What this opportunity is
The Department of Agriculture is seeking a contractor to replace 4” asbestos cement water pipes with 4” HDPE water mains in the Flaming Gorge Ranger District of Utah. This project is set aside for small businesses and involves installing approximately 4,450 linear feet of new pipeline, covering existing lines, and installing associated valves and drains. Interested contractors should note that this is a combined synopsis/solicitation, indicating they will need to track the opportunity closely rather than submit a formal bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Section C - Description/Specifications/Statement of Work
GENERAL SPECIFICATIONS
Final – 07/01/2026
SCOPE OF CONTRACT
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals.
The work includes;
Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source.
Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source.
Installation of 2 combination air-vacuum valves with utility boxes.
Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
PROJECT LOCATION
The project is located in the Flaming Gorge Ranger District of the Ashley National Forest, Daggett County, Utah, in Section 52, T 2 N, R 21 E. It is located approximately 25 miles southwest of Manila, Utah. The project may be accessed from State Highway 44 and Forest Road 095 (Red Canyon Road).
SITE INFORMATION AND LIMITATIONS
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
Construction sites will be closed to the public during construction. The Forest Service will issue a closure order to the public to include the unimproved access road along the pipeline route. The Contractor will be responsible for signing and limiting public access.
The Red Canyon Visitor Center and associated parking area will remain open to the public during construction activities. The Contractor will be responsible for providing temporary fencing or other barrier to separate public use areas from construction activities within the closure area.
Contractor will provide all materials and labor necessary to protect streams, wet or dry, during construction activities. The Contractor will be required to submit a stream protection plan and receive approval from the COR, in writing, prior to the beginning of construction.
All construction equipment shall be pressure-washed before entering National Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.
Utilities are not available at the site for construction purposes.
The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work.
TRAFFIC CONTROL AND CONSTRUCTION SIGNING
No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the Contracting Officer. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
WORK CAMPS, STAGING AND STORAGE AREAS
Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site.
No overnight camping will be allowed on site.
INSPECTION OF WORKSITE
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
START DATE
Spring 2027
CONTRACT TIME
90 Calendar Days
SPECIFICATIONS
The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.
SECTION 010250 - CONSTRUCTION STAKING
SECTION 011250 - MEASUREMENT AND PAYMENT
SECTION 011900 - MOBILIZATION
SECTION 013300 - SUBMITTAL PROCEDURES
SECTION 014100 - QUALITY CONTROL
SECTION 015500 - GOVERNMENT FURNISHED MATERIALS (GFM)
SECTION 022450 - GRADING
SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES
SECTION 024100 - WASTE MATERIAL DISPOSAL
SECTION 024102 - REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS
SECTION 033020 - CONCRETE FROM PACKAGED DRY MIX FOR MINOR STRUCTURES
SECTION 133402 - UTILITY BOXES
SECTION 221100 - WATER DISTRIBUTION SYSTEMS
SECTION 221102 - CURB VALVES AND BOXES
SECTION 221103 - PLUMBING APPURTENANCES
SECTION 311000 - CLEARING AND GRUBBING
SECTION 312000 - EARTHWORK
SECTION 312010 - SELECT BORROW
SECTION 312100 - PROJECT SITE PREPARATION AND GRADING
SECTION 312225 - EXCAVATION & EMBANKMENT
SECTION 330530 - UTILITY LOCATING SYSTEM
END OF SECTION C
July 2026
USDA FOREST SERVICE, R4
SECTION 010250 - CONSTRUCTION STAKING
GENERAL
SUMMARY
This work shall consist of the construction staking of roads, parking lots, parking spurs, family units, tent pads, paths, stairways, culverts, retaining walls, buildings, and utilities in accordance with the Drawings and Specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation and other incidentals necessary to complete the construction staking in accordance with these specif…
Source: SAM.gov, as posted. Verify the current solicitation before responding.