Skip to content

Open for responses

Lake Red Rock Refuse Removal Services

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W912EK27QA006
NAICS
562111
PSC
S205
Posted
November 17, 2026
Response due
November 30, 2026
Place of performance
Knoxville, IA

Description

PERFORMANCE WORK STATEMENT (PWS) REFUSE PICKUP AND DISPOSAL SERVICES LAKE RED ROCK PROJECT, IOWA SECTION TITLE C-1 GENERAL INFORMATION C-2 SUPPLIES PROVIDED C-3 CONTRACTOR SUPPLIED ITEMS C-4 PERFORMANCE REQUIREMENTS SUMMARY C-5 SECURITY C-6 SUSTAINABILITY C-7 TECHNICAL CAPABILITY STATEMENT C-8 USACE PAST PERFORMANCE QUESTIONNAIRE (PPQ) TECHNICAL EXHIBITS TE-1 QUALITY ASSURANCE SURVEILLANCE PLAN TE-2 REFUSE COLLECTION, REMOVAL AND DISPOSAL SPECIFICATIONS -- 1 of 19 -- SECTION C-1 GENERAL INFORMATION C.1.1 BACKGROUND. The U.S. Army Corps of Engineers Lake Red Rock Project is a flood control reservoir in Iowa. A wide variety of recreational facilities are offered, including boat launching ramps, campgrounds, picnic areas and swimming beaches. The Corps of Engineers contracts many routine tasks to the private sector including Waste Management. Maps showing the recreation areas at Lake Red Rock can be found on the internet at: http://www.mvr.usace.army.mil/redrock/maps/default.htm. C.1.2 SCOPE OF WORK. Work consists of providing refuse collection, removal and disposal services. The contractor will furnish items such as refuse storage containers, labor, supplies, fuel and vehicles necessary to collect, transport and properly dispose of refuse from the U.S. Army Corps of Engineers, Lake Red Rock Project, Marion County, Iowa. Refer to Technical Exhibit #2 for specific container locations, quantity, pick up schedule and frequency of services. C.1.2.1 REFUSE COLLECTION: Contractor will supply refuse containers according to the cubic yards capacity at the locations specified in Technical Exhibit #2. All containers shall be low-profile containers and must be approved by the Government prior to installation. The Contractor will furnish the vehicles necessary to collect and transport refuse. Vehicles used for pickup and transport shall be equipped with a covered body. The body shall be kept in good repair and shall not be capable of leaking effluent upon roadways or other public areas. The vehicles should be of sufficient size and/or number to enable the Contractor to service all areas under any circumstance. Trucks used for hauling will be regularly cleaned and treated with odor-preventive chemicals. This will be accomplished a minimum of weekly. Vehicles shall not be stored on government lands. The surrounding area will be cleaned, each time, to remove all refuse within a 20-foot radius of the container storage site. C.1.2.2 DISPOSAL: Contents of the refuse containers will be transported to an approved State facility for disposal. All facility charges shall be borne by the successful bidder. C.1.2.3 CONTAINERS LOCATIONS: Containers will be placed at a minimum of eleven (11) general locations: 1. Maintenance Compound (1 dumpster area) 2. Maintenance Compound Recycling (1 dumpster area) 3. Howell Station (4 dumpster areas) -- 2 of 19 -- 4. South Tailwater (1 dumpster area) 5. Marina Cove (1 dumpster area) 6. Wallashuck (2 dumpster areas) 7. Whitebreast (2 dumpster areas) 8. North Overlook (1 dumpster area) 9. North Tailwater (1 dumpster area) 10. Fifield (1 dumpster area) 11. Ivans (1 dumpster area) 12. Roll off (Up to 10 dumpsters, as specified by COR) C.1.2.4 CONTAINER CONDITION: All containers shall be low-profile containers and be in good condition and maintained to ensure proper lid closure. Containers will be cleaned and treated with odor preventive chemicals as needed not to exceed one time per week. The COR may request that containers be swapped out due to offensive odor or disrepair. C.1.2 LENGTH OF CONTRACT. Award will be for a base period plus four option periods as follows: Base Period: 1 March 2027 – 28 February 2028 Option Period I: 1 March 2028 – 29 February 2029 Option Period II: 1 March 2029 – 28 February 2030 Option Period III: 1 March 2030 – 28 February 2031 Option Period IV: 1 March 2031 – 28 February 2032 Contract will not exceed five years. Option periods may or may not be exercised at the discretion of the Government, not the Contractor. C.1.3 WORK SCHEDULE. Refuse containers shall be emptied according to schedule listed in Technical Exhibit 2. C.1.4 REQUIRED INSURANCE. In accordance with the FAR Clause 52.228-5 titled “Insurance-Work on a Government Installation” the Contractor shall obtain and maintain during the period of performance under this contract the following kinds and minimum amounts of insurance*: Workmen’s Compensation Coverage complying with State Statute** Employer’s Liability Minimum $100,000 General Liability/Bodily Injury Minimum $500,000 per occurrence Automobile Liability Minimum $200,000 per person $500,000 per occurrence -- 3 of 19 -- $20,000 property per occurrence * Reference FAR 28.307-2 Liability, subparagraphs (a), (b) and (c). ** Iowa Insurance Division, telephone 515/281-5705 Iowa Division of Workers Compensation, telephone 800/562-4692 C.1.5 COORDINATION MEETING. As soon as practical after contract award and before start of the services, the Contractor shall meet with the Contracting Officer's Representative (COR). The Contractor shall also be prepared to submit and discuss at this meeting the following items: C.1.6.1 Insurance Certificate: The Contractor must furnish proof of insurance per section C.1.5; C.1.6.2 Letter Designating On-the-Job Supervisor(s): The name of the person designated by the Contractor as responsible for inspecting work performed and compliance with contract provisions; C.1.6.3 Contractor’s Quality Control Plan and Inspector. The quality control program is in place to assure the requirements of the contract are provided as specified in Section C.1.8; C.1.6.4 Accident Prevention Plan. All work shall be performed in accordance with the Contractor’s Accident Prevention Plan which shall include applicable safety requirements set forth in the current Corps of Engineers Manual EM 385-1-1 "Safety and Health Requirements Manual". A link to the most current version will be provided upon request. C.1.6.5 Drive…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 562111