Open for responses
Service Air System Revitalization
DEPT OF DEFENSE
Notice type
Sources Sought
Solicitation #
FA9101_Service_Air_System_Revitalization
NAICS
333912
PSC
4310
Posted
November 17, 2026
Response due
November 25, 2026
Place of performance
0, TN
Description
17416-26-001
SOO No: 17416-26-001
27 October 2026
NOT SENSITIVE
IRA-26-2125
Page 1 of 6
STATEMENT OF OBJECTIVES (SOO)
FOR
SERVICE AIR SYSTEM REVITALIZATION
1.0 PURPOSE
The purpose of this project is to revitalize a Service Air System at the Arnold Engineering
Development Complex (AEDC), located at Arnold Air Force Base, Tennessee. The current service
air infrastructure has experienced reduced reliability and capacity due to aging equipment. The
goal of this revitalization is to deliver a fully operational, safe, energy-efficient, and modernized
compressed air and dry air network. This will be achieved through the engineering, design,
procurement, installation, and commissioning of new Ingersoll-Rand (IR) compressed air
equipment, alongside the refurbishment and integration of existing system components.
2.0 SCOPE
The scope of this initiative encompasses the engineering, system design, procurement, delivery,
installation, integration, refurbishment, and commissioning of new and existing service air assets
across three primary facility locations:
• Building 541
• Building 913
• Building 878
This program entails replacing eleven (11) obsolete IR air compressors, replacing one (1) IR
desiccant dryer, relocating and reinstalling an existing compressor, refurbishing six (6) existing IR
desiccant dryers, and upgrading associated electrical, piping, and condensate management
infrastructure.
3.0 BACKGROUND
The Service Air System provides essential compressed air capacity to support facility operations.
To maintain this system, several key replacements and system refurbishments are required:
• Building 913: Six (6) rotary-screw air compressors require replacement.
• Building 878: Four (4) rotary-screw air compressors require replacement. One (1) rotary-
screw compressor was replaced in 2020; it is in good working order but must be relocated and
integrated into the new facility layout.
• Building 541: One (1) obsolete centrifugal air compressor (CENTAC) and one (1) associated
desiccant dryer require replacement.
• Dryer Revitalization: Six (6) existing Ingersoll-Rand (IR) HB4000 desiccant dryers located
in Buildings 913 and 878 require complete refurbishment to restore them to full moisture-
removal capacity.
-- 1 of 6 --
17416-26-001
NOT SENSITIVE
IRA-26-2125
Page 2 of 6
The critical assets involved in this program are outlined below:
Current Model
Number
Current Serial
Number
Location Project Action Required
HPE300-2S EE2816U08074 Bldg. 913 Replace with Water-cooled
RS220IE
HPE300-2S EE2817U08084 Bldg. 913 Replace with Water-cooled
RS220IE
HPE300-2S EE3262U11101 Bldg. 913 Replace with Water-cooled
RS220IE
HPE300-2S EE3261U11101 Bldg. 913 Replace with Water-cooled
RS220IE
HPE300-2S EE3260U11098 Bldg. 913 Replace with Air-cooled RS220IE
HPE300-2S EE3263U11102 Bldg. 913 Replace with Air-cooled RS220IE
HPE300-2S EE3033U09107 Bldg. 878 Replace with Air-cooled RS220IE
HPE300-2S EE3032U09106 Bldg. 878 Replace with Air-cooled RS220IE
RS220ie MOX1002634 Bldg. 878 Relocate and Reinstall (Keep Unit)
HPE300-2S EE3030U09104 Bldg. 878 Replace with Water-cooled
RS220IE
HPE300-2S EE3031U09106 Bldg. 878 Replace with Water-cooled
RS220IE
HB4000 301050 Bldg. 913 Refurbish to Full Capacity
HB4000 504074 Bldg. 913 Refurbish to Full Capacity
HB4000 504075 Bldg. 913 Refurbish to Full Capacity
HB4000 319459 Bldg. 878 Refurbish to Full Capacity
HB4000 319461 Bldg. 878 Refurbish to Full Capacity
HB4000 301050 Bldg. 878 Refurbish to Full Capacity
1CV14M2
(Centrifugal)
M97-9566 Bldg. 541 Replace with Water-cooled
RS220IE
EHD1000-FGH 97DEHD2095 Bldg. 541 Replace with 1800SCFM
Desiccant Dryer
Various (PS-
1125 / PSG-60)
Various Bldg.
913/878/541
Integrate and Revitalize
Condensate Systems
4.0 PROGRAM GOALS AND PERFORMANCE OBJECTIVES
The government's primary goals are to achieve a highly reliable service air footprint, minimize
operational downtime during installation, and optimize the total cost of ownership. The contractor
shall propose a technical approach to meet the following objectives:
Objective 1: Deliver Modernized and Reliable Air Generation Capacity
• Establish Baseline Capacity: Replace compressors with modern, highly efficient IR
equivalents that restore nominal base compressed air capabilities. The proposed configuration
should meet or exceed the following footprint specifications:
• Water-cooled Compressors (7 Units): Replacing Compressors 1-4 in Bldg. 913;
Compressors 10-11 in Bldg. 878; and the Centrifugal Compressor in Bldg. 541.
-- 2 of 6 --
17416-26-001
NOT SENSITIVE
IRA-26-2125
Page 3 of 6
• Air-cooled Compressors (4 Units): Replacing Compressors 5-6 in Bldg. 913 and
Compressors 7-8 in Bldg. 878.
• Asset Reuse Optimization: Successfully relocate, reinstall, and integrate the newly
inherited compressor (S/N: MOX1002634) within the updated layout of Bldg. 878,
ensuring its performance is optimized alongside the new installations.
• Form, Fit, and Function (FFF) Compatibility: The proposed replacement IR compressors,
desiccant dryers, and auxiliary skid components shall match or fit within the existing spatial,
structural, mechanical, and electrical footprints of Buildings 541, 878, and 913. The
contractor's solution shall minimize structural or architectural facility modifications, utilizing
existing equipment pads, access ways, and utility penetration points wherever technically
viable.
Objective 2: Optimize Air Quality and Dryness Capabilities
• Dryer Replacement: Implement a highly reliable desiccant air drying system in Bldg. 541
capable of handling at least an 1800 SCFM flow rate to ensure downstream air meets dewpoint
standards.
• Desiccant Dryer Revitalization: Fully refurbish all six (6) existing HB4000 desiccant dryers
(3 in Bldg. 913 and 3 in Bldg. 878) to restore them to original equipment manufacturer (OEM)
operational efficiency and capacity.
Objective 3: Seamless Integration with Base Infrastructure
• Utility Interconn…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 333912
PARTS KIT,COMPRESSOR 4310-01-480-5743
DEPT OF DEFENSE · Sources Sought · due November 25, 2026
43--PUMP,LIQUID OPERATE
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 30, 2026
43--AIR CLEANER,INTAKE
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 27, 2026
43--CYLINDER HEAD,COMPRESS
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 27, 2026
Mississippi River Project Office - Ingersoll Rand RS110iE Rotary Screw Air Compressors (Brand Name Only
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 30, 2026
43--CYLINDER SLEEVE
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 27, 2026