The Department of Transportation is seeking contractors for the Grant County Bridges Project in New Mexico, which involves the reconstruction of three bridges and a concrete box culvert along State Route 35. This opportunity is open to all businesses, with a HUBZone price preference, and is categorized under NAICS 237310. As this is a presolicitation notice, interested parties should monitor for future bidding opportunities rather than submitting proposals at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE
PROJECT NUMBER: NM FLAP SR35(1)
PROJECT NAME: GRANT COUNTY BRIDGES
SET- ASIDE: FULL AND OPEN Competition with HUBZone Price Preference
PROJECT DESCRIPTION:
The Grant County Bridges Project is located near Mimbres, New Mexico, in Grant County, along State Route (SR) 35. SR 35 serves as a 27‑mile highway providing access to the Gila National Forest, connecting SR 15 in Silver City to SR 152 in Mimbres.
The proposed improvements include work at four locations along SR 35:
Bridge 1330 — Milepost (MP) 0.5
Concrete box culvert — MP 4.65
Bridge 1873 — MP 5.2
Bridge 1876 — MP 8.42
SCOPE OF THE WORK:
The project includes reconstruction of three bridges and a concrete box culvert. Improvements would provide reliable and safe access to the Gila National Forest for local and regional travelers. Improvements to these structures would also benefit travelers by accessing residential and commercial properties along SR 35.
Schedule A includes:
The project includes demolition of the existing bridge and construction of three (3) new simple-span, precast, prestressed concrete bridges: an 80‑ft simple span with precast prestressed I‑girders and a cast‑in‑place reinforced concrete deck; a skewed 55‑ft‑6‑in simple span using precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay; and a 36‑ft simple span using precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay.
Bridge 1, a 80‑ft simple span: precast, prestressed I‑girders with a cast‑in‑place reinforced concrete deck.
Bridge 2, a 55‑ft‑6‑in skewed simple span: precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay.
Bridge 3, 36‑ft simple span: precast, prestressed voided slabs with a cast‑in‑place (CIP) concrete overlay.
Option X includes:
The work consists of removing an existing open-bottom concrete box culvert and replacing it with a 10‑ft by 5‑ft reinforced concrete box culvert.
PRINCIPAL WORK ITEMS:
Schedule A
Removal of Bridge
484 Cuyd of Structural Concrete
707 LNFT of Precast, prestressed concrete slabs 48 inch voided (15” and 18”)
80,900 LB of reinforced steel epoxy coated
511 LNFT Bridge railing steel
800 LNFT drilled shaft 30 inches.
40 weeks of Temporary Traffic control flagger and Traffic Control Supervisor
Option X
2 Each Concrete headwall (including wing walls)
60 LNFT, 10 ft span, 5 ft rise precast reinforced box culvert
5 weeks of Traffic Control Supervisor
ESTIMATED COST RANGE: The estimated price range is between $10,000,000 and $20,000,000.
ITEMS WORTH NOTING:
Construction in Mimbres can be maintained through all seasons, but you must factor in cold-weather provisions for the winter months to ensure the integrity and quality of critical bridge and culvert materials like concrete and sealants.