SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP) Prescribed by: eSOP
4155.05-001
Sponsor: J3
REVISIONS
REV DESCRIPTION DATE APPROVED
ENERGY QAP C16.01 02/06/2026
C16.01 TURBINE FUEL, AVIATION (JP5) (DLA ENERGY FEB 2026)
National Stock Number: Product Nomenclature: DLA Energy Product Code:
9130-00-273-2379 Turbine Fuel, Aviation, JP-5 JP5
9130-01-499-9521 Turbine Fuel, Aviation, JP-5 (Bunker JP5
fuel overseas locations only)
(a) Product shall meet MIL-DTL-5624X, Turbine Fuel, Aviation, Grade JP-5 (NATO F-44), dated February 12, 2024.
(b) SPECIFICATION MODIFICATION: The requirements of Table I in the specification are modified as follows:
(1) PROPERTIES:
(i) Conformance to specification requirements at the custody transfer point is required, however, prior to shipment, a laboratory hand
blend of JP-5 fuel with all additives required by this contract shall be tested to verify compliance with the required specification (except for Micro-
Separometer (MSEP)). MSEP analysis shall be performed per the Contractor's election in MIL-DTL-5624X, dated February 12, 2024.
(2) SYNTHETIC BLEND COMPONENT (SBC) and CO-HYDROPROCESSED SYNTHESIZED KEROSENE:
(i) If a fuel containing an SBC or a co-hydroprocessed synthesized kerosene is being offered, notification shall be made to the
contracting point of contact with submission of relevant details regarding the blend percentage and which Annex of ASTM D7566 for the SBC
used, and which feedstocks and co-processing percentage for co-hydroprocessed synthesized kerosene. Only SBCs approved in ASTM D7566,
MIL-DTL-83133L, MIL-DTL-5624X, and co-hydroprocessed synthesized kerosene produced from approved feedstock and percentage in ASTM
D1655, MIL-DTL-83133L, and MIL-DTL-5624X shall be acceptable to the government
(3) TEST MODIFICATIONS:
(i) Filtration Testing: Round upwards when reporting the filtration time, in minutes. For example, a filtration time of 4 minutes, 22
seconds, would be reported as 5 minutes.
(ii) Flash Point Testing: The referee procedure for performing flash point testing of JP-5 shall be the manual method of the latest
revision of ASTM D93, as opposed to the automated version of ASTM D93.
(iii) Micro-Separometer Testing:
(A) Prior to initial production under this contract, the Contractor shall elect, on a one-time basis, which MSEP limit to meet for the
balance of the contract. If the Contractor introduces Fuel System Icing Inhibitor (FSII) and/or Corrosion Inhibitor/Lubricity Improver (CI/LI) after
verification of product conformance with the MSEP requirement, the product is not required to meet a fixed limit on subsequent MSEP tests. This
process will be repeated if the composition of the fuel changes due to changes in processing or blending operations.
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
DEFENSE LOGISTICS AGENCY, ENERGY
8725 JOHN J. KINGMAN RD
FORT BELVOIR, VIRGINIA 22060-6222
DISTRIBUTION
STATEMENT - A
APPROVED FOR
PUBLIC RELEASE
DISTRIBUTION IS
"UNLIMITED"
PREPARED BY DATE
2/10/2026
ITEM
C16.01 TURBINE FUEL, AVIATION (JP5)
REVIEWED BY DATE
02/10/2026
NSN
MULTIPLE
CODE ID NO.
52838
APPROVED BY DATE
02/10/2026
SIZE
A
SCALE
1:1
DRAWING NUMBER
MACLANE.SKYLLAR.BRYA
NNA.1252141827
Digitally signed by
MACLANE.SKYLLAR.BRYANNA.1252141827
Date: 2026.02.10 06:37:51 -05'00'
NICHOLS.MATTHEW.STEP
HEN.1267972229
Digitally signed by
NICHOLS.MATTHEW.STEPHEN.1267972229
Date: 2026.02.10 06:41:24 -05'00'
BANISZEWSKI.DANIEL.J.12
87388698
Digitally signed by
BANISZEWSKI.DANIEL.J.1287388698
Date: 2026.02.10 08:57:50 -07'00'
-- 4 of 27 --
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP) Prescribed by: eSOP
4155.05-001
Sponsor: J3
REVISIONS
REV DESCRIPTION DATE APPROVED
ENERGY QAP C16.01 02/06/2026
(4) LOCATION:
(i) All batches of JP-5 that are presented for Government acceptance at origin and for subsequent shipment through a multiproduct
pipeline, shall meet a minimum flash point requirement of 62.5°C. This requirement is meant to address multiproduct commercial pipelines and
does not apply to multiproduct systems within a facility.
(ii) In the U.S. all JP-5 deliveries in California, Oregon, Washington, and Alaska shall have a minimum Flash Point of 62.5oC at the
custody transfer point.
(iii) All JP-5 procured for delivery to Australia shall have a minimum Flash Point of 61.5°C at the origin custody transfer point.
(iv) For JP-5 delivered to Kodiak Island, Alaska, the maximum total acid number shall be 0.020 mg KOH/g.
(v) For the deep freeze program, for Antarctic operations of the Department of Defense and other federal agencies; whereby JP-5 sulfur
content shall not exceed 0.0015 mass-percent (15 ppm).
(c) ADDITIVES: Additives are required for deliveries of JP-5, per MIL-DTL-5624X, dated February 12, 2024, unless addition is excluded by
specific solicitation line item, applicable contract clause, or another contractual requirement.
(1) FSII included in jet fuel shall conform to MIL-DTL- 85470C, Inhibitor, Icing, Fuel System, High Flash, dated March 5, 2024. The CI/LI
additive(s) used shall conform to MIL-PRF-25017H Inhibitor, Corrosion/Lubricity Improver, Fuel Soluble, w/Amendment 1, dated August 4, 2011,
and revalidated May 25, 2021.
(2) Line injection of additives (FSII and CI/LI) from shipping tank to delivery conveyance or other free on board (FOB) point is permitted
under the following conditions:
(i) Additives must be proportionately injected throughout the entire loading process to ensure the additive is homogeneously blended into
the jet fuel. The Contractor shall maintain records evidencing the homogeneous blending of al…