What this opportunity is
The Department of Defense is seeking FAA-certificated parachute rigger personnel to provide packing, maintenance, inspection, and logistics support for the Tandem Offset Resupply Delivery System (TORDS) training at Yuma Proving Ground, Arizona. This opportunity is open to all businesses as there is no set-aside, making it suitable for small and large contractors alike. Interested vendors should note that this is a Sources Sought notice, indicating that the government is gathering information rather than soliciting bids at this time.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PERFORMANCE WORK STATEMENT (PWS)
Reconnaissance Training Company, Detachment Yuma Proving Ground
Advanced Mobile Training Team (AMTT), Advanced Infantry Training
Battalion
School of Infantry (West)
Tandem Offset Resupply Delivery System (TORDS) – Equipment/Personnel
Training Support
1. Background
Department of War units maintain a High-Altitude High-Opening (HAHO) and High-
Altitude Low-Opening (HALO) capability to enable elements of the organization to
clandestinely insert into areas of operation where adversaries employ advanced
anti-access/area-denial technologies. The primary method for personnel and
equipment to insert with maneuver or reconnaissance elements is the Tandem
Offset Resupply Delivery System (TORDS).
The United States Marine Corps has established the Advanced Mobile Training Team
(AMTT) to train qualified Military Free Fall (MFF) Marines and Soldiers across the
Department of War in the proper deployment and tactical employment of the
TORDS. As relevant to this acquisition, this training comprises of two distinct
curricula:
1. Tandem Offset Resupply Delivery System-Equipment (TORDS-E)
2. Tandem Offset Resupply Delivery System-Personnel (TORDS-P)
To be eligible for the TORDS-E course, a parachutist must have completed a
minimum of 100 MFF jumps with the Multi-Mission Parachute System (MMPS), the
Parachute System 2 (PS-2), or service-approved variants. To attend the TORDS-P
course, the parachutist must have completed a minimum of 200 MFF jumps with the
MMPS/PS-2 (or approved variant) and hold an active MFF Jumpmaster (MFFJM)
qualification.
The training continuum of the requesting unit and the organic capacity of military
parachute riggers cannot fulfill the high volume of required MFF jumps needed to
conduct TORDS-E/P certifying courses in a cost-effective and timely manner. The
AMTT deploys throughout the United States to conduct TORDS-E/P courses lasting
up to 21 training days. Students execute multiple jumps per day, with all daytime
-- 1 of 11 --
training jumps accompanied by an instructor flying in freefall to deliver mid-air
coaching, debrief videography, and in-flight lifesaving intervention capabilities.
The AMTT employs one military parachute rigger who is dual-hatted as an active
TORDS-E/P instructor and cannot inspect and pack high volumes of parachute
systems while actively instructing in the air. To ensure safety, operational
momentum, and training throughput, contracted parachute rigger packing and
maintenance support is required to augment organic capabilities.
2. Scope
The Contractor shall provide FAA-certificated parachute rigger personnel,
parachute packing, maintenance, inspection, and logistics support to
Reconnaissance Training Company, Detachment Yuma Proving Ground (YPG) –
Advanced Mobile Training Team (AMTT), Advanced Infantry Training Battalion,
School of Infantry (West), in support of TORDS-E/P training in accordance with
Marine Corps Order (MCO) 3120.11A.
Services include on-site parachute rigging, packing, and direct flight-line support
during scheduled Training Iterations at drop zones nationwide, as well as off-site
reserve parachute repacking and main canopy relines conducted at the Contractor's
commercial facility.
3. Applicable References
The Contractor shall perform all work under this contract in accordance with the
following publications, directives, and technical manuals, including all updates and
revisions:
• 3.1 Marine Corps Reference Publication (MCRP) 2-10A.6: Ground
Reconnaissance Operations [USMC Publications].
• 3.2 NAVMC 3500.55C: Reconnaissance Training and Readiness (T&R) Manual
[USMC Training Command].
• 3.3 Marine Corps Order (MCO) 3120.11A: Marine Corps Parachuting Policy
and Program Administration [USMC Directives].
• 3.4 USSOCOM Manual 350-3: Special Operations Forces Baseline
Interoperability Standards (Furnished by the Government within 3 calendar days
of award).
-- 2 of 11 --
• 3.5 Technical Manual (TM) 1670-10/1: Operator’s Manual for Parachute
System-2 (PS-2) Tandem Offset Resupply Delivery System (TORDS) (Furnished
by the Government within 3 calendar days of award).
• 3.6 Department of Defense Instruction (DoDI) 4500.53: DoD Commercial Air
Transportation Quality and Safety Review Program [DoD Issuances].
• 3.7 Title 14, Code of Federal Regulations (CFR), Part 65, Subpart F:
Parachute Riggers.
• 3.8 Federal Travel Regulation (FTR): Chapters 300–304, Temporary Duty
(TDY) Travel Allowances.
4. Support Services and Technical Requirements
4.1 Rigger and Parachute Packing Support
The Contractor shall provide FAA-certificated parachute riggers to deliver packing,
inspection, and direct training support during Government-ordered Training
Iterations.
• 4.1.1 On-Site Training Support Services: The Contractor shall provide on-site
parachute rigging, packing, routine flight-line inspection, user maintenance, and
direct drop-zone operational support during each scheduled Training Iteration.
Support shall cover up to six (6) active flight instructors simultaneously.
• 4.1.2 Supported Parachute and Cargo Systems: Parachute and harness
systems supported under this contract include:
1. Coaches Ram Air Parachute System (CRAPS)
2. Multi-Mission Parachute System (MMPS)
3. Coaches Ram Air Parachute System (CRAPS)
4. Multi-Mission Parachute System (MMPS)
5. Parachute System 2 (PS-2)
6. SG-7/100 Personal Freefall Cargo Harness
7. Military Tandem Vector System (MTVS)
8. Special Operations Version 3 (SOV3)
9. Ram-Air 1 Parachute (RA-1)
10. Military Tandem Tethered Bundle (MTTB)
• 4.1.3 Personnel Qualifications: Designated parachute riggers must hold, at a
minimum, a current Federal Aviation Administration (FAA) Senior Parachute
Rigger certificate with appropriate ratings (Back) under 14 CFR Part 65. The
Contractor shall ensure all rigger personnel are thoroughly trained on the
-- 3 of 11 --
tactical military freefall systems identified in Section 4.1.2 and perform all
packing in accordance with applicable militar…
Source: SAM.gov, as posted. Verify the current solicitation before responding.