Skip to content

Open for responses

Provide service for main switch gear cleaning, visual inspection, breaker servicing, battery replacement and DC control power maintenance located at USCG Base Portsmouth

HOMELAND SECURITY, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
31040RFQ270000084
NAICS
811310
PSC
J061
Set-aside
Small Business Set Aside - Total
Posted
November 24, 2026
Response due
December 8, 2026
Place of performance
Portsmouth, VA

Description

PR #: 31040PR270000084 STATEMENT OF WORK LAST UPDATED: 11/12/2026 PAGE 1/6 STATEMENT OF WORK (SOW) FOR USCG Base Portsmouth Main Switchgear Cleaning, Visual Inspection, Breaker Servicing, Battery Replacement and DC Control Power Maintenance 1.0 GENERAL 1.1 SCOPE The Contractor shall furnish new batteries and all necessary labor, tools, specialized equipment, personal protective equipment (PPE), materials, and certified technicians to inspect and clean the switchgear vertical sections. Switchgear DC Control Battery Replacement & Charger Operational Check. Verify de-energization, zero energy verification, and apply facility-approved LOTO protocols. If work on the control battery system must occur while switchgear is online, strict DC arc/shock protective boundaries must be enforced. 2.1 TASK ONE. Switchgear Vertical Sections: Inspection and Cleaning 2.1.1 Vacuum and clean exterior panels, louvers, filters, and access doors. 2.2.2 Clean switchgear interior compartments. Wipe down insulators, busbar supports, and barriers. Ensure louver screens and ventilation pathways are clear of dust and debris. Clean breaker frames, operating linkages, and arc chutes. 2.2.3 Inspect hinges, latches, interlocks, and door gaskets for physical damage, binding, or deterioration. Inspect internal vertical sections, busbars, supports, and insulators. 2.2.3 Rack out/draw out the One (1) 1200A Main Breaker , Three (3) 1200A Feeder/Breakers One (1) Generator Breaker 1200 A into the disconnected/test position (or remove to breaker maintenance cart). 2.2.4 Inspect primary stabs, finger clusters, ground shoes, and secondary disconnect contacts for signs of wear, burning, galling, or misalignment. Inspect arc chutes, inter-phase barriers, and charging mechanism assemblies. 2.2.5 Provide a inspection report to the USCG 2.2 TASK TWO. Switchgear DC Control Battery Replacement & Charger Operational Check 2.2.1 Safely isolate and disconnect the existing four (4) 12V 32A control power batteries. Remove old batteries and dispose of/recycle them in strict accordance with EPA and local environmental regulations (provide recycling manifests). -- 1 of 6 -- PR #: 31040PR270000084 STATEMENT OF WORK LAST UPDATED: 11/12/2026 PAGE 2/6 2.2.2 Clean battery rack/tray, inspecting for acid damage, rust, or structural integrity issues. Apply neutralizing wash if necessary. 2.2.3 Supply and install four (4) new OEM-equivalent 12-volt, 32-amp batteries. Clean, treat, and torque all inter-cell connectors, terminals, and cable using anti- corrosion grease and calibrated torque tools 2.2.2 Energize the installed battery charger and verify proper DC output polarity and system connection. Measure and document open-circuit and loaded output voltage.Verify charger operating modes. 2.2.3 Test functional charger alarms and indicators (e.g., AC Failure, Low DC Voltage, High DC Voltage, Ground Fault detection). Verify that the switchgear trip and close control circuits receive steady, uninterrupted DC control voltage. 3.0KEY PERSONNE Project Manager 3.1 PROJECT MANAGER 3.1.1 The Project Manager must be available to the QAE via telephone between the hours of 0700 and 1530 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 24 hours of notification. 3.2 EMPLOYEE IDENTIFICATION 3.2.1 The QAE will provide a Base Access request form. The Contractor will need to return the Base Access form with list of all employees to the QAE Representative five (5) days prior to commencing work. The USCG Base Portsmouth Security Office will be given a copy of the employee list, and a pass will be issued for entry. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair. 3.3 EMPLOYEE CONDUCT Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security. 3.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services -- 2 of 6 -- PR #: 31040PR270000084 STATEMENT OF WORK LAST UPDATED: 11/12/2026 PAGE 3/6 required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee. 3.5 SITE VISIT A site visit is recommended to conduct field verification of any/all quantities and measurements before submitting bids. Interested parties shall make arrangements for a site visit with the QAE. 3.5.1 DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE Nathan Chappell. (206)815-2176 Nathan.C.Chappell@uscg.mil. 3.5.2 All site visits are to be pre-arranged a minimum of three (03) days in advance. To arrange a site visit, the QAE will email a base access form to be filled out. 3.5.3 CONDITIONS AFFECTING THE WORK The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 811310