Description
1
Performance Work Statement (PWS)
Total Maintenance Contract, Okinawa.
1. General Information and Scope of Work.
1.1. Agency. The Department of Defense Education Activity (DoDEA), as one of only two Federally operated
school systems, is responsible for planning, directing, coordinating, and managing prekindergarten through 12th grade
educational programs on behalf of the Department of Defense (DoD). DoDEA is globally positioned, operating 165
brick-and-mortar schools in 8 districts located in 7 states, 11 foreign countries, Guam, and Puerto Rico. DoDEA
employs over 8,000 educators who serve more than 72,000 children. DoDEA also has a fully accredited virtual high
school located in Virginia with teaching hubs in Europe and the Pacific.
The Department of Defense Education Activity (DoDEA) Pacific South District (Okinawa) is composed of thirteen
schools, the District Superintendent’s Office (DSO), the Student Transportation Office (STO) and the DoDEA Pacific
(PAC) Region facilities. DoDEA instructional program provides a comprehensive prekindergarten through 12th grade
curriculum that is dedicated to attaining the highest student achievement for children of active-duty military and
eligible civilian employees.
Background. The following maintenance services are required to maintain a safe, healthy, and sanitary school
environment for faculty and students within the Department of Defense Education Activity (DoDEA) Pacific South
District (Okinawa). The contractor shall provide all management, tools, equipment, labor, and transportation necessary
to ensure that maintenance services are performed in accordance with the objectives and standards outlined within this
Performance Work Statement (PWS). Therefore, this requirement calls for the continuous efforts on the part of the
contractor to ensure appropriate safety and functionality of facilities are maintained throughout the life of the contract.
Scope of Work. The contractor shall provide all personnel, labor, equipment, tools, vehicles, travel, materials,
supervision, subcontracts, other items/services necessary to perform all operations, maintenance, repair and facility
management support tasks and functions for DoDEA facilities as defined in the PWS at the Pacific South District
Okinawa, Japan. Work shall be performed, and documentation shall be maintained to the standards set forth in this
contract, the National Fire Protection Association (NFPA), and all other applicable codes and regulations to ensure full
compliance with the applicable codes and standards. The contractor will be required to provide and manage a full-
service Facilities Operations and Maintenance Program (FOMP) for the Pacific South District (Okinawa). The major
elements of the services required include:
1. Facility Maintenance
2. Grounds Maintenance Services and Sports Fields Maintenance
3. Playgrounds Maintenance
4. Non-routine Work Requests
2. Requirements & Objectives. The contractor is expected to develop the total solution for meeting all the
following requirements and objectives in accordance with a performance-based approach.
The government reserves the right to incorporate the winning offeror’s proposed technical response into the contract.
2.1 Facilities Operations & Maintenance Program (Objective 1)
The processes and activities required to keep equipment, machinery, and facilities in good working condition. FOMP
encompasses the process of maintenance, repair, replacement of parts, and other related activities including any system
related to civil, structural, mechanical, electrical, plumbing, sanitary, controls, fuels, and storm drainage. The objective
is to develop, maintain, sustain, and perform comprehensive facilities operations and maintenance program to preserve
the quality of facility equipment, real property installed, components and systems to manufacturer standards through
functional checks, inspections, adjustments, services, repairs, and/or replacements. The contractor shall submit a
FOMP to the Contracting Officer (KO) and Contracting Officer’s Representative (COR), in accordance with the
industry’s best practices while adhering to manufacturer’s guidelines. Each page shall be numbered and dated. The
submittal date shall be reflected on the title page, and all pages of each FOMP submittal shall reflect this date. After
government approval of the final submittal, any revised pages shall reflect the date that those pages were revised.
-- 1 of 50 --
2
Frequency. The Preventive Maintenance Plan (PMP) will determine how often the overall Facility Maintenance
objective should be carried out. The PMP shall establish the Contractor’s course of action for effectively and efficiently
meeting manufacture recommendations and standards, to include frequencies for proactively performing maintenance,
repairs, and replacements to prevent failures.
Performance Standard. Performance standard for services rendered under the Facility Maintenance objective is
based on adhering to the established performance frequencies. Deviation from adhering to the established performance
frequencies shall result in no more than five verified complaints per month.
The tasks listed below are provided to help the contractor in gaining a better understanding of the requirements to
successfully meet the objective. The tasks are not all inclusive as the contractor is expected to develop a total solution
for meeting all the requirements of the objective in accordance with a performance-based approach.
2.1.1 Routine Facility Maintenance. The objective is to provide routine facility maintenance services regarding
electrical, plumbing, storm drainage, sanitary, fuels controls, mechanical, civil, all-inclusive/related systems, and
structural disciplines in accordance with equipment and systems manufacturer recommendation via vigilant routine
inspections, adjustments, repairs, and corrective actions.
The objective includes performing, preventative maintenance, minor work/repairs, de…
Source: SAM.gov, as posted. Verify the current solicitation before responding.