STATEMENT (PWS)
Version 1
October 2026
Page 2 of 30
4PWS Ver 1 2025-12
1.6.3 Recognized Holidays:
New Year’s Day 1-JAN
Shrove (Carnival) Day 17-FEB
Good Day 3-APR
Labor Day 1-MAY
Separation Day From Colombia 3-NOV
Colon Day 5-NOV
Los Santos Uprising Day 10-NOV
Independence Day from Spain 28-NOV
Mother’s Day 8-DEC
Christmas Day 25-DEC
1.6.4 Hours of Operation: The contractor is responsible for conducting business between the hours of
8:00am through 5:00pm Monday through Friday, except Federal holidays or when the Government facility
is closed due to local or national emergencies, administrative closings, or similar Government directed
facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the
government facility is closed for the above reasons. The Contractor must, at all times, maintain an adequate
workforce for the uninterrupted performance of all tasks defined within this PWS when the Government
facility is not closed for the above reasons.
1.6.5 Place of Performance: The work to be performed under this contract will be performed in vicinity of
Panama Pacifico International Airport bordered by Avenue Continental to the north a hardball street to
Veracruz on the southern border and to the west by wood line. Location is shown in Technical Exhibit 1.
1.6.6 Type of Contract: The Government plans to award a Firm Fixed Price contract for this project.
1.6.7 Access and General Protection Policy and Procedures:
1.6.7.1 FPCON: RESERVED
1.6.7.2 Physical Security: The Contractor shall be responsible for safeguarding all government equipment,
information, and property provided for contractor use.
1.6.7.3 Escorts: The Contractor and all associated sub-contractor employees performing services under this
contract shall be escorted. Escort availability must be coordinated; delays due to unavailable escorts shall be
resolved through COR.
1.6.7.4 Personnel Security Clearance Requirements: RESERVED
1.6.7.5 Background Checks: The Contractor shall ensure contractor employees and subcontractor
employees performing services under this contract have passed a sec…
Source: SAM.gov, as posted. Verify the current solicitation before responding.