What this opportunity is
The Department of State is seeking a contractor for the delivery and installation of doors at the American Embassy in Vienna, under NAICS code 238350. This solicitation is suitable for small businesses specializing in door and security door installation. Interested bidders should note that the notice type is a solicitation, indicating that they will need to prepare a formal bid to compete for the contract. Compliance with applicable Austrian standards is required for this project.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
7/7/2026
American Embassy Vienna
Leistungsverzeichnis/Tender Specification
Bauvorhaben/Project: Hartaeckerstrasse 77/4, 1190 Wien
Gewerk/Trade: Fachbetrieb Tueren und Sicherheitstueren/Doors and Security doors
SENSITIVE BUT UNCLASSIFIED Page 1 of 9
ALLGEMEINE BESTIMMUNGEN
GENERAL REMARKS
Allgemeine Vorbemerkungen
General preliminary comments
1. Leistungsumfang
Dieses Leistungsverzeichnis umfasst die Lieferung und Montage von Tueren im Objekt
Hartaeckerstrasse 77/4, 1190 Wien.
Scope of work
This tender specification covers the delivery and the installation of doors at the property
Hartaeckerstrasse 77/4, 1190 Vienna.
2. Reihenfolge der Gültigkeit
Die Vertragsunterlagen gelten in folgender Reihenfolge:
• Auftragsschreiben
• Text des Leistungsverzeichnisses (Allgemeine und technische Bestimmungen vor
Leistungsbeschreibung)
• Grundriss Skizzen
Sequence of Applicability
Contract documents apply in the following sequence:
• Written order (purchase order or contract)
• Text of the Tender Specifications (General remarks and technical comments before
specifications)
• Floorplan
3. Gültigkeit der Normen
Für dieses Projekt gelten die fachtechnischen ÖNORMEN in der zum Zeitpunkt der Auftragserteilung
gültigen Fassung.
Validity of the standards
For this project the specialist technical AUSTRIAN STANDARDS are applicable in the version stated at
the time of awarding the contract.
4. Vorbehalte – Änderungen – Alternativen
Insoferne der Bieter Vorbehalte, Änderungen oder Alternativen zum Leistungsverzeichnis vorbringen
möchte, sind diese in einem Begleitschreiben zum Angebot beizulegen. Die neue Schlusssumme muss
sich aus dem begleitenden Schreiben bei der Eröffnung sofort erkennen lassen.
Für gleichartige Anlagenteile, bei denen Fabrikat und Type freigestellt sind, sind einheitliche Fabrikate
anzubieten um die Ersatzteilhaltung und Wartung zu vereinfachen.
Reservations – Modifications – Alternatives
Insofar as the bidder wishes to present reservations, modifications or alternatives to the performance
specification, these are to be enclosed in an accompanying letter to the quotation.
The new final sum must be immediately evident on opening the enclosed letter.
For similar type plant parts, for which brand and type are optional, uniform brands are to be offered in
order to simplify the storage of spare parts and maintenance.
5. Ausführungsfristen
Für die Erbringung der dem Auftragnehmer übertragenen Leistungen gelten die vereinbarten
Ausführungsfristen.
Ausfuehrungstermin: Sept. 2026
Sollten sich aus Gründen, die der Auftragnehmer zu vertreten hat, Verschiebungen von Terminen
ergeben, so ist ein neuer Terminplan zu erstellen. Die neuen Fristen erlangen nach ihrer Bekanntgabe
durch den Auftraggeber die gleiche Rechtswirksamkeit wie die ursprünglich vereinbarten Termine.
-- 1 of 9 --
7/7/2026
American Embassy Vienna
Leistungsverzeichnis/Tender Specification
Bauvorhaben/Project: Hartaeckerstrasse 77/4, 1190 Wien
Gewerk/Trade: Fachbetrieb Tueren und Sicherheitstueren/Doors and Security doors
SENSITIVE BUT UNCLASSIFIED Page 2 of 9
Execution periods
For completion of the work given to the contractor, the agreed execution periods apply.
Dates for carrying out work: Sept 2026
If, for reasons which the contractor has to justify - deadlines are postponed then a new schedule is to be
drawn up. After their announcement these new periods acquire the same legal effectiveness as the
originally agreed deadlines.
6. Vertragsgrundlagen
Im Falle einer Beauftragung finden die vertragsrechtlichen Bedingungen der U.S. Regierung
Anwendung.
Im Detail können diese Bestimmungen bei der ausschreibenden Stelle der Einkaufs- und
Vertragsabteilung (Procurement / Contracting Office) der U.S. Botschaft eingesehen warden.
Etwaige eigene Lieferbedingungen des Bieters werden für die Erfüllung des Vertrages nicht anerkannt.
Basics of contract
In the event of being appointed to do the work, the legal contract provisions of the U.S. Government
apply.
In detail these provisions can be seen or requested at the Procurement / Contracting Office of the U.S.
Embassy.
Any supply requirements of the bidder himself are not recognized for the fulfillment of this contract.
7. Schadenersatz
Bei Nichteinhaltung der vereinbarten Termine ist der Auftraggeber berechtigt, Schadenersatzansprüche
(“Liquidated Damages”) entsprechend den vertragsrechtlichen Bestimmungen geltend zu machen.
Compensation, Liquidated damages
If the agreed deadlines are not met, the client is entitled to enforce compensation claims (“Liquidated
Damages”) in accordance with the legal contractual requirements.
8. Gewährleistung, Mängel
Der Auftragnehmer haftet für die einwandfreie Ausführung der gewöhnlich vorausgesetzten und
vertraglich bedungenen Leistungserbringung sowie für die einwandfreie Beschaffenheit aller von ihm
verwendeten Baustoffe und Materialien. Werden vom Auftraggeber Materialien beigestellt, so hat der
Auftragnehmer sie auf ihre Tauglichkeit zu prüfen.
Die Gewährleistungsfrist beträgt 3 Jahre und beginnt mit dem Tag der Übernahme der Leistung durch
den Auftraggeber. Innerhalb der Gewährleistungsfrist sind aufgetretene Mängel sowie etwaige
Mangelfolgeschäden unverzüglich, längstens jedoch 14 Tage nach Aufforderung zu beheben. Bei
Gefahr in Verzug ist die Mängelbehebung sofort durchzuführen. Wird einer diesbezüglichen
Aufforderung nicht Folge geleistet, steht dem Auftraggeber das Recht zu, diese Mängel durch Dritte auf
Kosten und Gefahr des Auftragnehmers beheben zu lassen.
Warranty, Defects
The contractor is liable for perfect execution of the normal presupposed and contractually necessitated
work as well as for the perfect quality of all constructional substances and materials which are used by
him. If materials are provided by the client, the contractor has to check then for suitability.
The warranty period is 3 years and begins with the day of final acceptance of work by the Site Manager.
Within the guarantee period, faults which arise – as well as …