Request for Information for PFAS Contaminated Soil Disposal Services

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
PDPG262400
NAICS
562910
PSC
F108
Posted
July 16, 2026
Response due
July 27, 2026
Place of performance
LINDA, CA

What this opportunity is

The Department of Defense is seeking information from potential sources for PFAS contaminated soil disposal services, specifically for the WMWD Sewer Rehabilitation Project at March ARB, CA. This opportunity is suitable for small businesses with NAICS code 562910, which includes hazardous waste disposal services. The notice type is a Sources Sought, indicating that the government is seeking information from potential sources rather than issuing a formal solicitation, and interested parties should track the opportunity for future updates.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

STATEMENT OF WORK WMWD Sewer Rehabilitation Project - PFAS Groundwater Contamination MARCH ARB, CA 1 CUI CUI STATEMENT OF WORK FOR WMWD Sewer Rehabilitation Project - PFAS Groundwater Soil Contamination PROJECT NO: PDPG26-2400 452d CIVIL ENGINEER SQUADRON 452d MISSION SUPPORT GROUP June 1, 2026 -- 1 of 5 -- STATEMENT OF WORK WMWD Sewer Rehabilitation Project - PFAS Groundwater Contamination MARCH ARB, CA 2 CUI CUI TABLE OF CONTENTS PART 1 - INTRODUCTION ........................................................................................................................... 3 1.1 SCOPE ......................................................................................................................................................... 3 1.2 O N -SITE HANDLING AND S TORAGE ...................................................................................................................... 3 1.2.1 Stockpile Control 1.2.2 Non-RCRA contaminated soil ................................................................................................................. 3 1.2.3 Air Monitoring 1.3 TESTING AND CLASSIFICATION ............................................................................................................................ 3 1.3.1 RCRA Hazardous .................................................................................................................................... 3 1.3.2 California Hazardous (Non-RCRA). ......................................................................................................... 4 1.4 TRANSPORTATION AND TRACKING............................................................................................................. 4 1.4.1 Hazardous Waste Manifest ................................................................................................................... 4 1.4.2 Licensed Haulers .................................................................................................................................... 4 1.4.3 Vehicles .................................................................................................................................................. 4 PART 2 - ADMINISTRATIVE AND MANAGERIAL REQUIREMENTS ................................................................. 4 -- 2 of 5 -- STATEMENT OF WORK WMWD Sewer Rehabilitation Project - PFAS Groundwater Contamination MARCH ARB, CA 3 CUI CUI PART 1 - INTRODUCTION This Statement of Work (SOW) defines the requirements for construction disposal services at March ARB, CA. The Contractor shall provide all equipment, labor, and supervision necessary for PDPG26-2400 WMWD Sewer Rehabilitation Project - PFAS Groundwater Soil Contamination disposal at March Air Reserve Base, California in accordance with the terms and conditions of the contract, contract statement of work contract specifications, federal, state, and local codes, laws, and regulations. All quantities, dimensions and areas given within the statement of work are approximation only. Contractor is responsible to verify all quantities, dimensions, and areas. Work shall include, but is not limited to the following: 1.1 SCOPE This SOW defines the scope for this task order to dispose of PFAS contaminated soil. Work shall be in accordance with Air Force technical guidelines and regulatory requirements. 1.2 ON-SITE HANDLING AND STORAGE To prevent cross-contamination and runoff during excavation, sites must follow best management practices: 1.2.1 Stockpile Control: Soil piles must be covered with plastic sheeting or tarps and surrounded by berms. 1.2.2 Non-RCRA contaminated soil can only be accumulated on-site for up to 90 days on impermeable surfaces (like HDPE liners) before transport. 1.2.3 Air Monitoring: Dust and air quality must be continuously monitored during excavation and loading. 1.3 TESTING AND CLASSIFICATION Prior to disposing of any soils taken from the construction site, obtain samples representative of possible PFAS. Do not transport material from the project site either for reuse or disposal until tests have been approved. Positive test soils to be removed off site in accordance with Resource Conservation and Recovery Act (RCRA) guidelines for off-site disposal. Excavated soil must be analyzed at a certified laboratory to determine its hazard classification: 1.3.1 RCRA Hazardous: Exceeds federal EPA toxicity thresholds (e.g., highly toxic, corrosive, or reactive). Must be disposed of in a specialized Class I hazardous waste landfill. -- 3 of 5 -- STATEMENT OF WORK WMWD Sewer Rehabilitation Project - PFAS Groundwater Contamination MARCH ARB, CA 4 CUI CUI 1.3.2 California Hazardous (Non-RCRA): Contains specific chemicals (like aerially deposited lead or petroleum hydrocarbons) at levels exceeding California's Title 22 limits. 1.4 TRANSPORTATION AND TRACKING Moving hazardous dirt off-site requires strict logistical and legal tracking. 1.4.1 Hazardous Waste Manifest: All shipments must be documented using the state's tracking system. 1.4.2 Licensed Haulers: Soil must be hauled by registered hazardous waste transporters. 1.4.3 Vehicles: Transport trucks must be decontaminated before leaving the site to prevent off-site tracking of hazardous material. PART 2 - ADMINISTRATIVE AND MANAGERIAL REQUIREMENTS The Contractor shall provide management, planning, performance measurement, and cost status reporting pertinent to the performance of the requirements identified in this SOW. Governing Codes, Criteria, Regulations and Industry Guidance. Contractor shall comply with the following: All applicable federal, state, and local statutes, instructions, manuals, handbooks, regulations, guidance, policy letters, and rules (including all changes and amendments), and Presidential Executive Orders, pertaining to the work. It is contractor responsibility to know the requirements of the latest editions and changes and follow the requirements. Contractor must raise any question

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 562910)