Lenel & Milestone Maintenance Support Services for Security Cameras

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
HT001426RE008
NAICS
561621
PSC
J063
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 16, 2026
Response due
July 13, 2026
Place of performance
Bethesda, MD

What this opportunity is

The Department of Defense is seeking total small business set-aside proposals for Lenel and Milestone On-Site Maintenance Support Services at Walter Reed National Military Medical Center in Bethesda, MD. This contract involves providing non-personal services, including all necessary personnel and equipment, to maintain the OnGuard Access Control System and Video Management System. Interested small businesses should note that this is a solicitation notice, indicating they should track the opportunity closely for bidding details and requirements.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Department of Defense Defense Health Agency Performance Work Statement Lenel & Milestone On-Site Maintenance Support Services Operations Department Walter Reed National Military Medical Center, Bethesda, Maryland Solicitation Number: Version: Date:   PART 1 1.0 GENERAL INFORMATION 1.1 This is a non-personal services contract to provide Lenel & Milestone On-Site Maintenance Support Services for the Operations Department at Walter Reed National Military Medical Center (WRNMMC), Bethesda, MD. 1.2 Description of services/introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this PWS. 1.3 Background: The OnGuard Access Control System (ACS) supports up to 32 doors or other access points and includes comprehensive event logging, notification and escalation. The ACS provides configurable system status and response actions such as system lockdowns. Detailed, credential-driven user records and access history are documented in pre-defined and custom reports. The System includes: • Web Interface • Blade Support • Solid-State Design • Video Integration • API Support • Automated System Management • Mobile App 1.3.1 Certification requirement: To ensure continuous, secure, and optimal performance of the physical security infrastructure at WRNMMC, technicians are required to hold certifications for both the ACS and the VMS. These certifications validate the technicians' proficiency in handling the complex configuration, installation, and daily maintenance of these integrated security platforms. For the OnGuard ACS, technicians must achieve and maintain the Lenel S2 OnGuard 8.2 Core Certification, primarily obtained through the Lenel Certified Associate (LCA) track. This training ensures technicians are fully capable of managing the backend architecture—such as database, Operating System, and SQL configurations—as well as the physical hardware and daily operational workflows like alarm monitoring and cardholder management. For the Milestone VMS, technicians must complete the Milestone Knowledge Program, specifically securing the Technical Configuration 1 and Technical Configuration 2 certifications. This multi-tiered certification ensures that technicians possess the advanced technical proficiency required to deploy, configure, and maintain highly complex video management installations across the enterprise network. 1.3.2 OnGuard ACS requirement Breakdown Requirement Area Detail Required Certification Lenel S2 OnGuard 8.2 Core Certification (Lenel Certified Associate – LCA track) Primary Objective Maintain technician proficiency to guarantee the uninterrupted operational status of the ACS systems at WRNMMC. System Maintenance Breakdown • Backend Infrastructure: Database and Operating System (OS) setup, alongside SQL server configuration. • Hardware Architecture: Installation, maintenance, and troubleshooting of access control panels and physical card readers. • Operational Systems: Management of alarm monitoring systems and administration of cardholder databases. 1.3.3 Milestone VMS requirement Breakdown Requirement Area Detail Required Certification Milestone Knowledge Program: Technical Configuration Level 1 & Technical Configuration Level 2 Primary Objective Validate technician expertise in the comprehensive installation, configuration, and maintenance of complex VMS environments. System Maintenance Breakdown • VMS Architecture: Installation and configuration of complex, enterprise-level VMS networks. • System Operations: Ongoing maintenance of recording servers, live video routing, and associated integrated camera infrastructure. 1.4 Objectives: The contractor shall furnish two (2) Full-Time Equivalent (FTE) Lenel OnGuard certified maintenance technicians and one (1) Full-Time Equivalent (FTE) Milestone certified system administrator/technician to perform on-site tasks five (5) days per week. The hours of operation shall be 0800 to 1600 daily, on an annual basis. The base period of performance shall begin on July 1, 2026, and end on June 30, 2027. This agreement shall include four (4) consecutive one-year option periods, beginning on July 1, 2027, and ending on June 30, 2031. 1.5 Scope: Service and Maintenance shall be performed in accordance with the specifications and terms of this PWS and IAW contractors’ s Lenel & Milestone Support Services Proposal. 1.6 Period of Performance (PoP): Base Year – July 1, 2026, through June 30, 2027 Option Year 01 – July 1, 2027, through June 30, 2028 Option Year 02 – July 1, 2028, through June 30, 2029 Option Year 03 – July 1, 2029, through June 30, 2030 Option Year 04 – July 1, 2030, through June 30, 2031 1.6.1 Transition: Transition-in/transition-out period. Reserved. 1.7 Administrative specifications 1.7.1 Place of performance: The work shall be performed at Walter Reed National Military Medical Center, Bethesda, Maryland. 1.7.2 Recognized Federal holidays: Fulfillment and delivery of orders may be required on Federal holidays. New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Day Christmas Day Independence Day 1.7.3 Hours of operation: The contractor is responsible for conducting business Monday through Friday, from 0800 to 1600 on an annual basis, except on recognized Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed fac

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 561621)