Skip to content

Open for responses

Replace Door Control Unit

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
FA462027QC002
NAICS
334519
PSC
6110
Set-aside
Small Business Set Aside - Total
Posted
November 10, 2026
Response due
November 20, 2026
Place of performance
Fairchild AFB, WA

What this opportunity is

The Department of Defense is seeking small businesses to provide replacement services for a Door Control Unit at Fairchild Air Force Base in Washington. This sources sought notice is intended to identify potential vendors capable of supplying labor, tools, and materials necessary for the replacement and programming of the unit, which falls under NAICS Code 334519. As this is a sources sought notice, interested firms should prepare to submit information about their capabilities but note that this is not a solicitation for bids; tracking this opportunity will be essential for future solicitation announcements.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

STATEMENT OF WORK FOR B1009 REPLACE DOOR CONTROL UNIT FAIRCHILD AIR FORCE BASE, WA October 2026 DRAFT -- 1 of 7 -- Statement of Work (SOW) B1009 Replace Door Control Unit Fairchild AFB, WA 1. DESCRIPTION OF SERVICE. Contractor shall provide all necessary labor, tools, equipment and materials to purchase, remove/replace, program, and test the primary internal logic controller unit for the Albany UltraFast high-speed commercial roll-up door, to include the controls, hardware and electrical system connections at Building 1009 on Fairchild AFB, WA. Upon completion the contractor will provide fully operational door systems as described in this Statement of Work. All work shall be performed in accordance with all Federal, State, local laws and regulations, manufacturer’s recommendations and requirements set forth in this Statement of Work (SOW). 2. SCOPE OF WORK. The Contractor shall provide and install all material, equipment and services including labor, unless otherwise specified herein, required under this contract. i. Coordinate disconnect of electrical power system of existing door operators at least two days prior to start of work with 92 CES point of contact, Mr. Michael Ehrman at 509-247-4238. ii. Remove existing primary internal logic controller unit and dispose of materials at an approved off-site location. iii. Procure, deliver, install, and test a replacement primary internal logic controller unit, compatible with the existing Albany UltraFast high-speed commercial roll up door. iv. Coordinate reconnection of electrical power system with 92 CES point of contact. Adjust all controls and safety devices to ensure doors are fully operational. v. Contractor shall clean up work area at end of each workday and upon completion of work. 3. GENERAL INFORMATION 3.1 HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with Civil Engineering points of contact. January 1 New Year’s Day 3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day June 19 Juneteenth July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas 3.2 SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations. All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation shall be US Citizens. The work location is in a secure area and a government escort WILL be required. DRAFT -- 2 of 7 -- 3.3 GOVERNMENT FURNISHED PROPERTY AND SERVICES: The Government shall furnish a fully qualified Electrician to perform electrical power disconnect prior to removal of existing internal control unit and connection of electrical power to the new operators with coordination made at least 2 workdays prior. The Government shall furnish site access, restroom facilities, and electrical power. In the event of an emergency, dial 911. 4. CONTRACTOR HAZARDOUS MATERIAL MANAGEMENT: 4.1 CONTRACTOR HAZARDOUS MATERIALS. In accordance with AFMAN 32-7002, Environmental Compliance and Pollution Prevention, a hazardous material includes all items covered under EPCRA tracking requirements, the OSHA HAZCOM standard, and all Class I and II Ozone Depleting Substances. Hazardous materials includes all material hazardous to health, safety, or the environment, such as but not limited to, hazardous chemicals, hazardous substances, toxic chemicals, and extremely hazardous substances, as defined by any of the following: 29 Code of Federal Regulation (CFR) 1910.1200; 40 CFR Part 302, Table 302.4; 40 CFR Part 355 with Appendices; and 40 CFR 372.65. The Contractor shall use non-hazardous materials whenever possible. The Contractor shall be responsible for the proper storage, management, and disposal of any hazardous material brought on Base for contractor use. 4.2 HAZARDOUS MATERIAL STORAGE. For any single hazardous material stored on-site in a quantity equal to or exceeding 55-gallons at any time, the contractor shall provide secondary containment for the entire quantity of that hazardous material. Hazardous material shall be stored within a locked secure area not accessible to the base populace after hours. All containers of hazardous material shall be clearly and properly labeled; closed when not in use; and stored in an upright, secure position. 4.3 HAZARDOUS MATERIAL AUTHORIZATION. Hazardous materials must be approved by the HMMP Team prior to being brought onto the installation. The Contractor shall submit a list of all hazardous materials intended for use, along with corresponding Safety Data Sheets (SDS), to the HMMP Team, through the Contracting Officer (CO), at least fourteen (14) days prior to beginning work or bringing hazardous materials onto the installation. The listing shall include product name, chemical type, and quantity to be brought onto the installation, process for which it will be used, and disposal method for empty containers and any resulting hazardous or nonhazardous waste. The Contractor shall report how and when approved hazardous materials are used, including any amount spilled, evaporated as an air emission, or properly disposed of as solid or hazardous waste. Special reporting may be required at the Contractor's expense. The Contractor shall submit this information to the COR, prior to using hazardous materials (HAZMAT), using a Contractor Hazardous Material Work Sheet and correspondi…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 334519