Skip to content

Open for responses

RFI: AN/APY-1/2 E-3 surveillance radar 5-Volt Power Supply

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
FA8539-6130014513046CW
NAICS
334511
PSC
6130
Posted
November 5, 2026
Response due
December 6, 2026

What this opportunity is

The Department of Defense is seeking sources to repair the AN/APY-1/2 E-3 surveillance radar 5-Volt Power Supply, specifically NSN 6130014513046CW. This opportunity is suitable for small businesses with expertise in avionics repair, particularly those familiar with the required technical standards and quality assurance processes. As this is a Sources Sought notice, interested parties should focus on demonstrating their capabilities rather than submitting formal bids at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

PR: FD2060-25-00897 PWS REVISION: 0 1 Performance Work Statement for APY-1/2 5-Volt Power Supply Repair Purchase Request: FD2060-25-00897 4 Aug 2025 -- 1 of 7 -- PR: FD2060-25-00897 PWS REVISION: 0 2 1.0 Description of Services 1.1 Objective(s): This Performance-Based Work Statement (PWS) describes the services required to repair the AN/APY-1/2 5-Volt Power Supply avionics component. These services require the Contractor to accomplish repair of designated National Stock Number (NSN) observing accepted quality standards and relevant technical standards. The Contractor shall also track and resolve items affected by Product Quality Deficiency Reports (PQDR) and promptly provide serviceable assets within the established Turn Around Time (TAT). The Contractor shall also provide timely and accurate reporting in Commercial Asset Visibility Air Force (CAVAF) system. 1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by maintaining the APY-1/2 to provide a continued flow of serviceable assets to the warfighter thus increasing the mission capable rate and reliability of the weapon system. The continued operational availability and reliability of the APY-1/2 is critical to support the current mission requirement of the E-3 Airborne Warning and Control System (AWACS) aircraft. This effort will ensure availability levels are maintained. Continued repair and availability of this system is critical. 1.3 Background: This PWS tasks the Contractor to provide depot repair of specified APY-1/2 Radar system hardware, NSN 6130014513046CW and part number PS12295. 2.0 Services Summary Performance Objective PWS Reference Performance Threshold Quality of repair 4.4 There shall be no more than 1 PQDR for this Contract. Delivery of repair 4.5 The Turnaround Time (TAT) is 45 calendar days for repair at a rate not required to exceed 3 per month. There shall be no more than one late delivery for this contract. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by a revised delivery date acceptable to the Government. CAV-AF reporting 4.3.3 The Contractor shall report production in CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur. 3.0 Government Property -- 2 of 7 -- PR: FD2060-25-00897 PWS REVISION: 0 3 3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order. 3.2 Government Property to be Provided: Government property to be provided includes reparable E-3 APY1/2 Power Supply NSN 6130-01-451-3046CW. No Government property will be provided except the units delivered to the Contractor for repair. 3.3 Reporting of Government Property: The Contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) Government property in its possession in accordance with FAR 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil, as stipulated by DFARS 252.245-7005. This reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract. GFP training and guidance is located at the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/. 3.4 Loss of Government Property 3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator. 3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/. 3.5 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract. 4.0 Technical Requirements -- 3 of 7 -- PR: FD2060-25-00897 PWS REVISION: 0 4 4.1 Period and Place of Performance 4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order will extend 1 year. 4.1.2 Place of Performance: These services will be performed at the Contractor’s facili…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 334511