The Department of Agriculture is seeking a contractor to sand, repair, and refinish approximately 1,500 square feet of maple wood flooring at the Mondeaux Lodge in Westboro, WI. This opportunity is set aside for small businesses, making it suitable for those in the flooring or construction sectors. As a solicitation notice, interested contractors should prepare to submit bids rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK (SOW)
Maple Floor Sanding and Refinishing
Mondeaux Lodge – Main Lodge & Quarters Building
W7969 Park Rd
Westboro, WI 54490
1. Project Overview
The purpose of this project is to sand, repair, and refinish existing maple wood flooring at the
Mondeaux Lodge, including both the Main Lodge and the Quarters Building. The total project area
is approximately 1,500 square feet.
2. Scope of Work
The contractor shall provide all labor, equipment, tools, and incidental materials necessary to
complete the following:
2.1 Surface preparation
Inspect all flooring surfaces prior to work
Remove minor surface contaminants (adhesive, dirt, etc.) as needed.
Set and secure any protruding fasteners.
Protect adjacent surfaces, trim, walls, fixtures, and furnishings.
2.2 Baseboard and Trim Removal
Contractor shall carefully remove all baseboards and associated trim necessary to
allow full sanding and finishing of flooring to the wall line.
All removed materials shall be labeled, protected, and stored for reinstallation.
Contractor shall reinstall all baseboards and trim upon completion of floor finishing.
Reinstallation shall include fastening, minor repairs, and caulking as needed to
restore original appearance.
Any damaged trim shall be repaired or replaced to match existing at no additional
cost to the Government.
Contractor shall take care to minimize damage to adjacent wall surfaces during
removal and reinstallation.
2.3 Sanding
Sand all maple flooring to bare wood using industry-standard multi-step sanding
process.
Progress through appropriate grit sequence to achieve a smooth, uniform surface.
Edge sand and detail all perimeter areas and corners.
Remove all sanding dust between passes.
2.4 Repairs and Filling
Apply wood filler (Bona Pacific Filler provided by the Government) to fill gaps,
cracks, and minor surface defects.
Allow filler to cure and sand smooth to match surrounding surface.
2.5 Finishing system
Apply finish system using manufacturer-recommended methods and coverage
rates:
-- 1 of 3 --
o One (1) coat of Bona NaturalSeal
o Two (2) coats of Bona TraƯic HD Extra Matte
Lightly sand between coats as required for proper adhesion.
Ensure even application with no visible lap marks, streaks, or defects.
2.6 Cleanup
Remove all dust, debris, and materials generated by the work
Leave floors clean and ready for use upon cure time completion.
Properly dispose of waste materials oƯ-site in accordance with federal, state, and
local regulations.
3. Government-Furnishes Materials (GFM)
The Government will provide the following materials:
o 1 gallon Bona Pacific Filler
o 4 gallons Bona NaturalSeal
o 9 Gallons Bona TraƯic HD Extra Matte
The contractor shall be responsible for all additional materials required to complete the
project.
4. Quality Requirements
Finished floors shall have a uniform appearance with no visible sanding marks, chatter,
swirl marks, or debris in the finish.
Finish shall be free of bubbles, streaks, or uneven sheen.
Work shall meet manufacturer recommendations and industry standards for hardwood
floor refinishing.
Flooring shall be sanded and finished to the wall line with no visible edge transitions or
unfinished margins.
5. Schedule
Work shall be coordinated with the Government to minimize disruption to facility
operations.
Due to occupancy of the quarters building during the summer season, all work shall be
scheduled to occur during the fall of 2026, unless otherwise approved by the Government.
Contractor shall provide a proposed schedule prior to starting work
Adequate cure time shall be allowed between coats and prior to occupancy per
manufacturer recommendations.
6. Access and Site Conditions
The Government will provide access to both buildings during agreed-upon work hours.
Contractor shall verify site conditions and measurements prior to performing work.
Utilities (electric power) will be available on site.
7. Safety Requirements
Contractor shall comply with all applicable safety regulations.
Maintain a safe work environment and control dust to the greatest extent practicable.
Use appropriate ventilation when applying finishes.
-- 2 of 3 --
8. Acceptance
Work will be considered complete upon final inspection and acceptance by the
Government.
Any deficiencies identified shall be corrected by the contractor at no additional cost to the
Government.
Schedule of Items (SOI)
Item
No. Description Unit Qty Cost
1
Mobilization, site protection, baseboard
removal/reinstallation, and preparation
of existing maple flooring surfaces at the
Mondeaux Lodge Main Lodge and
Quarters Building.
LS 1
2
Sanding, filling, sealing, and application
of finish system on approximately 1,500
square feet of existing maple flooring,
including all labor, equipment, tools, and
incidental materials necessary to
complete the work in accordance with
the Statement of Work. The Government
will provide the following materials only:
1 gallon Bona Pacific Filler, 4 gallons
Bona NaturalSeal, and 9 gallons Bona
Traffic HD Extra Matte. The contractor
shall provide all additional materials
required to complete the project.
LS 1
3
Final cleanup, detailing, and disposal of
waste materials generated by the
project.
LS 1
TOTAL COST
-- 3 of 3 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238330)
B1000 Carpet Replacement
DEPT OF DEFENSE · Solicitation · due September 3, 2026
Minot AFB Flooring MACC FY26
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 24, 2026
Consular Waiting Room Carpet replacement
STATE, DEPARTMENT OF · Combined Synopsis/Solicitation · due September 14, 2026
JBER Chapel Flooring Replacement
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 25, 2026
BLDG. 380 – Carpet Replacement Sustainment Project
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 26, 2026
175th Wing MDANG Epoxy Floor Bldg. 3010 Warehouse
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due September 4, 2026