What this opportunity is
The U.S. Army Corps of Engineers (USACE) is seeking professional services for the Missouri River Recovery Implementation Committee (MRRIC) Chair, focusing on facilitating consensus among diverse stakeholders regarding the Missouri River Recovery Program (MRRP). This opportunity is set aside for small businesses under NAICS 541611. The notice type is a Combined Synopsis/Solicitation, indicating that interested vendors should track the opportunity closely for updates rather than submitting formal bids at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
PERFORMANCE WORK STATEMENT (PWS)
MISSOURI RIVER RECOVERY IMPLEMENTATION COMMITTEE
CHAIR PROFESSIONAL SERVICES
US ARMY CORPS OF ENGINEERS (USACE)
MISSOURI RIVER RECOVERY PROGRAM (MRRP)
1.0 General Information.
1.1 Background. In 2006 at the request of USACE and other agencies in the Basin, the U.S. Institute for Conflict
Resolution conducted a situation assessment regarding the feasibility of a collaborative forum in the Missouri River
Basin to advise the agencies on species recovery issues and their impacts to Basin interests. Based on the findings of
the assessment, USACE and other federal agencies in the Basin asked the U.S. Institute to convene a multi-party
stakeholder group to develop a charter for such a group. The charter drafting process began in 2007 and the final
charter for MRRIC was approved by USACE in July 2008 and is available at
https://www.nwo.usace.army.mil/mrrp/mrric/.
The Missouri River Recovery Implementation Committee (MRRIC) was authorized by Congress in Section 5018 of
the 2007 Water Resource Development Act (WRDA) to serve as a basin-wide collaborative forum to come together
and develop a shared vision and comprehensive plan for Missouri River recovery and mitigation plan. The MRRIC
is a Federal Advisory Committee Act (FACA)-exempt, multi-stakeholder body composed of representatives from
federal, state, and tribal agencies, and nongovernmental and local governmental stakeholder interests in the basin.
The MRRIC consensus-building process is a coordinated effort involving the USACE, U.S. Fish and Wildlife
Service (FWS), and the Contracted Committee Chair (Contractor/Chair), in addition to approximately 140
Committee members and their alternates.
The Chair’s primary role is to support the diverse Committee members in enabling members to articulate their
underlying interests and perspectives and formulate consensus-based recommendations to the lead agency, so that
the lead agency can make informed decisions with a full picture of basin-wide interests. The Chair should have
enough knowledge about the endangered and threatened species, and their Missouri River habitat needs to follow
technical discussions, and ensure MRRIC discussions are within the scope of the USACE Missouri River Recovery
Program (MRRP) and Section 5018 of the 2007 WRDA. At the same time, the Chair should demonstrate process-
oriented knowledge in order to partner with the meeting facilitators and lead agency and be familiar with multi-party
consensus building. The Chair should communicate this information in a manner that reinforces Committee
members (stakeholder, tribe, state, federal members) trust in the Chair’s ability to be an impartial leader, given that
Committee members have multiple views on management of the Missouri River.
The Chair should have personal, technical, and professional skills and abilities to maintain and bolster the trust in
the collaborative process that has been forged among the Committee members and between the Committee
members, lead agency, and the Chair.
1.2 Scope of Work. This is a services contract to provide MRRIC Chair professional services, in close
coordination with MRRIC, the lead agency, and one or more meeting facilitators. Services include supporting the
diverse Committee members as an impartial leader in enabling members to articulate their underlying interests
and perspectives and help the Committee formulate consensus-based recommendations to the lead agency as it
relates to the USACE MRRP and assist the USACE in planning and leading constructive MRRIC engagements.
This is a fixed priced, performance-based service contract where the government defines and measures desired
outcomes.
1.3 Period of Performance. The period of performance shall be for six (6) months from:
Date of award for a period of 6 months and two (2) three-month options.
1.4 Contractor Personnel
1.4.1 The contractor shall perform all work under this contract using the contractor’s own forces except as provided
in Paragraph 1.4.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractor’s
-- 1 of 9 --
2
own payroll.
1.4.2 Subcontracting. The contractor shall not subcontract any work without written approval of the Contracting
Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.
1.5 Quality Control
1.5.1 The contractor shall designate, in writing, an employee who shall serve as the contact for matters involving
quality and performance or nonperformance of the required work stated in this PWS. The employee(s) shall be
qualified and fully competent with full authority to act for, and on behalf of, the contractor as necessary to ensure that
the required work is performed in accordance with the standards contained herein. The contractor shall furnish the
above written designation to the Contracting Officer Representative (COR) no later than the first day of work. The
contractor shall include the name(s), address(s), and telephone number(s) of the responsible individual(s).
1.5.2 The Contracting Officer reserves the right to disapprove any individual whom he considers incompetent to
perform the work required. The Contracting Officer will provide a written notice of any disapproval to the contractor.
1.6 Quality Assurance. The government will utilize the methods stated in Section 6 of the PWS to ensure that the
Contractor is performing the services required by this PWS in an acceptable manner. The Government may use Quality
Assurance Evaluators (QAE(s)) to provide assistance with the quality assurance methods.
1.6.1 The government has the right to inspect all services called for by the contract, to the extent practicable at all
times and places during the term of the contract. The government shall perform inspections in a manner that will not
delay the work.
1.6.2 If any of the services do not conform to contract requirements, the government may require the contractor to
perform the servic…