Description
United States Department of Agriculture
Agricultural Research Service
100% Contract Documents
Contract No. 12505B23F0175
Order Date. 9/25/2023
BED Project No. 023116
USDA National Center for Animal Health
Building 7 Lighting Renovation
1920 Dayton Avenue
Ames, IA 50010
Date:8/12/2025
Bailey Edward Design, Inc.
35 E Wacker Drive
Suite 2800
Chicago, IL 60601
312-440-2300
USDA
-- 1 of 114 --
United States Department of Agriculture
Contract No: 12505B23D0008/1250B23F0175
Project No: NCAH-FEU #22005
USDA – NCAH Building 7 Lighting Renovation
1920 Dayton Avenue Ames, Iowa 50010
TOC - 1
TABLE OF CONTENTS
Division 01 – General Requirements
Section 01 01 00 General Requirements 01 01 00 – 08
Section 01 25 00 Substitution Procedures 01 25 00 – 03
Section 01 25 01 Substitution Request Form 01 25 01 – 02
Section 01 50 00 Temporary Facilities and Controls 01 50 00 – 06
Division 02 – Existing Conditions
Section 02 41 19 Selective Demolition 02 41 19 – 07
Division 26 – Electrical
Section 26 05 00 Basic Electrical Requirements 26 05 00 – 33
Section 26 05 03 Through Penetration Fire Stopping 26 05 03 – 07
Section 26 05 05 Electrical Demolition For Remodeling 26 05 05 – 04
Section 26 05 13 Wire and Cable 26 05 13 – 12
Section 26 05 33 Raceways and Boxes for Electrical Systems 26 05 33 – 09
Section 26 09 34 Lighting Control Systems 26 09 34 – 37
Section 26 27 26 Wiring Devices 26 27 26 – 35
Section 26 51 19 LED Lighting 26 51 19 – 12
END OF TOC
-- 2 of 114 --
USDA NCAH Building 7 Lighting Renovation
Ames, IA
GENERAL REQUIREMENTS 01 01 00 - 1
SECTION 01 01 00 – GENERAL REQUIREMENTS
1.1 Scope of Work
A. Project Title: Building 7 Lighting Renovation
B. Project Location: USDA – National Centers for Animal Health
1920 Dayton Avenue, Ames, IA 50010
C. Description of Work: The work is described in the Construction Documents and the major elements are:
1. Complete removal and upgrade of the existing lighting and lighting control systems.
2. The contractor shall commission the lighting control system.
3. The contractor shall phase the efforts to maintain partial operation of research during construction.
D. Construction Documents:
Technical Specifications & Drawings: Dated 10 11 2024 and prepared by Bailey Edward Design, 35 East
Wacker Drive, Suite 2800, Chicago, IL 60601
1.2 Pre-Bid/Proposal Site Visit
A. Differing Site Conditions, and Site Investigations and Conditions Affecting the Work clauses are included in
this solicitation. Accordingly, offerors or quoters are urged to inspect the site where the work will be
performed.
B. An organized pre-bid site visit for this project will be scheduled for this project
1. The date and time set by the Contracting Officer, at the project location site:
USDA National Center for Animal Health
1920 Dayton Avenue
Ames, IA 50010
2. The pre-bid site visit for this project is not mandatory for the Bidders. The Bidders are responsible
for accounting for all existing conditions that may have been visible at the time of the bidding
whether or not they attended the pre-bid conference. Failure of Bidders to attend the pre-bid
conference does not relieve the Bidders of the responsibility of including existing conditions in their
bids.
1.3 Pre-Construction Conference
A. The Contractor and major subcontractor representatives shall attend the virtual post-award/preconstruction
meeting scheduled by the Contracting Officer (CO). The meeting topics will include submissions required
prior to issuance of the Notice to Proceed (NTP), contract management, roles of the government’s
representatives (COR, LC, and A-E), the project schedule, submittal procedures, payment application
procedures, site access, contract close-out, and other issues as determined by the CO. Meeting notes will
be distributed by the contractor.
1.4 Progress Meetings
-- 3 of 114 --
USDA NCAH Building 7 Lighting Renovation
Ames, IA
GENERAL REQUIREMENTS 01 01 00 - 2
A. The Contractor, and subcontractors as appropriate for the current work activity, shall attend bi-weekly
construction progress meetings on the site. The meeting will generally be held at a regular time each week.
The Contractor will report on current progress, short-term work plans, and will update the work schedule.
Meeting topics will also include government coordination, RFIs, unforeseen conditions, inspection reports &
observations, potential changes, submittals, and payment applications. Meeting notes will be recorded and
distributed by the contractor. The contractor shall manage the kick-off and progress meetings that are held
every other week. Provide an agenda, submittal log, and three weeks look ahead no less than 24 hours
prior to the meeting. Provide minutes for the meeting within 48 hours of the completion of the meeting. The
A-E of record for the project will attend the meeting virtually once each month and at critical times during the
construction period. During periods of minimal or no on-site activity, the COR may cancel the meeting.
1.5 Superintendence by the Contractor
A. At all times during performance of this contract and until the work is completed and accepted, the Contractor
shall directly superintend the work or assign and have on the worksite competent superintendent who is
satisfactory to the Contracting Officer and the COR, and has authority to act for the Contractor.
1.6 Permits and Responsibilities
A. The contractor shall, without additional expense to the government, be responsible for obtaining any
necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and
regulations applicable to the performance of the work. The contractor shall also be responsible for all
damages to persons or property that occur as a result of the contractor's fault or negligence. The contractor
shall also be responsible for all materials delivered and work performed until completion and acceptance of
the entire work, except for any completed unit of work which may have been …
Source: SAM.gov, as posted. Verify the current solicitation before responding.