Skip to content

Open for responses

Preventive Maintenance and Repair Services - Kahuku Training Area (KTA)

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
W912CN-27-Q-A008
NAICS
561210
PSC
S216
Set-aside
Small Business Set Aside - Total
Posted
October 30, 2026
Response due
December 1, 2026
Place of performance
Kahuku, HI

What this opportunity is

The Department of Defense is seeking preventive maintenance and repair services for HVAC, fire alarm, emergency lighting, and lightning protection systems at Kahuku Training Area in Hawaii. This opportunity is a Total Small Business Set-Aside under NAICS code 561210, making it suitable for small businesses. Interested contractors should note that this is a Combined Synopsis/Solicitation, requiring them to monitor SAM.gov for updates and submit a complete quotation electronically, including specific documentation as outlined in the solicitation.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Annex A (Overarching Base Operations PWS) to OPORD 24-015 IMCOM Enterprise Base Operations (BASEOPS) Performance Work Statement (PWS) Performance Work Statement (PWS) Base Operations Preventive Maintenance and Repair at Kahuku Training Area (KTA) -- 1 of 52 -- Annex A (Overarching Base Operations PWS) to OPORD 24-015 IMCOM Enterprise Base Operations (BASEOPS) Performance Work Statement (PWS) 1.0 Introduction. This is a nonpersonal services contract to provide Preventive Maintenance and Repair (PMR) at Kahuku Training Area (KTA), Island of Oahu, State of Hawaii. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall furnish all parts required to perform preventive maintenance and authorized repair work under this PWS or under a written firm-fixed- price task order. Part-required repairs shall be performed in accordance with Sections 8.8 through 8.10. 1.2 Objectives. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and Local Laws, Regulations, and Directives to include, but not limited to, the publications in Section 7, Related Documents. 1.2.1 The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract. The Contractor is also responsible for maintaining and updating Technical Exhibit 1 (TE 1) to reflect any changes or discrepancies identified. 1.3 Climatic Conditions. The average annual rainfall is 33.15 inches, with the wettest months being November through March. Typical daytime temperatures range from about 79 degrees Fahrenheit (December through March) to about 89 degrees Fahrenheit (June through October). Summer temperatures often reach 89 degrees Fahrenheit. 1.4 Facility Access. The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the Fire Department point of contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection. The Fire Department will reset alarm systems to operational status. 1.5 Traffic Flow. The Contractor shall maintain the free flow of traffic during surfaced area maintenance. The Contractor shall notify the KO, in writing, a minimum of fourteen (14) calendar days in advance of any scheduled closure of streets. Emergency road closures shall be coordinated with the COR or ACOR. 1.6 Drainage. Maintenance work performed under this contract shall not impede drainage. 1.7 Restoration of Landscape Damage. N/A 1.8 Dust Suppression. N/A 1.9 Utility Location. N/A 1.10 Excavation Permits. N/A 1.11 Work Clearance. N/A -- 2 of 52 -- Annex A (Overarching Base Operations PWS) to OPORD 24-015 IMCOM Enterprise Base Operations (BASEOPS) Performance Work Statement (PWS) 2.0 Requirements. 2.1 Description of Services. The Contractor shall furnish all necessary management, transportation, labor, equipment, materials, supplies, and tools to perform Preventive Maintenance (PM) and Repairs on equipment and systems per manufacturer’s recommendations as well as routine repairs at Kahuku Training Area (KTA) on the Island of Oahu. Perform all work in accordance with current Occupational Safety and Health Administration standards, Federal, State and County laws, regulations and commercial standards. 2.1.1 Non-Personal Services. The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Nonpersonal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (RFO FAR) Subpart 37.2, under general contracting authority, and does not require specific statutory authorization. 2.1.2 General Information 2.1.2.1 Transition (Phase In/Phase Out). The Contractor shall prepare and submit a transition plan within ten (10) business days after the contract award. The transition plan will have a sixty (60) business day transition period that will be implemented by the Contractor and shall state Contractor key personnel on board. The Contractor shall provide sufficient experienced personnel during the phase in and phase out period to ensure that the services are maintained at the required level of proficiency. During the phase in, the Contractor shall observe all operations pertinent to the requirements of the PWS, to include office functions, procedures, operations, repair/maintenance operations, and any other operations as deemed necessary by the Contractor that will enable Contractor personnel to become both knowledgeable in, and familiar with their assigned areas of responsibility. The Contractor shall commence all operations required by this PWS as of the first day of the contract period. Therefore, on the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract. Deliverable A001 Transition Plan 2.1.2.1.1 Phase In/Phase Out for Incumbent Contractor. If the Contractor is the incumbent Contractor, the phase out/phase in period shall be no more than thirty (30) calendar days and will primarily consist of administrative transition under the new contract number. All documents shall be updated with the …

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 561210