What this opportunity is
The Department of Homeland Security is soliciting a total small business set-aside contract for interior renovations of Southwest District Command Offices in Building 52 on Coast Guard Island, California. The work involves replacing existing carpet with laminate vinyl flooring and painting the interior spaces. This opportunity suits small businesses that specialize in flooring installation and painting services, specifically those with experience in commercial interior renovation projects. Bidders should track the solicitation as it is a formal notice, and note that the project requires a specific type of laminate vinyl flooring that meets certain minimum requirements.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK (SOW)
Interior Renovations of Southwest District Command Offices
1. PROJECT OVERVIEW
This Scope of Work details the requirements for the interior renovation of
Southwest District offices located in Building 52, Campbell Boulevard, Coast
Guard Island, Alameda, CA 94501. The project involves two main components:
(1) the removal of existing carpet and installation of new laminate vinyl flooring,
and (2) the complete interior painting of the office spaces. The objective is to
refresh and modernize the office environment with minimal disruption to building
occupants.
2. SCOPE OF WORK
The work shall include, but is not limited to, the following:
2.1. Flooring: Replace of Carpet with Laminate Vinyl Flooring in the areas
indicated in the Floor Plan 1.
2.1.1. Remove Existing Flooring:
2.1.1.1. The contractor shall remove and dispose of all existing carpet -
approximately 2231 SF.
2.1.1.2. All adhesive and residue from the previous flooring will be
removed from the subfloor.
2.1.2. Subfloor Preparation:
-- 1 of 9 --
2.1.2.1. The contractor shall inspect the subfloor for any damage,
holes, cracks, or uneven areas.
2.1.2.2. The contractor shall make necessary repairs to the subfloor
using material recommended by the laminate vinyl flooring
manufacturer to ensure a level and smooth surface for
installation. Contractor shall assume approximately 450 SF of
repairs necessary within bid-price.
2.1.2.3. The subfloor shall be cleaned of all debris and dust before the
installation begins.
2.1.3. Installation of Laminate Vinyl Flooring approximately 2231 SF:
2.1.3.1. Contractor shall submit a list of products with colors for Coast
Guard selection. Products shall meet the following minimum
requirements:
2.1.3.1.1. Luxury plank laminate vinyl tile (LVT)
2.1.3.1.2. Click-lock connection
2.1.3.1.3. Embossed low gloss
2.1.3.1.4. Painted bevel edge
2.1.3.1.5. Minimum 6.5 mm thick
2.1.3.1.6. 100% waterproof
2.1.3.1.7. Easy to clean and maintain
2.1.3.1.8. No-wax flooring
2.1.3.1.9. Wet and steam mop approved
2.1.3.1.10. Acrylic surface coating for scratch and stain resistance
2.1.3.1.11. Pre-attached underlayment
2.1.3.1.12. Anti-microbial treatment to inhibit the growth of odor and
stain causing mold and mildew on the top surface
2.1.3.1.13. Rigid core technology
2.1.3.2. The flooring shall be installed according to the manufacturer's
instructions.
2.1.3.3. New quarter-round molding and transition strips shall be
installed where necessary to ensure a clean and finished look.
2.2. Interior Painting: Interior Painting: Areas indicated in Floor Plan 2.
Approximately 5300 SF.
2.2.1. Surface Preparation:
2.2.1.1. All surfaces to be painted will be prepared by cleaning,
scraping, sanding, and patching any holes or cracks.
-- 2 of 9 --
2.2.1.2. All furniture, equipment, and flooring will be covered and
protected from paint.
2.2.1.3. The contractor shall take necessary precautions for dust
control, especially if any sanding is required.
2.2.2. Painting:
2.2.2.1. Apply a minimum of two coats of Interior Semi-Gloss Low VOC
paint in the color selected by the US Coast Guard. Submit paint
choices to the Coast Guard.
2.2.2.2. The paint will be applied evenly, without drips, sags, or brush
marks.
2.2.2.3. The scope of painting includes all interior walls within the
designated office spaces.
3. DESIGNATED CONTRACTING OFFICER’S REPRESENTATIVE
The designated Contracting Officer Technical Representatives (COTR) and
Points of Contact for this project are Aleta Beekmann and LCDR Bethany
Stafford.
4. CONDITIONS AFFECTING THE WORK
4.1. The contractor should visit the site and take such other steps as
may be reasonably necessary to ascertain the nature and location of the
work, the general and local conditions which can affect the cost of the
work thereof.
The government will assume no responsibility for any misunderstanding
or misrepresentations concerning conditions made by any of its officers or
agents prior to the execution of the contract, unless included in the request
for quotes, the specification or related documents.
4.2. Site Management: The contractor shall assign a single point of
contact for all project communications. The contractor is responsible for
the daily cleanup of the work area, including the removal of all
construction debris. The work area must be left in a clean and safe
condition at the end of each day.
The contractor shall ensure that an employee is designated onsite to
serve as the primary point of contact for the government . This individual
shall be able to speak on behalf of the contractor or have immediate
-- 3 of 9 --
access to a responsible representative for the contractor.
4.3. Furniture and Equipment: The contractor is responsible for
carefully moving any office furniture and equipment necessary to perform
the work. All items will be returned to their original location upon
completion of the work in that area. No additional storage will be provided
by the government for this furniture – contractor shall phase work to
accommodate furniture moving.
4.4. Safety: The contractor will adhere to all applicable safety
regulations.
4.5. Change Orders: Any changes to this Scope of Work must be
documented in a written change order signed by the contracting officer
before the additional work begins.
5. CONTINUITY OF FACILITIES OPERATION
Contractor is responsible for minimizing impact to the Coast Guard’s operations.
Contractor shall work with COTR to determine least impactful schedule.
6. CHANGES IN WORK
No oral statement of any person shall in any manner or degree modify or otherwise
affect the terms of this contract. Changes in the work may only be accomplished
after the execution of the contract through issuance of a contract modification . A
contract modification shall be based upon the agreement of the change in work by
the contractor, COTR, and the contracting officer. A modification is a document
describing the change in the work, appropriate co…