What this opportunity is
The Department of Defense is soliciting quotes for commercial internet services under Solicitation Number FA930127Q0005, classified under NAICS 517111 for Wired Telecommunications Carriers. This opportunity is open to all businesses, as it is proceeding through Full and Open competition. Interested vendors must submit a quote that meets the minimum requirements outlined in the solicitation documentation, and compliance with the DoD's CMMC 2.0 framework at Level 1 is required for contract eligibility.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 412TH TEST WING (AFMC)
EDWARDS AIR FORCE BASE CALIFORNIA
AFP 42 Commercial Internet Services
STATEMENT OF WORK
03 Nov 2026
412th Test Wing Operating Location
Air Force Plant 42
Palmdale, CA 93551
-- 1 of 7 --
Page 2 of 7
AFP 42 Commercial Internet Services
1.0 Scope
1.1.0 Air Force Plant 42 (AFP 42) is requesting a fully managed commercial internet service
contract with provider to support 12 buildings and ensure reliable connectivity for Emergency
Response operations, Mission Partners, distinguished visitors, training activities, and overall
quality-of-life improvements.
1.2.0 The Contractor is considered a Commercial Service Internet Provider (CISP) in this
statement of work.
2.0 Requirements Summary
2.1.0 Contractor shall execute a site survey as needed to determine their technical solution.
2.2.0 Contractor shall provide fully managed commercial internet services to include Firewall,
Intrusion Detection System/Intrusion Prevention System (IDS/IPS), Rogue Prevention, Network
Access Control with Wi-Fi Protected Access 2 (WPA2) or greater for security.
2.3.0 System shall be co-managed or administrated by both Contractors and AFP 42
Information Technology (IT) team.
2.4.0 System shall record and notify AFP 42 IT Team via email for any detection, prevention,
unauthorized access and or suspicious network activities.
2.5.0 Contractor shall provide all necessary hardware and appliances that meet the technical
solution. All network equipment must be Trade Agreements Act (TAA) compliant.
2.6.0 Contractor shall propose and install a Commercial Internet solution currently approved
by the AFLCMC CITO UX Team for AFP 42 supported by Edwards AFB. The Contractor shall
obtain an Authority to Operate (ATO) and comply with the “AFMC CISP Admin Management
Guide” which is available upon request from the Contracting Officer.
2.7.0 The Contractor shall provide all required CISP ATO documentation for their proposed
solution to the Government Program Manager (PM) for review to ensure compliance with the
“AFMC CISP Admin Management Guide” prior to submission to the AFLCMC CITO UX
Team. The Contractor and Government PM shall work together and submit the CISP ATO
documentation to the AFLCMC CITO UX Team for final approval.
2.8.0 If the Contractor’s proposed internet service solution is not already approved by the
AFLCMC CITO UX Team, the Contractor shall submit all required documentation to the
Government PM for submission to the AFLCMC CITO UX Team within 10 business days
from contract award. The Contractor is solely responsible for preparing and completing an
Authority to Operate (ATO) package and a Department of Defense Information Network
(DODIN) waiver package for their commercial internet service.
2.8.1.0 The Contractor shall provide all relevant documentation to the AFLCMC CITO UX team
to obtain and maintain the ATO and DODIN waiver. The documentation includes, but is not
limited to:
-- 2 of 7 --
Page 3 of 7
AFP 42 Commercial Internet Services
2.8.2.0 A complete hardware list of all devices (routers, switches, access points, modems, etc.).
2.8.3.0 A list of all Internet Protocol (IP) ranges and subnets assigned.
2.8.4.0 A detailed logical and physical network diagram showing hardware locations and
cabling routes.
2.8.5.0 A predictive and post-installation wireless signal heat map showing access points and
their signal strength/coverage.
2.8.6.0 As-built drawings shall be provided upon completion of the project in PDF format.
2.9.0 The following services and equipment shall be installed and configured in buildings
B510, B509, B584, B554D, B553D B560, B560A/B, B552, B553, B531, B585, and B601.
2.9.1.0 Proposed locations for each access point are for reference only (Floor plans and layouts
are available after contract award), Contractor shall generate heatmaps for each building to
demonstrate optimal coverage and to avoid interference with government wireless
communications and security protocols.
3.0 General Requirements
3.1.0 Contractor shall supply 1 Gigabit (G) internet circuit at the main point of entry (MPOE)
building that will be distributed to end buildings.
3.2.0 The Contractor shall supply all necessary labor, equipment, materials, and maintenance
and support for each building.
3.3.0 The Contractor shall install premise wires to support each end equipment at each
building.
3.4.0 Refer to 19.0 Maintenance and Support section of this document for Contractor access
restrictions and requirements to AFP 42.
4.0 Disposal
4.1.0 The Contractor shall collect, inventory, and dispose of all e-waste in accordance with
applicable contract and environmental Federal, State, Local laws, and DOD instructions and
regulations.
5.0 Building Structural Modification Requirements
5.1.0 If the Contractor determines that structural modifications are necessary to mount required
equipment, the Contractor shall obtain AFP 42 Project Manager (PM) approval prior to any
structural modifications.
6.0 Building Installation Requirements
6.1.1 The Contractor shall install new Cat 5E or Cat 6 ethernet cables for each required
building. If building is impossible to install new cables, Contractor shall work with
-- 3 of 7 --
Page 4 of 7
AFP 42 Commercial Internet Services
government PM to agree to use existing available ethernet cable.
6.1.2 The Contractor shall supply all necessary equipment, materials and hardware for each
building.
6.1.3 The Contractor shall ground all equipment and hardware to the building structure or
building main grounding bus per equipment specification.
6.1.4 The Contractor shall provide fiber patch cables for each building to interface with
government issued fibers path to create distributed network.
6.1.5 The Contractor shall affix a human readable label on all installed equipment with a
minimum of support contact information and the Contractor’s name.
6.1.6 The Contractor shall ensure proper cable management and adherence to applicable
i…
Source: SAM.gov, as posted. Verify the current solicitation before responding.