Description
Electron-Ion Collider, Brookhaven National Laboratory
Doc No. EIC-INS-SPC-010 Author: Manfred Wendt Effective Date: August 31, 2026 Review Frequency: N/A
Title: ESR Swap-out Injection Stripline Kicker Prototype Revision: 00
Page 1 of 12
TECHNICAL SPECIFICATION
for the
ESR Swap-out Injection Stripline Kicker Prototype
Quality Classification: A-3
Prepared By:
_________________________________ Date: __________________
Manfred Wendt, Instrumentation Engineer
BNL, EIC
Reviewed By:
_________________________________ Date: __________________
Matthew Paniccia, Technical Representative
_________________________________ Date: __________________
Chuyu Liu, Subsystem Manager for Pulsed Devices
EIC
_________________________________ Date: __________________
Vincent Schoefer, System Manager for Rapid
Cycling Synchrotron EIC
_________________________________ Date: __________________
Qiong Wu, Associate Project Manager for Electron
Injector EIC
_________________________________ Date: __________________
Joseph Zipper, EIC Quality Assurance Representative
Approved By:
_________________________________ Date: __________________
Sergei Nagaitsev, Technical Director, EIC
Docusign Envelope ID: 861AC09B-804C-80B6-8124-6ED0C1B95890
8/31/2026
9/7/2026
9/1/2026
9/1/2026
8/31/2026
8/31/2026
9/9/2026
-- 1 of 12 --
Electron-Ion Collider, Brookhaven National Laboratory
Doc No. EIC-INS-SPC-010 Author: Manfred Wendt Effective Date: August 31, 2026 Review Frequency: N/A
Title: ESR Swap-out Injection Stripline Kicker Prototype Revision: 00
Page 2 of 12
REVISION HISTORY
Revision # Effective Date Summary of Change
00 08/31/2026 Initial Release
Docusign Envelope ID: 861AC09B-804C-80B6-8124-6ED0C1B95890
-- 2 of 12 --
Electron-Ion Collider, Brookhaven National Laboratory
Doc No. EIC-INS-SPC-010 Author: Manfred Wendt Effective Date: August 31, 2026 Review Frequency: N/A
Title: ESR Swap-out Injection Stripline Kicker Prototype Revision: 00
Page 3 of 12
Table of Contents
1 SCOPE .............................................................................................................................................................. 5
1.1 Background ......................................................................................................................................... 5
2 APPLICABLE DOCUMENTS ........................................................................................................................ 5
2.1 Documents ........................................................................................................................................... 6
2.2 Engineering Models and Drawings ..................................................................................................... 6
2.3 Code and Standard Compliance .......................................................................................................... 6
2.4 Interpretation ....................................................................................................................................... 6
3 REQUIREMENTS............................................................................................................................................ 7
3.1 Technical/Performance Characteristics ............................................................................................... 7
3.1.1 ESR Injection Operating Requirements .............................................................................. 7
3.1.2 Kicker Timing and Deflection Requirements ..................................................................... 7
3.2 Geometric Requirements ..................................................................................................................... 7
3.3 Mechanical Design and Tolerances ..................................................................................................... 8
3.4 Materials and Surface Requirements ................................................................................................... 8
3.5 HV Coaxial UHV RF Feedthrough ..................................................................................................... 8
3.6 Thermal Management and Cooling ..................................................................................................... 9
3.7 RF/Electrical Verification ................................................................................................................... 9
3.8 Vacuum and Cleanliness ..................................................................................................................... 9
3.9 Fabrication and Assembly ................................................................................................................. 10
4 INSPECTION, TESTING, AND ACCEPTANCE ......................................................................................... 10
4.1 RF Mockup Verification.................................................................................................................... 10
4.2 Prototype RF Characterization .......................................................................................................... 10
4.3 Thermal/Cooling Verification ........................................................................................................... 10
4.4 Vacuum Certification ........................................................................................................................ 12
4.5 Configuration Control and Nonconformance .................................................................................... 11
5 DOCUMENTATION AND SUBMITTALS .................................................................................................. 11
5.1 Required Contractor Documentation ................................................................................................. 11
5.2 File Formats and Data Delivery.........................................................................................................…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 335999
59--BARRIER,ACOUSTIC
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026
49--VALVE,SPLINED
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 3, 2026
61--CABLE ASSEMBLY,SPECIAL
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026
61--CABLE ASSEMBLY,SPECIAL
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026
61--POWER SUPPLY
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026
61--POWER SUPPLY
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026