The Department of Defense is seeking sources to repair the AN/APY-1/2 E-3 surveillance radar 5-Volt Power Supply, specifically NSN 6130014513046CW. This opportunity is suitable for small businesses with expertise in avionics repair, particularly those familiar with the required technical standards and quality assurance processes. As this is a Sources Sought notice, interested parties should focus on demonstrating their capabilities rather than submitting formal bids at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PR: FD2060-25-00897 PWS REVISION: 0 1
Performance Work Statement
for
APY-1/2 5-Volt Power Supply Repair
Purchase Request: FD2060-25-00897
4 Aug 2025
-- 1 of 7 --
PR: FD2060-25-00897 PWS REVISION: 0 2
1.0 Description of Services
1.1 Objective(s): This Performance-Based Work Statement (PWS) describes the services
required to repair the AN/APY-1/2 5-Volt Power Supply avionics component. These services
require the Contractor to accomplish repair of designated National Stock Number (NSN)
observing accepted quality standards and relevant technical standards. The Contractor shall also
track and resolve items affected by Product Quality Deficiency Reports (PQDR) and promptly
provide serviceable assets within the established Turn Around Time (TAT). The Contractor
shall also provide timely and accurate reporting in Commercial Asset Visibility Air Force
(CAVAF) system.
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States
Air Force (USAF) by maintaining the APY-1/2 to provide a continued flow of serviceable assets
to the warfighter thus increasing the mission capable rate and reliability of the weapon system.
The continued operational availability and reliability of the APY-1/2 is critical to support the
current mission requirement of the E-3 Airborne Warning and Control System (AWACS)
aircraft. This effort will ensure availability levels are maintained. Continued repair and
availability of this system is critical.
1.3 Background: This PWS tasks the Contractor to provide depot repair of specified APY-1/2
Radar system hardware, NSN 6130014513046CW and part number PS12295.
2.0 Services Summary
Performance Objective PWS
Reference
Performance Threshold
Quality of repair 4.4 There shall be no more than 1 PQDR for this
Contract.
Delivery of repair 4.5 The Turnaround Time (TAT) is 45 calendar days for
repair at a rate not required to exceed 3 per month.
There shall be no more than one late delivery for this
contract. The Contractor shall notify the Government
if the delivery of any asset will not meet the
scheduled delivery date and negotiate a revised
delivery date. The late asset shall be delivered by a
revised delivery date acceptable to the Government.
CAV-AF reporting 4.3.3 The Contractor shall report production in CAV-AF.
The Contractor shall provide data on the actions
conducted for each unit. The Contractor shall report
as actions occur.
3.0 Government Property
-- 2 of 7 --
PR: FD2060-25-00897 PWS REVISION: 0 3
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in
accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.
3.2 Government Property to be Provided: Government property to be provided includes
reparable E-3 APY1/2 Power Supply NSN 6130-01-451-3046CW. No Government property
will be provided except the units delivered to the Contractor for repair.
3.3 Reporting of Government Property: The Contractor shall have a system of internal controls
to manage (control, use, preserve, protect, repair, and maintain) Government property in its
possession in accordance with FAR 52.245-1, and its property management system shall be
adequate to satisfy the requirements of this clause. The contractor shall record receipt and return
of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption,
disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise
Environment (PIEE), https://piee.eb.mil, as stipulated by DFARS 252.245-7005. This reporting
requirement does not change any liability provisions or other reporting requirements that may
exist under the contract. GFP training and guidance is located at the DoD Procurement Toolbox
at https://dodprocurementtoolbox.com/.
3.4 Loss of Government Property
3.4.1 Definition of Loss of Government Property: “Loss of Government property” means
unintended loss of or damage to Government property including property that cannot be found
after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft,
damage requiring repair to restore the item to usable condition, or damage that renders the
property useless for its intended purpose or Beyond Economical Repair (BER). Loss of
Government property does not include manufacturing defects, obsolescence, normal wear and
tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of
Government property does not include normal and reasonable inventory adjustments, i.e., losses
of low priority consumable material, such as common hardware, as agreed to by the Contractor
and the Government Property Administrator.
3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government
property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.
3.5 Return or Retention of Government Property: All property provided by the Government
remains the property of the Government and shall be returned to the Government as directed, but
no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO)
directs the Contractor to retain the property for continued use under a successor contract. All
Government property shall be returned to the Government in the condition provided unless
approved in advance by the PCO. All material generated under the contract/order becomes the
property of the Government and shall be returned to the Government as directed, but no later
than completion of the contract/order, unless the PCO directs the Contractor to retain the
material for continued use under a successor contract.
4.0 Technical Requirements
-- 3 of 7 --
PR: FD2060-25-00897 PWS REVISION: 0 4
4.1 Period and Place of Performance
4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order
will extend 1 year.
4.1.2 Place of Performance: These services will be performed at the Contractor’s facili…