What this opportunity is
NASA's Johnson Space Center is seeking to award a sole source contract to David Clark Company Incorporated for the Orion Crew Survival Systems Suit (OCSS) and related support hardware and repair services. This procurement, valued at approximately $15 million, is intended for the production of flight crew and backup suits for Artemis 3 and future missions, as well as for critical testing and training. This opportunity is not open for competitive bidding, making it suitable for businesses capable of meeting the specific requirements outlined in the justification document.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
4
Rev.: 10/2025
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Johnson Space Center (JSC)
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
(JOFOC)
For 80JSC026RSUITS
1. Federal Acquisition Regulation (FAR) 6.104-1(a)(1) – Identification of the agency and
the contracting activity, and specific identification of the document as a “Justification
for other than full and open competition.”
This document is a justification for other than full and open competition prepared by the
National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC).
The procuring agency is the NASA, and the contracting activity is JSC.
2. FAR 6.104-1(a)(2) – The nature and/or description of the action being approved:
This justification provides the rationale for contracting by other than full and open
competition to award a sole source contract to David Clark Company Incorporated (DCCI) of
Worcester, MA for the acquisition of Orion Crew Survival Systems’ Suit model S1041
(OCSS Suit) and accompanying support hardware. The effort will provide for production of
flight crew and backup flight crew suits, along with supporting suit hardware and repair
services, for Artemis 3 (A3) and subsequent flights. These items will also be used by the
Orion Crew Survival Systems team in critical integrated-system tests and flight crew
training. The detailed effort is specified in Statement of Work SOW-PRS22-2836. The total
value of this effort is estimated at $15M.
3. FAR 6.104-1(a)(3) – A description of the supplies or services required, to meet the
Agency’s needs (including the estimated value):
The supplies being procured to meet the Agency’s needs are the OCSS Suit and
accompanying support hardware and repair services. The effort will provide for production
of flight crew and backup flight crew suits, along with supporting suit hardware, for A3 and
subsequent flights. These items will also be used by the Orion Crew Survival Systems team
in critical integrated-system tests and flight crew training.
4. FAR 6.104-1(a)(4) – An identification of the statutory authority permitting other than
full and open competition:
The statutory authority permitting other than full and open competition is 10 U.S.C. 3204(a)
(1), as implemented by FAR 6.103-1 Only one responsible source and no other supplies or
services will satisfy agency requirements.
-- 1 of 5 --
5
Rev.:10/2025
5. FAR 6.104-1(a)(5) – A demonstration that the proposed contractor’s unique
qualifications or the nature of the acquisition requires use of the authority cited:
The rationale supporting the use of 10 U.S.C. 3204(a) (1), as implemented by FAR 6.103-1 is
only one responsible source and no other supplies or services will satisfy agency
requirements as described below.
The OCSS Suit is unparalleled in form, fit and function with unique qualification that meets
the rigorous requirements for Criticality 1 (Crit 1) life support equipment pressure suits. The
hardware is based on proprietary manufacturing techniques utilized by DCCI prior to being
chosen as the sole source supplier at the inception of the Shuttle Program. DCCI possesses all
fabrication drawings and patterns and has developed the unique manufacturing, test and
overhaul procedures related to this hardware.
Due to the unique Artemis missions requiring the Orion suit to be capable of 144 hours
outside the crew module and the thermal management capabilities associated with extended
space activities, DCCI is the only responsible source able to satisfy NASA’s requirements.
This ability to satisfy NASA’s requirements is attributable to DCCI’s proprietary intellectual
property (IP) regarding the materials and patterning techniques needed in order to produce
the qualified Orion suit. Intellectual property protections and Non-Disclosure Agreements
(NDAs) governing design similarity and suit‑specific manufacturing techniques prevent any
other space suit manufacturer from producing suits comparable to those qualified by DCCI.
Furthermore, no other space suit vendor has developed space suits capable of obtaining
NASA qualification to perform the same activities required by the Artemis missions. DCCI
has demonstrated its experience with this unique hardware including design and testing of the
components utilized in pressure suits by being the sole supplier of pressure suits for the
entirety of the space shuttle program.
Additionally, the OCSS suit is the only suit to have successfully completed the full
qualification efforts for compatibility with the Orion vehicle and the Artemis mission
requirements. Qualifying a similarly capable design from a newly identified alternate source
would require approximately three years, resulting in risks to the agency’s ability to meet the
anticipated launch date for the A3 and subsequent missions. Accelerating the qualification
period would elevate risks to astronaut health and safety by reducing the thoroughness of the
review and potentially allowing critical issues to go unidentified.
6. FAR 6.104-1(a)(6) – A description of the efforts made to ensure that offers are solicited
from as many potential sources as practicable, including whether a notice was or will be
publicized as required by part 5 and, if not, which exception under part 5 applies:
A notice to the Government Point of Entry (GPE) website (Sam.gov) was published on
April 22, 2026, in accordance with FAR part 5. This posting informed potential sources of
NASA’s intent to award this sole-source contract to DCCI. The results of this synopsis are
summarized in Section 10 below.
-- 2 of 5 --
6
Rev.:10/2025
7. FAR 6.104-1(a)(7) – A determination by the contracting officer that the anticipated cost
to the Government will be fair and reasonable:
The contracting officer’s signature on this document indicates that the contracting officer has
determined that the anticipated cost to the government will be fair and reasonable. The
contractor must be required to submit a proposal to be evaluated and negotiated by th…
Source: SAM.gov, as posted. Verify the current solicitation before responding.