Skip to content

Open for responses

Large Component Blast Booth, 309 Aerospace Maintenance and Regeneration Group (AMARG), Davis-Monthan AFB, AZ 85707

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
FA8227-27-SS-AMARGLCBB
NAICS
332311
PSC
5450
Posted
November 17, 2026
Response due
December 19, 2026
Place of performance
Tucson, AZ

Description

Page 1 of 37 STATEMENT OF WORK (SOW) LARGE COMPONENT BEAD BLAST BOOTH WITH PRE-ENGINEERED METAL BUILDING UNITED STATES AIR FORCE OGDEN AIR LOGISTICS COMPLEX (OO-ALC) 09 November 2026 -- 1 of 37 -- Page 2 of 37 1. DESCRIPTION OF REQUIREMENT 1.1. Provide a complete and Turn-Key design, construction, and installation of a new corrosion control facility at the 309th Aerospace Maintenance and Regeneration Group (AMARG), located within a controlled area of Davis-Monthan Air Force Base (DMAFB), Arizona. The primary function is the corrosion control of Aerospace Ground Equipment (AGE) and other ferrous related items. The media blast booth will be housed within a fully enclosed Pre-Engineered Metal Building (PEMB) that also provides a separated maintenance support operations area (MX Ops Area). The entire facility shall be constructed on a currently unimproved site located North of Building 7213 (the Small Paint Booth), see Appendix A. 1.2. The performing contractor is responsible for providing all management, professional services, labor, materials, and equipment to deliver a fully functional and operational facility. The scope includes, but is not limited to, the following key tasks: 1.2.1. The Contractor shall be responsible for developing a complete design package, which shall be stamped and certified by licensed Professional Engineer(s) and Fire Protection Engineer(s) registered in any of the 50 United States. 1.2.2. Plastic Media Blast Booth: Furnish, install, and commission a complete, stand-alone system. The system must be appropriately sized for various AGE (Section 4.10.), include media recovery and dust collection systems, associated controls, safety features, IAW hazardous location requirements. 1.2.3. PEMB (~60’ x 100’): Design, furnish, and erect a new, permanent, weather-tight metal building to fully enclose the blast booth, and provide a separate maintenance operations area. The structure must be fully compliant with all, but not limited to, architectural and engineering standards outlined in the DMAFB Design Compatibility Guidelines. 1.2.4. Utilities and Site Work: Identify, design, and construct all supporting utility infrastructure; electrical, water, sanitary sewer, etc. This includes all site work, foundations, grading, drainage, and paving necessary to support the new facility. 1.3. Applicable guidance, regulations, & standards. 1.3.1. As the Designer of Record, the Contractor is solely responsible for research, identification, and compliance with all federal, state, local, and Department of Defense and/or War guidance, regulations, and standards. This includes, but is not limited to, all Unified Facilities Criteria (UFC), Air Force Instructions (AFI), National Fire Protection Association (NFPA) codes, and DMAFB Design Guidelines. The list provided in Appendix C is a baseline and is not exhaustive; the Contractor is responsible for adherence to all applicable regulations regardless of whether they are listed. In case of conflicting requirements, the most stringent regulation shall govern. The Contractor’s licensed Professional Engineer of Record shall assume full professional liability for the final constructed facility's compliance with all such governing criteria. 1.4. COTS Preference and Justification 1.4.1. The design shall prioritize and implement Commercial Off-The-Shelf (COTS) or modified-COTS solutions for all components and assemblies. 1.4.2. Non-COTS Justification and Analysis: Proposing a Non-COTS (custom fabricated) component or assembly is permissible only when it can be definitively proven that a COTS or Modified-COTS solution is incapable of meeting mandatory performance specifications. In such cases, the Contractor shall submit a formal Non-COTS Justification Report for each proposed item, demonstrating the following: 1.4.2.1. Analysis of Alternatives (AoA): Documented market research and analysis proving that no fewer than three (3) viable COTS or Modified-COTS alternatives can meet the government's minimum performance requirements as stated in this SOW. The AoA must detail why each alternative considered is technically insufficient. 1.4.2.2. Life Cycle Cost Analysis (LCCA): A comprehensive LCCA comparing the proposed Non-COTS item against the closest COTS alternative (even if deemed insufficient). The LCCA must be calculated over the 40-year engineered lifespan of the PEMB (as stated in 3.1.3) and shall include, at a minimum: initial acquisition and fabrication costs, installation, projected energy consumption, and scheduled preventative maintenance costs. 1.4.3. The Contractor shall maintain a COTS Determination and Justification Log. This log must be submitted with each design stage (30%, 60%, 90%) and must accompany each Non-COTS Justification Report (CDRL A008) provided to the Contracting Officer (CO), Contracting Officer -- 2 of 37 -- Page 3 of 37 Representative (COR), and Project Manager(s) (PMs) for review and written approval prior to any procurement. The log shall include the minimum following fields: 1.4.3.1. Component Name 1.4.3.2. Required Performance Specification(s) 1.4.3.3. COTS Alternative(s) Considered (if any) 1.4.3.4. Justification for Non-COTS Selection (including specific reasons why COTS alternatives were unsuitable) 1.4.3.5. Cost Comparison 1.4.3.6. Approval: All Non-COTS selections require prior written approval from the CO. 1.5. CONTROL SYSTEM, INTERFACE, AND CYBERSECURITY REQUIREMENTS 1.5.1. If applicable: All digital control systems are considered Facility-Related Control Systems and shall be designed, installed, and documented to achieve a formal Authority to Operate (ATO) from the cognizant Davis-Monthan AFB authorizing official. The Contractor shall be responsible for developing the full Risk Management Framework (RMF) package in accordance with UFC 4-010- 06, Cybersecurity of Facility-Related Control Systems, and DoDI 8510.01. The system must meet, at a minimum, the security controls for Impact Level 2 (IL2), unle…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 332311