What this opportunity is
The Department of Agriculture is seeking a contractor to install a wildlife and rodent shield system at Shawnee National Forest in Illinois, aimed at protecting infrastructure and equipment from wildlife damage. This solicitation is set aside for total small businesses under NAICS 561710. Interested contractors should note that this is a solicitation notice, indicating that they will need to prepare a bid rather than simply track the opportunity. The work includes assessment, fabrication, and installation of protective materials, along with compliance with safety and building standards.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Statement of Work
Scope of Contract
Purpose:
This purpose of this Statement of Work is to define the tasks, responsibilities, and
deliverables associated with the installation of a wildlife and rodent shield system to
protect facility infrastructure, equipment, and building envelopes from damage caused by
wildlife and rodents.
Scope of Work:
The contractor shall provide all labor, materials, equipment, tools, transportation and
supervision required to install a complete wildlife and rodent shield system. Work includes,
but is not limited to:
• Assessment of facility vulnerabilities, including gaps, penetrations, vents, conduit
entries, and structural features that allow wildlife intrusion.
• Fabrication or provision of wildlife and rodent resistant shielding materials (e.g.,
stainless-steel mesh, metal flashing, reinforced covers).
• Installation of shielding components around:
o Electrical and communication conduit entries.
o HVAC penetration and outdoor units.
o Foundation vents and crawlspace access points.
o Any other identified wildlife and rodent access points.
• Sealing all penetrations with appropriate pest-resistant sealants.
• Ensuring system meets applicable building, safety, and USDA facility standards.
Contractor Responsibilities:
• Conduct a pre-installation site review with the designated facility representative.
• Provide documentation of materials, technical specifications, and installation
methods.
• Maintain a safe work environment and follow all OSHA and federal safety guidelines.
• Dispose of debris in accordance with local and federal requirements.
• Ensure all work zones remain clean and free of hazards.
-- 1 of 2 --
Government Responsibilities:
• Provide site access and escort where required.
• Identify facility-specific restrictions or security protocols.
• Review and approve contractor’s installation plan prior to work.
• Provide power, lighting, and access necessary for installation.
Deliverables:
• Written pre-installation assessment report.
• Completion of installation in accordance with scope.
• Post-installation inspection with facility representative.
• Final report including:
o Locations shielded
o Materials installed
o Photo of completed work
o Warranty information (if applicable)
Quality Assurance:
All work must be completed to professional standards. The contractor shall correct any
deficiencies at no additional cost to the government.
Payment:
Payment will be made upon acceptance of all deliverables and completion of the
installation.
-- 2 of 2 --