1.0 PURPOSE & OBJECTIVE
PAE Maritime, on behalf of the dPAE Combatants/ DDG 1000 Class Program Office (PMS 500), is conducting market research to assess industry capabilities, engineering rigor, and shipyard infrastructure necessary to accomplish the industrial integration and installation of the Large Missile Vertical Launch System (LMVLS) aboard the USS Michael Monsoor (DDG 1001).
The primary objective of this RFI is to evaluate prospective offerors' specific technical expertise, dry dock/pier-side heavy-lift capabilities, dimensional control methodologies, and integrated production scheduling to execute the installation of a pre-manufactured ~600-ton LMVLS module and associated Conventional Prompt Strike (CPS) warfare alterations.
The questions contained in Section 3.0 are specifically structured to allow industry respondents to demonstrate their understanding of the unique structural, spatial, lifting, and combat systems complexities associated with this depot modernization period.
2.0 TECHNICAL BASELINE & REQUIREMENT SUMMARY
Key technical parameters within the DDG 1001 CPS DMP include:
2.1 Ship Particulars
Vessel: USS Michael Monsoor (DDG 1001)
Length Overall (LOA) / LBP: 186 m (610 ft) / 182.9 m (600 ft)
Beam (Maximum): 24.6 m (80.7 ft)
Draft (Navigational / DWL): 8.4 m (27.6 ft) / 7.0 m (23.0 ft)
Hull Form & Superstructure: Wave-piercing tumblehome hull; steel hull structure with composite deckhouse; integrated power system (IPS).
2.2 LMVLS Pre-Manufactured Assembly Profile (GFM)
The Government plans to deliver the LMVLS as Government-Furnished Material (GFM) as a fully out-fitted, pre-manufactured modular block. The industrial effort will require rigging, lifting, transferring, lowering, and setting the ~600-ton LMVLS module into the hull pocket within tight spatial and angular tolerances. Additional specifications include:
Envelope Dimensions: Approximately 44’ 7” Length × 20’ 8” Width × 41’ 1” Height.
Total Lift Weight: Approximately 600 Long Tons (LT) .
Component Integration: Four (4) launch tubes housing Advanced Payload Modules (APMs) and All-Up Round Canisters (AUR-C), integral shock-isolation foundation assemblies, multi-level bulkheads (down through L5), decks, pre-installed outfitting, and weather deck / 01-level hatch structures.
Installation Location: Forward Stack 1400 (reclaimed forward space following MT 61 AGS complete removal).
3.0 TECHNICAL CAPABILITY QUESTIONNAIRE
Interested sources are requested to provide detailed technical narrative responses, supported by engineering calculations, facility specifications, past performance references, and risk mitigation methodologies, addressing each section below.
Section A: Heavy Lift, Rigging & Facility Engineering Capabilities
Lifting Infrastructure & Capacities:
Detail your primary crane assets (gantry, floating, portal, or crawler) capable of hoisting and swinging a 600-ton (approx. 1,344,000 lbs) rigid modular assembly.
Provide the specific crane load charts demonstrating rated capacity at the required operating radius and minimum hook height necessary to clear DDG 1001’s deck edge, bulwarks, and adjacent deckhouse structures (taking into account the 41’ 1” module height plus lifting beam/spreader bar rigging height).
If utilizing a floating crane for the LMVLS, confirm that the selected crane has the clearance to transit under any bridges necessary to arrive at your shipyard.
Specify whether the 600-ton lift will be executed in dry dock or pier-side , and detail the structural load-bearing capacity (pounds per square foot / ground bearing pressure) of the quay wall, pier apron, or dry dock wing walls supporting the crane footprint during maximum outrigger or track loadings.
Rigging, Stability & Tandem Operations:
Describe your concept for the lift rigging assembly (spreader frames, equalizing grommets, dynamic load monitoring systems) to eliminate torsional deflection, racking, and localized stress concentrations on the pre-assembled LMVLS module during the pick.
If a tandem or multi-crane lift is planned, provide your operational methodology for synchronous motion, hook travel rate synchronization, and emergency load re-distribution mitigation.
Address environmental limits: What are your maximum allowable wind speed, wave/surge motion (if using floating derrick/crane barges), and tidal envelopes for executing this precision lift?
Ship Mooring, Ballast & Hull Stability During Module Placement:
DDG 1001 possesses a unique wave-piercing tumblehome form with strict naval architectural stability limitations. Describe your approach to calculate, model, and monitor ship list, trim, draft changes, and metacentric height during the removal of the forward AGS weight and subsequent setting of the 600-ton LMVLS module (whether afloat at a pier or during block contact in dry dock).
Section B: Precision Alignment, Metrology & Structural Integration
Dimensional Control & Metrology Framework:
The LMVLS module must interface with existing ship structure, pre-established shock-attenuation foundations, and tight topside radar cross-section (RCS) deck tolerances. Describe your advanced metrology procedures (e.g., 3D laser scanning, photogrammetry, laser tracking) from initial ship condition surveying through pre-lift verification and final post-weld alignment.
Section C: Industrial Coordination, Schedule Phasing & AIT Co-Existence
Integration of Alteration Installation Teams (AIT) & System OEMs:
Installation of the CPS LMVLS requires extensive concurrent work by Government labs and weapon system prime contractors (e.g., Raytheon, Lockheed Martin, NAVWAR).
Detail your approach for managing space conflicts, shared lifting/crane services, security access controls for classified weapon compartments, and jurisdictional…