Skip to content

Open for responses

REPLACE RADIANT HEATING SYSTEM AND EXHAUST FAN, BLDG. 362 DAM NECK ANNEX, VIRGINIA BEACH, VA

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
N4008527R0037
NAICS
236220
PSC
Z2AZ
Set-aside
Small Business Set Aside - Total
Posted
November 18, 2026
Response due
December 15, 2026

Description

***UNCLASSIFIED*** eProjects WO#: 1876185 BUILDING 362 REPLACE RADIANT HEATING SYSTEM & EXHAUST FAN At the Naval Air Station Oceana, Dam Neck Annex Virginia Beach, Virginia PREPARED BY: NAVFAC MID-ATLANTIC, PWD OCEANA FEAD, PM&E PRA21B2/21B3 NAS Oceana, 953 Hornet Drive, Building 820, Suite 210 Virginia Beach, Virginia 23460-2197 REQUEST FOR PROPOSAL (RFP) PREPARED BY: DM (Design Manager): Kraig Sarver, PE Architectural: Alok Anil, RA Structural: Jason Picano, PE Mechanical: Kraig Sarver, PE Electrical: Chris T. Olwin, PE Fire Protection: Mark Bowen, PE REQUEST FOR PROPOSAL (RFP) APPROVED BY: Design Engineering Branch Manager: Scott D. McPeek, RA Signature/Date: Submitted By: Scott D. McPeek, RA Date: 14 September 2025 -- 1 of 182 -- BUILDING 362 – REPLACE RADIANT HEATER SYSTEM & EXHAUST FAN eProjects WO#: 1876185 NAS OCEANA, DAM NECK ANNEX, VIRGINIA BEACH, VIRGINIA TABLE OF CONTENTS TABLE OF CONTENTS PART 1 – CONTRACT CLAUSES (Provided by Contracting Officer) PART 2 – GENERAL REQUIREMENTS PART 3 – STATEMENT OF WORK / PROJECT PROGRAM PART 4 – MINIMUM MATERIALS, ENGINEERING AND CONSTRUCTION REQUIREMENTS PART 5 – PRESCRIPTIVE SPECIFICATIONS (Section 01 32 16.00 20 – SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES) (Section 01 35 26.05 20 – GOVERNMENT REQUIREMENTS FOR DESIGN-BUILD) PART 6 – ATTACHMENTS LOCATION MAP EQUIPMENT INVENTORY FORM RECORD OF ENVIRONMENTAL DECISION CONCEPT PLAN CONTRACTOR’S SUBMITTAL TRANSMITTAL REFERENCE DRAWINGS -- 2 of 182 -- E n g i n e e r i n g D e p a r t m e n t eProjects WO#: 1876185 PART 2 – GENERAL REQUIREMENTS BUILDING 362 – REPLACE RADIANT HEATING SYSTEM & EXHAUST FAN NAS OCEANA, DAM NECK ANNEX VIRGINIA BEACH, VIRGINIA -- 3 of 182 -- Building 362 – Replace Radiant Heating System & Exhaust Fan Work Order Number 1876185 NAS Oceana, Dam Neck Annex, Virginia Beach, VA PART 2 GENERAL REQUIREMENTS - Page 1 Part 2 General Requirements PART 2 GENERAL REQUIREMENTS TABLE OF CONTENTS 1/20 • 00 00 00 GENERAL REQUIREMENTS • 01 11 00 SUMMARY OF WORK • 01 14 00.05 20 WORK RESTRICTIONS • 01 20 00.05 20 PRICE AND PAYMENT PROCEDURES • 01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS • 01 31 19.05 20 POST AWARD MEETINGS • 01 32 16.00 20 SMALL PROJECT DESIGN AND CONSTRUCTION PROGRESS SCHEDULES • 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES • 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES • 01 35 26.05 20 GOVERNMENT SAFETY REQUIREMENTS FOR DESIGN BUILD • 01 45 00.05 20 DESIGN AND CONSTRUCTION QUALITY CONTROL • 01 50 00.05 20 TEMPORARY FACILITIES AND CONTROLS • 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS • 01 74 19 CONSTRUCTION AND WASTE MANAGEMENT AND DISPOSAL • 01 78 00 CLOSEOUT SUBMITTALS 00 00 00 GENERAL REQUIREMENTS 1.1 Definitions As used throughout the contract, the following terms have the meaning set forth below: Contracting Officer (KO): The individual designated to administer the contract. Throughout this contract this individual will be responsible and possess the authority to act on behalf of the Government with respect to the specific contract. Contracting Officer Representative (COR): The individual designated by the Contracting Officer as the authorized representative of the Contracting Officer. The COR is responsible for monitoring performance and technical management of the effort required and should be contacted regarding -- 4 of 182 -- Building 362 – Replace Radiant Heating System & Exhaust Fan Work Order Number 1876185 NAS Oceana, Dam Neck Annex, Virginia Beach, VA PART 2 GENERAL REQUIREMENTS - Page 2 questions or problems of a technical nature. Contract: Contract or task order. Contractor: The term Contractor refers to both the prime Contractor and all subcontractors, whether in contract with the Prime Contractor or other subcontractors at any tier, including the Designer of Record. Designer of Record (DOR): Licensed architect/engineer working as subcontractor to or partner with prime Contractor who provides design for this contract. Quality Control (QC): Contractor's system to control the quality of design, material, equipment and construction. Quality Assurance (QA) Program: Government's program to evaluate the effectiveness of the Contractor's quality control. The Government's QA Program is not a substitute for the Contractor's QC Program. Federal Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day. 1.2 Accessibility Provide barrier-free design in accordance with UFC 1-200-01, DoD Building Code. 1.3 Changes No oral statement by any person other than the Contracting Officer, as provided in the Federal Acquisition Regulation (FAR) clause 52.243-5 entitled, "CHANGES AND CHANGED CONDITIONS," will in any manner or degree modify or otherwise affect the terms of this contract. 1.4 No Waiver by the Government The failure of the Government in any one or more instances to insist upon strict performance to any of the terms of this contract or to exercise any option herein conferred is not to be construed as a waiver or relinquishment to any extent of the right to assert or rely upon such terms or options on any future occasion. 1.5 Equitable Adjustments a. Whenever the Contractor submits a claim for equitable adjustment under a clause which provides for equitable adjustment of the contract, such claim must include all types of adjustments in the total amounts to which the clause entitles the Contractor, including, but not limited to, adjustment arising out of delays or disruptions. b. Except as the parties may otherwise expressly agree, the Contractor must be deemed to have waived: (1) any adjustments to which he otherwise might be entitled under the clause where such claim fails to request such adjustments; and (2) any increase in the amount of equitable adjustments additional to those requested in its claim. c. If required by the Contracting Officer, the Contractor agrees to execute a release, in form and substance satisfactory …

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 236220