Description
STATEMENT OF WORK
FOR
B1009 REPLACE DOOR CONTROL UNIT
FAIRCHILD AIR FORCE BASE, WA
October 2026
DRAFT
-- 1 of 7 --
Statement of Work (SOW)
B1009 Replace Door Control Unit
Fairchild AFB, WA
1. DESCRIPTION OF SERVICE. Contractor shall provide all necessary labor, tools, equipment and
materials to purchase, remove/replace, program, and test the primary internal logic controller unit for
the Albany UltraFast high-speed commercial roll-up door, to include the controls, hardware and
electrical system connections at Building 1009 on Fairchild AFB, WA. Upon completion the
contractor will provide fully operational door systems as described in this Statement of Work. All
work shall be performed in accordance with all Federal, State, local laws and regulations,
manufacturer’s recommendations and requirements set forth in this Statement of Work (SOW).
2. SCOPE OF WORK. The Contractor shall provide and install all material, equipment and services
including labor, unless otherwise specified herein, required under this contract.
i. Coordinate disconnect of electrical power system of existing door operators at least two days
prior to start of work with 92 CES point of contact, Mr. Michael Ehrman at 509-247-4238.
ii. Remove existing primary internal logic controller unit and dispose of materials at an
approved off-site location.
iii. Procure, deliver, install, and test a replacement primary internal logic controller unit,
compatible with the existing Albany UltraFast high-speed commercial roll up door.
iv. Coordinate reconnection of electrical power system with 92 CES point of contact. Adjust all
controls and safety devices to ensure doors are fully operational.
v. Contractor shall clean up work area at end of each workday and upon completion of work.
3. GENERAL INFORMATION
3.1 HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding
Federal Holidays and any other designated down day. Work can be done at other than the normal hours of
operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all
hours of work and any service interruptions with Civil Engineering points of contact.
January 1 New Year’s Day
3rd Monday in January Martin Luther King, Jr. Day
3rd Monday in February President’s Day
Last Monday in May Memorial Day
June 19 Juneteenth
July 4 Independence Day
1st Monday in September Labor Day
2nd Monday in October Columbus Day
November 11 Veterans Day
4th Thursday in November Thanksgiving Day
December 25 Christmas
3.2 SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of
this contract, or any representative of the Contractor entering the government installation, shall abide
by all Fairchild Air Force Base security regulations. All personnel employed by the Contractor in the
performance of this contract, or any representative of the Contractor entering the government
installation shall be US Citizens. The work location is in a secure area and a government escort
WILL be required.
DRAFT
-- 2 of 7 --
3.3 GOVERNMENT FURNISHED PROPERTY AND SERVICES: The Government shall furnish a
fully qualified Electrician to perform electrical power disconnect prior to removal of existing internal
control unit and connection of electrical power to the new operators with coordination made at least 2
workdays prior. The Government shall furnish site access, restroom facilities, and electrical power. In
the event of an emergency, dial 911.
4. CONTRACTOR HAZARDOUS MATERIAL MANAGEMENT:
4.1 CONTRACTOR HAZARDOUS MATERIALS. In accordance with AFMAN 32-7002,
Environmental Compliance and Pollution Prevention, a hazardous material includes all items covered
under EPCRA tracking requirements, the OSHA HAZCOM standard, and all Class I and II Ozone
Depleting Substances. Hazardous materials includes all material hazardous to health, safety, or the
environment, such as but not limited to, hazardous chemicals, hazardous substances, toxic chemicals, and
extremely hazardous substances, as defined by any of the following: 29 Code of Federal Regulation
(CFR) 1910.1200; 40 CFR Part 302, Table 302.4; 40 CFR Part 355 with Appendices; and 40 CFR 372.65.
The Contractor shall use non-hazardous materials whenever possible. The Contractor shall be responsible
for the proper storage, management, and disposal of any hazardous material brought on Base for
contractor use.
4.2 HAZARDOUS MATERIAL STORAGE. For any single hazardous material stored on-site in a
quantity equal to or exceeding 55-gallons at any time, the contractor shall provide secondary containment
for the entire quantity of that hazardous material. Hazardous material shall be stored within a locked
secure area not accessible to the base populace after hours. All containers of hazardous material shall be
clearly and properly labeled; closed when not in use; and stored in an upright, secure position.
4.3 HAZARDOUS MATERIAL AUTHORIZATION. Hazardous materials must be approved by the
HMMP Team prior to being brought onto the installation. The Contractor shall submit a list of all
hazardous materials intended for use, along with corresponding Safety Data Sheets (SDS), to the HMMP
Team, through the Contracting Officer (CO), at least fourteen (14) days prior to beginning work or
bringing hazardous materials onto the installation. The listing shall include product name, chemical type,
and quantity to be brought onto the installation, process for which it will be used, and disposal method for
empty containers and any resulting hazardous or nonhazardous waste. The Contractor shall report how
and when approved hazardous materials are used, including any amount spilled, evaporated as an air
emission, or properly disposed of as solid or hazardous waste. Special reporting may be required at the
Contractor's expense. The Contractor shall submit this information to the COR, prior to using hazardous
materials (HAZMAT), using a Contractor Hazardous Material Work Sheet and correspondi…