Skip to content

Open for responses

Plant and Tree Removal

HOMELAND SECURITY, DEPARTMENT OF

Notice type
Sources Sought
Solicitation #
31170PR270000007
NAICS
561730
PSC
S208
Set-aside
No Set aside used
Posted
November 17, 2026
Response due
December 4, 2026
Place of performance
PR

Description

U.S. GUARD BASE SAN JUAN SAN JUAN, PUERTO RICO 00901 STATEMENT OF WORK FOR PLANT REMOVAL VACANT HOMES AT UNITED STATES COAST GUARD RIO BAYAMON HOUSING BAYAMON, PR PROJECT NUMBER: XXX NOVEMBER 2026 Reviewer Signature Date Base San Juan Facilities Engineer LCDR M. Funke Base San Juan Public Works Officer LT. C. Baker -- 1 of 4 -- BASE San Juan PN:XXX PN XXX COCONUT TREE AND TREE REMOVAL 2 1. General 1.1. General Work Requirements The work includes furnishing all labor, tools, equipment, materials, supervision and incidentals for work at the U.S. Coast Guard Rio Bayamon Housing. Work generally includes, but is not limited to, the following: • Removal of plants, shrubs, bushes. • Remove associated stums and roots. • Replacement of sod or landscape restoration to the area of tree removal. 1.2. Qualifications and Performance Requirements 1.2.1. Qualifications A. All work shall be performed by licensed contractors with licenses in respective trades. 1.2.2. Performance and Specific Work Requirements The objective of this project is to safely and efficiently remove plants, shrubs and any vegetation that was planted by previous residents in 25 homes at Río Bayamón Housing Complex. The work includes removing the plants down to their base, removing all debris from the premises, and leaving all designated areas clean, well-maintained, and visually presentable. For each designated residential unit, the contractor will provide all necessary labor, materials, tools, equipment, and supervision required to perform the following: • Remove all plants, shrubs, bushes or vegetation: Cut down specified plants to their base and remove all roots or stubs to prevent them from regrowing. • Debris Disposal: Collect, transport, and properly dispose of all resulting plant material. • Site Cleanup: Ensure that all affected front, side, and backyards are left clean, well-maintained, and visually presentable. • If removed from an area with grass replace with SOD if needed to maintain an overall appearance and aesthetically pleasing appearance. • Project Schedule: Submit proposed project schedule to DCC Ryan Hope via email at ryan.j.hope@uscg.mil. • A site visit is required to view all material that needs to be removed. -- 2 of 4 -- BASE San Juan PN:XXX PN XXX COCONUT TREE AND TREE REMOVAL 3 • Project Schedule Plan: All work is to be done during the weekdays from 0800 to 1400. Excluding weekends and Federal Holidays. • Project Supervisor shall update DCC Ryan Hope at the end of each work day via phone or text at (253) 258-8674. 1.3. Project Location U.S. Coast Guard Rio Bayamon Housing 500 Carr 177. Bayamon, PR 00959 2. Applicable Documents and Code Compliance 2.1. The contractor shall assume full responsibility to ensure work is in compliance with all ICC, Coast Guard Regulations, and local regulations, unless otherwise specified. 3. Submittals 3.1. Within 10 days after award the contractor shall hold a kick-off meeting for all interested parties to go over expectations, requirements, and proposed plan of execution. 3.2. Submittal List A. Roster Of Personnel B. Project Schedule (1) Prepare a Construction Progress Schedule. It shall include all major milestones and events for the entire duration of the construction contract. C. Safety Plan (1) At a minimum, describe the general safety program and identify specific safety provisions for hazards incidental to the contract work such as elevated working surfaces, or similar conditions of the work. Comply with the paragraph titled Safety Program. D. Product Data (1) Submit the product data sheet for each manufactured item. It shall include the manufacturer's descriptive literature of cataloged products, equipment drawings, diagrams, performance and characteristic curves and catalog cuts. Submit complete -- 3 of 4 -- BASE San Juan PN:XXX PN XXX COCONUT TREE AND TREE REMOVAL 4 descriptive data for each type of material. Clearly mark data to indicate the type of material to be provided. 4. Warranty The Contractor shall warrant that all goods supplied, systems, equipment, designs, and work covered by this Scope of Work and subsequent contract shall be satisfactory for its intended purpose, shall conform to and perform as called for in the Contract requirements specifications and shall be free from all defects and faulty materials and workmanship. Any goods supplied, systems, equipment, designs, or work found to be defective within the time specified below shall be repaired, remedied, or replaced, hereinafter called “corrective work”, by the Contractor, free of all charges including transportation. The duration is to be one year or the manufacturer’s standard warranty period, whichever is longer. 5. Coordination Contact LCDR Mark Funke (787-360-1101), or DCC Ryan Hope (206) 815-7510 regarding all questions pertaining to the project. -- 4 of 4 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 561730