Notice of Intent to Single Source: VICADS Phase II, Minot AFB, ND

DEPT OF DEFENSE

Notice type
Presolicitation
Solicitation #
FA452827NCS01
NAICS
561621
PSC
6350
Set-aside
Small Business Set Aside - Total
Posted
November 24, 2026
Response due
December 9, 2026
Place of performance
ND

Description

STATEMENT OF WORK (SOW) FOR 5 SFS Remote Perimeter Camera(s) Upgrade Services (5 MSG) “Project Vigilance Phase II” MINOT AIR FORCE BASE NORTH DAKOTA Prepared by: 5th Security Forces Squadron Technology and Innovation Section Minot Air Force Base, North Dakota Version 2.2 Date: 11 Aug 2026 -- 1 of 18 -- Page 2 of 18 Table of Contents 1. OVERVIEW .............................................................................................................. 3 2. LOCATION ............................................................................................................... 3 3. BACKGROUND........................................................................................................ 5 4. GENERAL REQUIREMENTS.................................................................................. 6 5. SCOPE ....................................................................................................................... 9 6. PERIOD OF PERFORMANCE (PoP) ..................................................................... 11 7. OPERATING CONSTRAINTS ............................................................................... 11 8. WARRANTY ........................................................................................................... 12 9. OTHER APPLICABLE CONDITIONS .................................................................. 12 ATTACHMENT 1 ............................................................................................................ 16 -- 2 of 18 -- Page 3 of 18 STATEMENT OF WORK (SOW)/ SCOPE OF WORK / GENERAL REQUIREMENTS 1. OVERVIEW/DESCRIPITION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform video management system and camera install services at Minot Air Force Base (AFB), The government will provide power and dark fiber (non-NIPR/non-AFnet) communications to the locations outlined in this SOW. Contractor shall install cameras and video management services in Minot AFB North Dakota, in accordance with all applicable federal, state, local laws and regulations and this statement of work (SOW) only covers and explains Phase II of a multi-phase project. 2. LOCATION. 2.1. Within Minot AFB to provide video surveillance capabilities at: Bldg. 547/5 SFS Confinement, Bldg. 197/Magic City Gate, Bldg. 1014/Minot Gate. Replace existing exterior IP Pan, Tilt, Zoom (PTZ) camera with Bosh MIC IP 9000I, like, or better camera in accordance with the Air Force published Configuration Management Database (CMD) at Bldg. 1034/Air Traffic Control (ATC) Tower. Install removed IP PTZ from Bldg. 1034/ATC Tower on Bldg. 837/Hangar 5. 2.1.1. Monitored viewing capability of locations must occur at Building 547/Central Security Control, Building 547/Confinement, Bldg. 768/Maintenance Operations Center, and recording capability must occur at Bldg. 547/Central Security Control using previously Phase I installed V100 Server. Recording capability of 30 days or more must occur at Bldg. 547/Confinement in accordance with higher headquarters guidance. 2.1.2. Effective communication and sufficient connectivity are required for all locations. For real time or near-real time visual observations. Contractor shall use dark fiber (non-NIPR/non-AFnet) infrastructure at all locations and provide all required network Air Force Approved Products List (APL) compliant switches, LC-LC, SC- LC, ST-LC, 10G SFPs and RJ-45 cables to directly connect the system to cameras via Fiber cable and any miscellaneous connectors required for installation not previously referenced by this SOW. 2.2. Place of performance may include other locations to ensure system connectivity and functionality. 2.2.1. Contractor shall remove installed CCTV Network Switch from communications room in Bldg. 1142 and reinstall CCTV Network Switch outside of the communications room via a contractor furnished wall mount switch cabinet with capability to be locked via key or combination. 2.2.1.1. 5 CS shall run dark fiber from network switch in Bldg. 1142 to an communications room exterior demarcation point ensuring fiber connectivity from Bldg. 1142 communications room to exterior CCTV -- 3 of 18 -- Page 4 of 18 Network switch enclosure. 5 CS shall enclose fiber in hardened conduit from communications room to exterior CCTV Network switch to maintain physical and cyber security requirements of the closed network. 2.2.2. Contractor shall remove installed CCTV Network Switch from communications room in Bldg. 1034 and reinstall CCTV Network Switch outside of the communications room via a contractor provided wall mount switch cabinet with capability to be locked via key or combination. 2.2.2.1. 5 CS shall run dark fiber from network switch in Bldg. 1034 to an communications room exterior demarcation point ensuring fiber connectivity from Bldg. 1034 communications room to exterior CCTV Network switch enclosure. 5 CS shall enclose fiber in hardened conduit from communications room to exterior CCTV Network switch to maintain physical and cyber security requirements of the closed network. 2.2.3. Contractor shall remove installed CCTV Network Switch from communications room in Bldg. 718 and reinstall CCTV Network Switch outside of the communications room via a contractor provided wall mount switch cabinet with capability to be locked via key or combination. 2.2.3.1. 5 CS shall run dark fiber from network switch in Bldg. 718 to an communications room exterior demarcation point ensuring fiber connectivity from Bldg. 718 communications room to exterior CCTV Network switch enclosure. 5 CS shall enclose fiber in hardened conduit from communications room to exterior CCTV Network switch to maintain physical and cyber security requirements of the closed network. 2.2.4. Contractor shall remove installed CCTV Network Switch from communications room in Bldg. 475 and reinstall CCTV Network Switch outside of the communications room via a contractor …

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 561621