Skip to content

Open for responses

Re-Activation of Snake River Water Pump

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
FA489727Q0004
NAICS
221310
PSC
S114
Set-aside
Small Business Set Aside - Total
Posted
November 9, 2026
Response due
November 30, 2026
Place of performance
0, ID

What this opportunity is

The Department of Defense is seeking quotes for the re-activation of the Snake River Water Pump at Mountain Home Air Force Base, Idaho, under NAICS code 221310. This opportunity is set aside for small businesses and involves specialized mechanical, civil, and industrial water systems services. Interested contractors should note that this is a Combined Synopsis/Solicitation, meaning they should track the notice for updates rather than submit a bid immediately. An optional site visit is scheduled for November 20, 2026, and questions are due by November 23, 2026.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

STATEMENT OF WORK (SOW) RE-ACTIVATE SNAKE RIVER WATER TRANSMISSION SYSTEM (WTS) INTAKE PUMP STATION & PIPELINE 366th Civil Engineer Squadron (366 CES) Mountain Home Air Force Base, Idaho Date: 13 October 2026 CHANGE LOG Revision Date Author Page #’s Affected Description of Change(s) TABLE OF CONTENTS • 1.0 INTRODUCTION • 2.0 TOPOGRAPHICAL INFORMATION • 3.0 PERIOD OF PERFORMANCE (POP) & SCHEDULE • 4.0 SCOPE OF EFFORT • 4.1 General Requirements & Technical Qualifications • 4.2 Pre-Activation Inspection & System Verification • 4.3 Penstock Flushing • 4.4 Mechanical & Fluid System Re-Commissioning • 4.5 Coordination with Water Treatment Plant (WTP) Contractor (RSCI) & Controls Interface • 4.6 3.5-Million-Gallon Continuous Flow Demonstration & Pumping Operations • 4.7 Operations Flight (366 CEO) Training, Witnessing & Formal Turnover • 5.0 REQUIREMENTS & SUBMITTALS • 5.1 General Requirements • 5.2 Environmental Protection & Waste Management (Section 01 57 19) • 5.3 Safety & Health Compliance (EM 385-1-1 / OSHA) • 6.0 GENERAL PROVISIONS -- 1 of 10 -- • 7.0 APPLICABLE CODES, STANDARDS & REFERENCES • 8.0 SPECIAL CONSIDERATIONS & SITE-SPECIFIC CONSTRAINTS • APPENDIX A – EQUIPMENT SCHEDULE & TECHNICAL REFERENCE DATA • APPENDIX B – DRAWINGS, AS-BUILTS & SCHEMATIC REFERENCES 1.0 INTRODUCTION 1.1 The United States Government (USG) has a requirement for specialized mechanical, civil, and industrial water systems services at Mountain Home Air Force Base (MHAFB) and associated off-base utility corridors in Elmore and Owyhee Counties, Idaho. 1.2 The contractor shall furnish all management, licensed professional personnel, specialized labor, equipment, tools, testing apparatus, materials, transportation, and incidentals necessary to inspect, re-activate, test, and demonstrate the operational readiness of the State-constructed Snake River Water Transmission System (WTS) Intake Pump Station and associated 14.5-mile raw water transmission pipeline. 1.3 System re-activation focuses strictly on the core water conveyance infrastructure to include but not limited to: the intake structure, raw water pumps, surge vessel, pneumatic charging system, primary pipeline control and relief valves, high-point air valves, and main electrical switchgear. SCADA programming and network telemetry integration between the pump station and the on-base Water Treatment Plant (WTP) will be performed separately by the WTP construction contractor (RSCI) and base personnel. 1.4 Upon completion of the required functional equipment testing, pipeline filling, and a continuous 3.5-million-gallon flow demonstration to the on-base WTP, the contractor shall formally transfer operational control of the WTS to the 366th Civil Engineer Squadron Operations Flight (366 CEO) to support ongoing commissioning and performance demonstration of the base WTP. 1.5 Government Disclaimer and Contractor Verification of Technical Data: All technical parameters, volumetric flow rates (e.g., GPM/MGD), system pressures (PSI), total dynamic heads (TDH), static heads, pipe dimensions, and topographical elevations stated in this SOW and its appendices are provided solely for general informational and reference purposes. The Government assumes no responsibility or liability for the completeness, accuracy, or operational validity of these figures. The Contractor shall be solely responsible for drawing and specification review, site inspection, and field verification of all actual operating pressures, hydraulic gradients, elevations, pipeline lengths, and volumetric flow capacities prior commencing work. 2.0 Topographical 2.1 Topographical & Hydraulic Context: • The C.J. Strike Intake Pump Station is located on the Snake River at normal pool elevation ~2,455 ft MSL, while the terminal receiving facilities at Mountain Home AFB sit on the Snake River Plain plateau at ~2,996 ft MSL. -- 2 of 10 -- • This profile creates approximately (234 to 238 PSI of static water column head). • To overcome this static lift and dynamic line friction over 14.5 miles, the pump station discharge manifold and lower penstock operate at high pressures (approaching 280 to 300 PSI), whereas the upper plateau segments along Highway 67 transition into lower hydraulic head, utilizing 20-inch HDPE (DR 17 IPS) rated for 125 PSI. • Construction of the raw water intake pump station, steel concrete lined penstock, surge tanks, auxiliary equipment, and 14.4-mile transmission pipeline was completed in the spring/summer of 2025 under contract to IDWR. Following initial hydrostatic and pressure testing, the system was configured to sit idle indefinitely while DAF and IDWR worked to finalize real property gift conveyance, easement bounds, and environmental operating permits. 3.0 MILESTONE CHECKLIST & SCHEDULE 3.1 Operational Milestone Execution: • The contractor shall provide a milestone schedule to accomplish the work along with estimated time to complete each milestone. • The contractor shall achieve full mechanical/electrical readiness, complete penstock flushing, execute pipeline filling, and conduct the continuous 3.5-million-gallon raw water flow demonstration in close coordination with the 366 CES and WTP commissioning team. 4.0 SCOPE OF EFFORT 4.1 General Requirements & Technical Qualifications 4.1.1 Technical Competency: The contractor and any proposed specialty subcontractors shall possess verifiable experience in large-scale municipal water pumping facilities, vertical turbine pumps, medium/low-voltage motor controls, and high-pressure transmission pipelines. 4.1.2 Location of Work: Work will be performed primarily at the C.J. Strike Reservoir Raw Water Intake Pump Station (located off-base near Grand View/Bruneau, ID), appurtenances along the 14.5-mile pipeline alignment along C.J. Strike Cutoff Rd, Highway 167, Highway 67 (Airbase Road), and terminal monitoring connections at the MHAFB Water Treatment Plant (Building 2720/WTP complex). 4.2 Pre-Activation Inspect…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 221310