Open for responses
NEFSC - Milford Lab Main Building Structural Assessment and Temporary Shoring
COMMERCE, DEPARTMENT OF
Notice type
Sources Sought
Solicitation #
REQUIREMENTS-27-0637
NAICS
541330
PSC
C1AA
Posted
November 18, 2026
Response due
November 30, 2026
Place of performance
CT
Description
STATEMENT OF WORK
Northeast Fisheries Science Center (NEFSC)
Structural Assessment and Shoring Building # 1
Milford Laboratory
212 Rogers Ave, Milford, CT 06460
1. PURPOSE/OBJECTIVE
Provide professional structural engineering services to evaluate multiple instances of observed structural distress
within Building # 1 at the National Marine Fisheries Service (NMFS) Northeast Fisheries Science Center (NEFSC)
Milford Lab in Milford, Connecticut. The Contractor will perform a comprehensive structural assessment, provide
an inspection report, deliver a temporary shoring design using Government Furnished post shores, and implement a
monitoring program. The objective of this work is to render safe the areas of concern with temporary shoring, and
evaluate immediately adjacent areas of the structure to determine if adjacent areas are also in need of shoring.
The assessment, design, and monitoring will be used to stabilize the immediate area, track ongoing movement, and
inform future permanent repairs.
2. BACKGROUND
The NEFSC Milford Laboratory Building 1 is a critical NOAA asset, serving as a leading center for sustainable
aquaculture research. The research performed in Building 1 largely involves the use of seawater.
Several instances of observed structural distress exist within the facility that require immediate engineering
attention. It is suspected that long-term exposure to seawater has caused this degradation of the structure.
Key localized areas of concern include:
● Room 16: The floor slab in Room 16 is showing advanced signs of distress, including surface delamination
(indicated by hollow sounds upon impact), visible corrosion and rust stains, and concrete spalling.
● Room 24: Diagonal cracking is visible across the CMU partition walls, indicating potential structural
movement or localized stress concentrations.
3. SITE LOCATION
The NMFS NEFSC Milford Laboratory Building 1 is located at:
212 Rogers Ave
Milford, Connecticut 06460
4. DESCRIPTION OF WORK
The Contractor shall provide Engineering Services to complete a structural assessment and subsequent report to
address the items outlined below.
TASK 1: INITIAL DESKTOP REVIEW & ON-SITE VISUAL INVESTIGATION
1. Desktop Review: Review existing structural and architectural drawings to understand the building's
-- 1 of 4 --
framing system and load paths.
2. Visual Investigation: Conduct a thorough visual and physical field investigation of the facility. The
investigation must comprehensively evaluate all floors and areas of Building 1 to identify any other latent
or secondary areas of structural distress; primary focus and concentrated effort shall be directed at Room
16 and Room 24.
a. Where concrete delamination is suspected (specifically including, but not limited to, the floor slab in
Room 16), the contractor shall utilize structural sounding methods to map the extent of the subsurface
distress. Sounding shall be performed in accordance with Procedure B (Chain Drag) of ASTM D 4580
– Standard Practice for Measuring Delaminations in Concrete Bridge Decks by Sounding.
TASK 2: STRUCTURAL ASSESSMENT REPORT
i. Immediate Notification: Within one day of the completion of the inspection, the Contractor shall
provide an email informing the Government of any major deficiencies that require immediate action.
ii. Inspection Report: Provide an inspection report to include an overview of findings, photographic
documentation, crack mapping, root-cause analysis, and conceptual long-term repair recommendations.
1. Document, measure, and map the orientation, length, and width of all wall cracks, slab delamination,
spalling, and distress features identified in Rooms 16 and 24, as well as any new distress areas
discovered elsewhere in the building.
2. Report to include recommended remediations for any deficiencies including cost estimates to be
used for budgetary estimates (engineering opinions of cost).
3. Draft report to be delivered within 21 calendar days of the completion of the inspection. NOAA will
review and provide comments within 7 calendar days.
4. Provide final report within 7 calendar days after receiving NOAA comments.
TASK 3: TEMPORARY SHORING & INSTALLATION
1. Shoring Design: Provide a temporary shoring design for all distressed areas determined to require
stabilization based on the findings of the on-site Building 1 visual inspection. The shoring is to remain in
place for approximately 24 months to allow for funding to arrive for a future structural repair project.
a. Determine the required spacing, placement, layout, and structural load paths for the post shores
across all affected areas. Design any necessary sill plates, headers, or temporary lateral bracing
required to safely transfer loads to the floor structures below without causing secondary damage or
overloading adjacent members. The layout shall consider the location and layout of existing
scientific equipment and ongoing research.
b. The design shall utilize Government Furnished post shores.
i. Shoring Post Specifications:
● Model: Fourteen (14) SureBuilt Standard Post Shore 350 (SBPS350). The height
range is 6’6” to 11’5”
● Load Rating: 6445 lbs down to 4,400 lbs (depending on the extended height.)
c. Provide engineering calculations justifying the shoring design for each identified area, based on the
manufacturer specifications and allowable capacities of the provided GFP/GFE.
d. Drawings and calculations to be stamped by a professional engineer licensed in the state of
Connecticut.
2. Shoring Installation: Supply all necessary supplemental materials (lumber for sill plates/headers,
bracing, fasteners, etc) and labor to safely and completely install the temporary shoring system in
accordance with the stamped engineering drawings and OSHA regulations.
TASK 4: STRUCTURAL MONITORING & MAINTENANCE
-- 2 of 4 --
1. Monitoring Plan & Submission: Develop and submit a proposed structural monitoring program for
NOAA review and approval at least two (2) weeks prior to th…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 541330
Steam Turbine Generator Governor System Replacement
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 25, 2026
B Department Operations Support
DEPT OF DEFENSE · Solicitation · due December 18, 2026
SOLICITATION NUMBER 391454 “HAZARDOUS AREA CLASSIFICATION REVIEW AND TRAINING SUPPORT”
ENERGY, DEPARTMENT OF · Sources Sought · due December 3, 2026
Spectrum Engineering Technical Support Services
DEPT OF DEFENSE · Sources Sought · due December 2, 2026
Governor Control Programming
DEPT OF DEFENSE · Solicitation · due November 25, 2026
R--Professional Services for Construction Management Support
INTERIOR, DEPARTMENT OF THE · Sources Sought · due December 4, 2026