The Department of Defense is seeking a contractor to conduct a comprehensive bathymetric sludge survey, sampling, and laboratory analysis for the East and West lagoon systems at Minot Air Force Base in North Dakota. This opportunity is set aside for total small businesses under NAICS 541380. Interested vendors should note that this is a Combined Synopsis/Solicitation notice, indicating they should track the opportunity closely for further details and submission requirements rather than submitting a bid immediately.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK
FOR
Lagoon Sludge Survey, Sampling, and Analysis - Minot Air Force Base, ND
Date: March 7, 2026
1. SCOPE
1.1 Introduction
This Statement of Work (SOW) defines the requirements for a contractor to perform a
comprehensive bathymetric sludge survey, as well as sludge sampling and laboratory analysis,
for the East and West lagoon systems located at Minot Air Force Base (AFB), North Dakota.
1.2 Background
Minot AFB operates two, three-cell lagoon systems for treating domestic and industrial
wastewater. Both lagoon systems treat domestic and industrial waste. To address existing odor
and sludge concerns, the facility requires a detailed sludge survey and analysis. This work will
provide critical data on sludge volume, distribution, and composition to support future
operational and maintenance decisions.
1.3 Scope of Work
The contractor shall provide all personnel, equipment, materials, and services necessary to
conduct a sludge survey, collect representative sludge samples, and perform detailed laboratory
analysis on the East and West lagoon systems. The primary objectives are to identify pond
volume, sludge infill, sludge characteristics, and to provide a comprehensive report of the
findings.
2. ACRONYMS AND DEFINITIONS
• AFB: Air Force Base
• NPDES: National Pollutant Discharge Elimination System
• PCB: Polychlorinated Biphenyls
• PFAS: Per- and Polyfluoroalkyl Substances
• SOW: Statement of Work
-- 1 of 3 --
3. REQUIREMENTS
3.1 General
The contractor shall provide all supervision, labor, travel, technology, and equipment required
to perform the services described in this SOW, in accordance with all applicable federal, state,
and local regulations.
3.2 East Lagoon System Survey
3.2.1. The contractor shall perform a bathymetric sludge survey for the three ponds of
the East Lagoon system (totaling approximately 137 acres).
3.2.2. The contractor shall utilize appropriate methods and equipment to collect the
necessary data.
3.2.3. The contractor shall collect high-resolution bathymetric and sludge depth data
sufficient to accurately characterize sludge volumes and distribution throughout the
surveyed areas.
3.3 West Lagoon System Survey
3.3.1. The contractor shall perform a bathymetric sludge survey for the three ponds of
the West Lagoon system (totaling approximately 174 acres).
3.3.2. The contractor shall utilize appropriate methods and equipment to collect the
necessary data.
3.3.3. The contractor shall collect high-resolution bathymetric and sludge depth data
sufficient to accurately characterize sludge volumes and distribution throughout the
surveyed areas.
3.4 Sludge Sampling and Laboratory Analysis
3.4.1. The contractor shall collect eighteen (18) composite sludge samples from the six
(6) lagoon ponds across the East and West systems.
3.4.2. All samples shall be properly preserved and transported to a certified laboratory
for analysis as required per North Dakota Administrative Code 33.1-23-02-04.
3.4.3. The laboratory analysis shall include, at a minimum, the following parameters for
each of the 18 samples:
Analyte/Parameter
Solids-Total
Fecal Coliform
Total Volatile Solids
Nitrate+Nitrite
Ammonia
-- 2 of 3 --
Phosphorus
Total Kjeldahl Nitrogen (TKN)
Mercury
Arsenic
Cadmium
Chromium
Copper
Lead
Molybdenum
Nickel
Selenium
Silver
Zinc
pH
Temperature
Total PCBs (Polychlorinated Biphenyls)
PFAS (Per- and Polyfluoroalkyl Substances)
3.5 Data and Deliverables
The contractor shall provide the following deliverables to Minot AFB:
3.5.1. A detailed map and sludge profile for all ponds surveyed in both the East and
West lagoon systems.
3.5.2. A comprehensive, professionally bound report detailing the findings of the survey
for each lagoon system. This report shall include calculations of sludge volume and
distribution.
3.5.3. A Certificate of Analysis from the laboratory detailing the results for all 18
samples, including testing methods, detection limits, and quality control data.
3.5.4. A digital copy of the final survey report, the Certificate of Analysis, and all raw
survey data.
3.6 Project Management
3.6.1. The contractor shall identify a single point of contact to act as the Project
Manager.
3.6.2. Upon contract award, the contractor shall provide a project schedule outlining key
milestones and the final delivery date.
-- 3 of 3 --