Royal Saudi Land Forces CH-47F and UH-60M Flight Training Devices
DEPT OF DEFENSE
Notice type
Presolicitation
Solicitation #
W900KKSAUCH47UH60FT-PRESOL
NAICS
333310
PSC
6910
Posted
November 5, 2026
Response due
November 18, 2026
Place of performance
Saudi Arabia
What this opportunity is
The Department of Defense is seeking industry feedback on a draft Statement of Work for the Royal Saudi Land Forces' CH-47F and UH-60M Flight Training Devices, with an anticipated funding of $58 million. This presolicitation notice is aimed at U.S. contractors, particularly those eligible for defense contracts under NAICS 333310. Interested small businesses should note that this is not a formal solicitation; rather, it serves as a precursor to potential future bidding opportunities, and participation in the pre-solicitation conference is encouraged for further clarification.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
UNCLASSIFIED
SOW 2025-026
28 Oct 2026
Version 0.4
i
UNCLASSIFIED
STATEMENT OF WORK
FOR
KINGDOM OF SAUDI ARABIA
ROYAL SAUDI LAND FORCES AVIATION CORPS
CH-47F AND UH-60M FLIGHT TRAINING DEVICES
PROJECT MANAGEMENT
X____________________________________________
Concurrence: Joseph Orsi
Product Lead, International Training, Simulation, Sustainment, and Live (IT2SL) -
Simulation
U.S. Army Capability Program Executive Simulation, Training, Test & Threat (CPE ST3)
12211 Science Drive
Orlando, FL 32826-3276
DRAFT
-- 1 of 67 --
UNCLASSIFIED
SOW 2025-026
28 Oct 2026
Version 0.4
ii
UNCLASSIFIED
TABLE OF CONTENTS
1 SCOPE ................................................................................................................................ 1
1.1 Non-Personal Services .................................................................................................... 2
1.2 Organizational Conflict of Interest .................................................................................... 2
2 APPLICABLE DOCUMENTS ............................................................................................... 3
2.1 United States Government Documents ............................................................................ 3
2.2 Non-Government Documents........................................................................................... 4
2.3 Availability of USG Documents and Non-Government Documents................................... 4
3 REQUIREMENTS ................................................................................................................ 5
3.1 Program Management ..................................................................................................... 5
3.1.1 Integrated Master Schedule (IMS) .............................................................................. 5
3.1.2 Contractor Status Reporting ....................................................................................... 6
3.1.3 Document Review and Collaboration Site ................................................................... 7
3.1.4 Risk and Opportunity Management ............................................................................. 7
3.1.5 Configuration Management (CM) ................................................................................ 8
3.1.6 Engineering Change Proposals (ECP) ........................................................................ 9
3.1.7 Meeting Minutes ......................................................................................................... 9
3.1.8 Program Execution Methodology .............................................................................. 10
3.1.9 Key Personnel .......................................................................................................... 10
3.2 Meetings and Reviews ................................................................................................... 11
3.2.1 Integrated Product Team (IPT) Meetings .................................................................. 11
3.2.2 Working Group (WG) Meetings ................................................................................. 12
3.2.3 Post Award Conference (PAC) ................................................................................. 13
3.2.4 System Requirements Review (SRR) ....................................................................... 13
3.2.5 Preliminary Design Review (PDR) ............................................................................ 14
3.2.6 Critical Design Review (CDR) ................................................................................... 16
3.2.7 Test Readiness Review (TRR).................................................................................. 17
3.2.8 Program Management Review (PMR) ...................................................................... 18
3.3 Systems Engineering ..................................................................................................... 19
3.3.1 Requirements Traceability ........................................................................................ 19
3.3.2 Interface Control ....................................................................................................... 20
3.3.3 Interoperability .......................................................................................................... 20
DRAFT
-- 2 of 67 --
UNCLASSIFIED
SOW 2025-026
28 Oct 2026
Version 0.4
iii
UNCLASSIFIED
3.3.4 Hardware Engineering .............................................................................................. 22
3.3.5 Software Engineering ............................................................................................... 22
3.3.6 Hardware and Software Integration .......................................................................... 24
3.3.7 Safety Engineering ................................................................................................... 25
3.3.8 Cybersecurity............................................................................................................ 25
3.4 Test and Evaluation (T&E) ............................................................................................. 27
3.4.1 Problem Reporting System (PRS) ............................................................................ 28
3.4.2 Problem Review Board (PRB) .................................................................................. 28
3.4.3 Discrepancy Report (DR) Categories ........................................................................ 28
3.4.4 Test Authority ........................................................................................................... 29
3.4.5 Test Resources and Facilities ................................................................................... 29
3.4.6 Contractor Verification Testing (CVT) ....................................................................... 29
3.4.7 Government Acceptance Testin…