Skip to content

Open for responses

NEFSC - Milford Lab Main Building Structural Assessment and Temporary Shoring

COMMERCE, DEPARTMENT OF

Notice type
Sources Sought
Solicitation #
REQUIREMENTS-27-0637
NAICS
541330
PSC
C1AA
Posted
November 18, 2026
Response due
November 30, 2026
Place of performance
CT

Description

STATEMENT OF WORK Northeast Fisheries Science Center (NEFSC) Structural Assessment and Shoring Building # 1 Milford Laboratory 212 Rogers Ave, Milford, CT 06460 1. PURPOSE/OBJECTIVE Provide professional structural engineering services to evaluate multiple instances of observed structural distress within Building # 1 at the National Marine Fisheries Service (NMFS) Northeast Fisheries Science Center (NEFSC) Milford Lab in Milford, Connecticut. The Contractor will perform a comprehensive structural assessment, provide an inspection report, deliver a temporary shoring design using Government Furnished post shores, and implement a monitoring program. The objective of this work is to render safe the areas of concern with temporary shoring, and evaluate immediately adjacent areas of the structure to determine if adjacent areas are also in need of shoring. The assessment, design, and monitoring will be used to stabilize the immediate area, track ongoing movement, and inform future permanent repairs. 2. BACKGROUND The NEFSC Milford Laboratory Building 1 is a critical NOAA asset, serving as a leading center for sustainable aquaculture research. The research performed in Building 1 largely involves the use of seawater. Several instances of observed structural distress exist within the facility that require immediate engineering attention. It is suspected that long-term exposure to seawater has caused this degradation of the structure. Key localized areas of concern include: ● Room 16: The floor slab in Room 16 is showing advanced signs of distress, including surface delamination (indicated by hollow sounds upon impact), visible corrosion and rust stains, and concrete spalling. ● Room 24: Diagonal cracking is visible across the CMU partition walls, indicating potential structural movement or localized stress concentrations. 3. SITE LOCATION The NMFS NEFSC Milford Laboratory Building 1 is located at: 212 Rogers Ave Milford, Connecticut 06460 4. DESCRIPTION OF WORK The Contractor shall provide Engineering Services to complete a structural assessment and subsequent report to address the items outlined below. TASK 1: INITIAL DESKTOP REVIEW & ON-SITE VISUAL INVESTIGATION 1. Desktop Review: Review existing structural and architectural drawings to understand the building's -- 1 of 4 -- framing system and load paths. 2. Visual Investigation: Conduct a thorough visual and physical field investigation of the facility. The investigation must comprehensively evaluate all floors and areas of Building 1 to identify any other latent or secondary areas of structural distress; primary focus and concentrated effort shall be directed at Room 16 and Room 24. a. Where concrete delamination is suspected (specifically including, but not limited to, the floor slab in Room 16), the contractor shall utilize structural sounding methods to map the extent of the subsurface distress. Sounding shall be performed in accordance with Procedure B (Chain Drag) of ASTM D 4580 – Standard Practice for Measuring Delaminations in Concrete Bridge Decks by Sounding. TASK 2: STRUCTURAL ASSESSMENT REPORT i. Immediate Notification: Within one day of the completion of the inspection, the Contractor shall provide an email informing the Government of any major deficiencies that require immediate action. ii. Inspection Report: Provide an inspection report to include an overview of findings, photographic documentation, crack mapping, root-cause analysis, and conceptual long-term repair recommendations. 1. Document, measure, and map the orientation, length, and width of all wall cracks, slab delamination, spalling, and distress features identified in Rooms 16 and 24, as well as any new distress areas discovered elsewhere in the building. 2. Report to include recommended remediations for any deficiencies including cost estimates to be used for budgetary estimates (engineering opinions of cost). 3. Draft report to be delivered within 21 calendar days of the completion of the inspection. NOAA will review and provide comments within 7 calendar days. 4. Provide final report within 7 calendar days after receiving NOAA comments. TASK 3: TEMPORARY SHORING & INSTALLATION 1. Shoring Design: Provide a temporary shoring design for all distressed areas determined to require stabilization based on the findings of the on-site Building 1 visual inspection. The shoring is to remain in place for approximately 24 months to allow for funding to arrive for a future structural repair project. a. Determine the required spacing, placement, layout, and structural load paths for the post shores across all affected areas. Design any necessary sill plates, headers, or temporary lateral bracing required to safely transfer loads to the floor structures below without causing secondary damage or overloading adjacent members. The layout shall consider the location and layout of existing scientific equipment and ongoing research. b. The design shall utilize Government Furnished post shores. i. Shoring Post Specifications: ● Model: Fourteen (14) SureBuilt Standard Post Shore 350 (SBPS350). The height range is 6’6” to 11’5” ● Load Rating: 6445 lbs down to 4,400 lbs (depending on the extended height.) c. Provide engineering calculations justifying the shoring design for each identified area, based on the manufacturer specifications and allowable capacities of the provided GFP/GFE. d. Drawings and calculations to be stamped by a professional engineer licensed in the state of Connecticut. 2. Shoring Installation: Supply all necessary supplemental materials (lumber for sill plates/headers, bracing, fasteners, etc) and labor to safely and completely install the temporary shoring system in accordance with the stamped engineering drawings and OSHA regulations. TASK 4: STRUCTURAL MONITORING & MAINTENANCE -- 2 of 4 -- 1. Monitoring Plan & Submission: Develop and submit a proposed structural monitoring program for NOAA review and approval at least two (2) weeks prior to th…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 541330