Open for responses
Preventative Shredder Maintenance
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
FA481427Q0001
NAICS
811210
PSC
J074
Set-aside
Small Business Set Aside - Total
Posted
November 17, 2026
Response due
November 24, 2026
Place of performance
Tampa, FL
Description
Statement of Work for Shredder Maintenance
1. Description of Work
Contractor will, in support of USSOCOM, perform shredder maintenance on two Model 1424 SEM
Disintegrator Systems and one Model 22 SEM Disintegrator System in accordance with the attached
“Shredder Maintenance Technical Requirements”. Regular service is required once per quarter or four
times per calendar year. Maintenance will be scheduled no later than 14 days out prior to maintenance.
Visits should be scheduled through USSOCOM Engineer Facilities Office. There is a requirement for
two categories of unscheduled maintenance, emergency and urgent. Emergency maintenance is required
when there is a work stoppage due to breakage. Urgent maintenance refers to maintenance prior to
deemed imminent breakage. Contractor must also be able to perform emergency maintenance on an as-
needed basis within a 48 hour response period. Contractor must also be able to perform urgent
maintenance on an as-needed basis within a 72 hour response period. Contractor is required to clean the
shredder area of all debris caused by the maintenance after the maintenance work is completed and
before Project Acceptance. A qualified technician is required. Scope may include emergency
replacement of parts (to be separately negotiated).
2. Place of Performance
Primary place of performance is building 502, USSOCOM, MacDill AFB, FL.
3. Schedule of Performance
Contractor shall schedule and coordinate quarterly maintenance with the USSOCOM Facilities Office
Monday through Friday between the hours of 0700 and 1500. Visits will be scheduled at least 14
working days prior to maintenance. Emergency service will be conducted on an as-needed basis.
4. Security Requirements
Contractor shall be responsible for obtaining a base entry pass in accordance with the base entry
requirements. This pass shall be used to gain entry to the base to only perform services to fulfill
contractual requirements described in this scope of work. This pass shall not be used to gain entry to any
other area of the base.
5. Pay Schedule
Contractor shall maintain the ability to receive electronic payment from the government as stipulated in
the contract requirements. This is done through the Wide Area Work Flow system.
6. Reports
Contractor will be required to submit a report after each visit. Report shall address all items identified in
the description of work above and the attached checklist.
-- 1 of 3 --
7. Project Acceptance
Contractor is required to brief the Facilities POC after work is performed and obtain acceptance of
service.
• Shredder Maintenance Technical Requirements
a. Frequency: Scheduled maintenance shall be conducted quarterly. Scheduled maintenance
dates shall be coordinated at least 14 working days prior to maintenance and can be
rescheduled at the convenience of the government within 48 hours with no cost to the
government. Emergency maintenance will be on an “as needed” basis with a 48 hour response
time. Urgent maintenance will be on an “as needed” basis with a 72 hour response.
b. Invoicing: Normal invoicing shall be submitted within one week of service in accordance with
Government Contracting Officer instructions.
c. Maintenance Report: Contractor shall create a comprehensive maintenance report tailored to
each Shredder Model and will contain the tasks outlined below but will not be limited to the
task listing. Any additional tasks that are not initially included but support the maintenance
and operational integrity of the shredders can be added on a case by case basis. The report
will be reviewed and approved by the Facility Manager or Engineering prior to start of
inspection. Report format can be edited at the discretion of the USSOCOM Engineering
Office.
• Maintenance Tasks
This listing is the minimum requirements for maintenance and can be amended at the discretion of the
USSOCOM Engineering Office. Requirements apply to all models of Shredders.
To Be Performed Quarterly. Four (4) Times Per Year.
General Procedures
• Perform a walkthrough providing a visual check of all system components prior to performing any
maintenance.
• Perform a full operational check of system prior to performing any maintenance.
• Prior to staring any work advise client of current running condition and/or any deficiencies
• Perform a lock out/tag out procedure on entire system prior to opening machine
• Open Disintegrators and perform the following inspections:
o Inspect rotor and rotor bearings for side to side movement and wear
o Inspect hopper and cutting chamber
o Inspect security screen for wear and proper fit
o Inspect bolts on hopper, chamber, and motor mounts
• Remove dull knives and install spare sharp set of knives
o Spare set of knives for each machine must be provided and maintained during contract
period.
o Perform this procedure four (4) times per 12 month period, once per quarter
o Remove dull set of knives from site and re-sharpen to specifications. Return prior to next
service.
-- 2 of 3 --
• Adjust and calibrate rotor and bed knife tolerances to specifications.
• Inspect main drive sheave bolt tension. Adjust to specifications if needed.
• Inspect main drive belts for wear.
• Adjust main drive belt tension to specifications.
• Grease disintegrator main drive motor bearings.
• Inspect conveyor and conveyor controls.
• Remove conveyor covers and grease conveyor drive bearings.
• Area must be cleaned and signed off by the Facility Manager after each service/visit.
• Prepare and complete evaluation report with recommendations.
Evacuation System
• Perform operating inspection of waste evacuation system.
• With a ladder access outside air system and waste frame to check spiral duct for leaks at all
locations exterior and interior locations.
• Check FT40 filter system, frame and panels for leaks and damage.
• Remove FT 40 access panels for visual inspection of filter tubes and socks.
o Clean FT40 filter vessel.
• Shake FT 40 filter and replace …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 811210
PM and Repair Services for Siemens MRI System at Brian D. Allgood Army Community Hospital, USAG Humphreys, South Korea
DEPT OF DEFENSE · Sources Sought · due November 19, 2026
Repair of NSN: 3010016608071FD Gearcase Motor, JTE System
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 17, 2026
J065-- Bayer Radiology Injector Maint. - White River Junction VAMC
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due November 24, 2026
Serv C26-127 Repair Test Stands
DEPT OF DEFENSE · Presolicitation · due November 20, 2026
SILVER SERVICE PACKAGE PREVENTATIVE MAINTENANCE
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Combined Synopsis/Solicitation · due December 1, 2026
PCDMIS CAD++ Software Renewal and CMM Calibration
DEPT OF DEFENSE · Solicitation · due November 25, 2026